If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-105-21794 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.14,"lon":-81.84,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Olive Township | |
Operator Name: LIBERTY OIL & GAS CORP | |
Well Pad ID: | |
Farm/Lease Name: COLLINS C E | |
License Status: Final Restoration | |
License Date: 2014-09-24 | |
Spud Date: 1978-11-03 | |
Spud Drilling Contractor: | |
Final Drill Date: 1979-01-19 | |
Well Total Depth: 1928.00 ft | |
Configuration: Vertical | |
Latitude: 39.140000 | |
Longitude: -81.840000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1978-11-02 | 325 LIBERTY OIL & GAS CORP GeoDate 11/2/78 |
Original Spud | 1978-11-03 | |
Completed | 1979-01-19 | |
Reached Total Depth | 1979-01-19 | |
APP | 2014-09-24 | Proposed Formations:BEREA, Issued Date:9/24/2014, Expired Date:9/23/2016 12:00:00 PM, Drilling unit acres:81.5, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2015-07-26 | |
Construction Permit Expires | 2016-09-23 | |
Record Last Modified | 2017-02-10 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 1850 | 1957 | 1 |
1850 | 1957 | 1 | |
1850 | 1957 | 1 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 738 Bbl | 63000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | LIBERTY OIL & GAS CORP | 6251.00 | 0.00 | 365 |
1985 | LIBERTY OIL & GAS CORP | 4690.00 | 59.00 | 365 |
1986 | LIBERTY OIL & GAS CORP | 6540.00 | 0.00 | 365 |
1987 | LIBERTY OIL & GAS CORP | 5451.00 | 0.00 | 365 |
1988 | LIBERTY OIL & GAS CORP | 5687.00 | 65.00 | 365 |
1989 | LIBERTY OIL & GAS CORP | 4616.00 | 0.00 | 365 |
1990 | LIBERTY OIL & GAS CORP | 3729.00 | 0.00 | 365 |
1991 | LIBERTY OIL & GAS CORP | 3380.00 | 37.00 | 365 |
1992 | LIBERTY OIL & GAS CORP | 2988.00 | 0.00 | 365 |
1993 | LIBERTY OIL & GAS CORP | 2462.00 | 31.00 | 365 |
1994 | LIBERTY OIL & GAS CORP | 1989.00 | 7.00 | 365 |
1995 | LIBERTY OIL & GAS CORP | 1735.00 | 0.00 | 365 |
1996 | LIBERTY OIL & GAS CORP | 1567.00 | 0.00 | 365 |
1997 | LIBERTY OIL & GAS CORP | 1911.00 | 15.00 | 365 |
1998 | LIBERTY OIL & GAS CORP | 1693.00 | 0.00 | 365 |
1999 | LIBERTY OIL & GAS CORP | 1755.00 | 11.00 | 365 |
2000 | LIBERTY OIL & GAS CORP | 1800.00 | 0.00 | 365 |
2001 | LIBERTY OIL & GAS CORP | 1725.00 | 0.00 | 345 |
2002 | LIBERTY OIL & GAS CORP | 1723.00 | 0.00 | 323 |
2003 | LIBERTY OIL & GAS CORP | 1424.00 | 0.00 | 267 |
2004 | LIBERTY OIL & GAS CORP | 1552.00 | 0.00 | 358 |
2005 | LIBERTY OIL & GAS CORP | 1327.00 | 34.00 | 342 |
2006 | LIBERTY OIL & GAS CORP | 1637.00 | 0.00 | 362 |
2007 | LIBERTY OIL & GAS CORP | 1485.00 | 0.00 | 365 |
2008 | LIBERTY OIL & GAS CORP | 1303.00 | 0.00 | 365 |
2009 | LIBERTY OIL & GAS CORP | 1018.00 | 0.00 | 273 |
2010 | LIBERTY OIL & GAS CORP | 934.00 | 0.00 | 273 |
2011 | LIBERTY OIL & GAS CORP | 1062.00 | 0.00 | 352 |
2012 | LIBERTY OIL & GAS CORP | 945.00 | 32.00 | 324 |
2013 | LIBERTY OIL & GAS CORP | 859.00 | 0.00 | 237 |
2014 | LIBERTY OIL & GAS CORP | 252.00 | 0.00 | 335 |
2015 | LIBERTY OIL & GAS CORP | 0.00 | 0.00 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-212311121 | 2015-7-28 0:00: | PB | No Violations | 3.00 |
-257539112 | 2015-7-16 0:00: | PB | No Violations | 2.00 |
-324162504 | 2015-7-20 0:00: | PB | No Violations | 3.50 |
0212311121 | 2015-07-28 | Plug / Plug Back | No Violations | The surface plug was tagged at 285 feet and 2 7/8 tubing was ran to this depth. The well was circulated and 123 sacks of Class A cement mixed with 2% gel was circulated to surface. The tubing was pulled and the cement was topped off. |
0257539112 | 2015-07-16 | Plug / Plug Back | No Violations | Bottom plug tagged at 1654 feet, telegraph found around 707 feet and company starts ripping the production casing. |
0324162504 | 2015-07-20 | Plug / Plug Back | No Violations | Witnessed 50 sacks of cement placed at 707 feet through 7 production casing as a rip plug using the batch mix method. |
0813756245 | 2015-07-15 | Plug / Plug Back | No Violations | Witnessed bottom hole plug set with batch mix method. The tubing was ran to a depth of 1843 and three batches of cement were mixed and pumped down hole one at a time. The company used 44 sacks of Satlor Essroc type I/II Portland cement. Each batch was weighed and found to be at least 15.6 ppg. 1000 foot gel spacer was ran before the cement plug. |
1057944930 | 2015-08-06 | Final Restoration | No Violations | Pits filled, area graded and area seeded, road restored, production equipment removed. Final restoration complete. |
1437155009 | 2015-07-17 | Plug / Plug Back | No Violations | The company ripped the pipe at 707 feet and pulled a joint to make sure they are free. |
1437669916 | 2015-07-22 | Plug / Plug Back | No Violations | The 7 casing was pulled up and set at 327 feet, the company began batch mixing the bottom of the surface casing plug and at 23 sacks the pop-off on the pump blew and the cap on the pump cracked disabling the pump. The cement was displaced out the 7 and the job was suspended until further notice. The company will pull the 7 casing and run back in with 2 3/8 tubing to tag the first part of the plug. Once plug depth has been identified the remainder of the plug will be placed. |
813756245 | 2015-7-15 0:00: | PB | No Violations | 7.30 |
For data sources see[9]