Well Details

Well ID: 34-105-20803
Loading map...
Country: United States
State: Ohio
County: Meigs
Municipality: Rutland Township
Operator Name: HISTORIC OWNER
Well Pad ID:
Farm/Lease Name: MCCORMICK BLANCHE
License Status: Final Restoration
License Date:
Spud Date: 1948-06-28
Spud Drilling Contractor:
Final Drill Date: 1948-07-31
Well Total Depth: 1444.00 ft
Configuration: Vertical
Latitude: 39.080000
Longitude: -82.120000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1948-06-28 12/1/2005 INSPECTION SHOWED THE WELL CONSISTED OF TUBING ONLY (RECORD SHOWS ALL CASING PULLED) WITHIN A HOLE FULL OF WATER. SOME GAS BUBBLES OBSERVED. I&O CASE # 2005 12 064. UPDATED LOCATION PER SURVEYOR COORDINATES-ALE 06/20/17
Completed 1948-07-31 12/1/2005 INSPECTION SHOWED THE WELL CONSISTED OF TUBING ONLY (RECORD SHOWS ALL CASING PULLED) WITHIN A HOLE FULL OF WATER. SOME GAS BUBBLES OBSERVED. I&O CASE # 2005 12 064. UPDATED LOCATION PER SURVEYOR COORDINATES-ALE 06/20/17
Reached Total Depth 1948-07-31 12/1/2005 INSPECTION SHOWED THE WELL CONSISTED OF TUBING ONLY (RECORD SHOWS ALL CASING PULLED) WITHIN A HOLE FULL OF WATER. SOME GAS BUBBLES OBSERVED. I&O CASE # 2005 12 064. UPDATED LOCATION PER SURVEYOR COORDINATES-ALE 06/20/17
Changed to Orphan Well Ready 2005-12-01 Changed Well To Orphan Ready
Correction to Well 2007-10-06 12/1/2005 INSPECTION SHOWED THE WELL CONSISTED OF TUBING ONLY (RECORD SHOWS ALL CASING PULLED) WITHIN A HOLE FULL OF WATER. SOME GAS BUBBLES OBSERVED. I&O CASE # 2005 12 064.
Plugged/Abandoned 2018-09-20 12/1/2005 INSPECTION SHOWED THE WELL CONSISTED OF TUBING ONLY (RECORD SHOWS ALL CASING PULLED) WITHIN A HOLE FULL OF WATER. SOME GAS BUBBLES OBSERVED. I&O CASE # 2005 12 064. UPDATED LOCATION PER SURVEYOR COORDINATES-ALE 06/20/17
Record Last Modified 2019-05-10 12/1/2005 INSPECTION SHOWED THE WELL CONSISTED OF TUBING ONLY (RECORD SHOWS ALL CASING PULLED) WITHIN A HOLE FULL OF WATER. SOME GAS BUBBLES OBSERVED. I&O CASE # 2005 12 064. UPDATED LOCATION PER SURVEYOR COORDINATES-ALE 06/20/17

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1099134385 2018-9-20 0:00: PB No Violations 7.00
-1119178694 2005-11-30 0:00 OR No Violations
-1305806870 2018-9-5 0:00:0 PB No Violations 3.80
-144181886 2017-3-10 0:00: OR No Violations 1.00
-1461237276 2018-9-24 0:00: PB No Violations 0.50
-1589333974 2016-8-4 0:00:0 OR No Violations
-1761057704 2018-9-12 0:00: PB No Violations 7.00
-2113219307 2018-10-1 0:00: PB No Violations 7.50
-29834086 2018-9-6 0:00:0 PB No Violations 5.80
-729602074 2005-12-6 0:00: OR No Violations
0029834086 2018-09-06 Plug / Plug Back No Violations 9/6/2018

7:00 AM Rig Crew on location installing diverter and flow line onto 10.75 drive pipe. 8:25 AM Inspector Parkins on location 9:00 AM Rig crew installing rotating head and rubber onto 4.5 washover pipe. 9:18 AM Rig crew picking up power swivel and 4.5 washover pipe with 4.5 milling collar on bottom.Will begin washover to clear 2.38 tubing annulus of prepared clay. 10:00 AM Rig crew begins washover operations. Gray clay and fine cuttings in returns. Good circulation established. 10:42 AM Two joints of 4.5 washover pipe downhole. Washover pipe is going downhole easily and the hole is cleaning up well. 11:00 AM Lunch 11:00-11:30 am 11:40 AM Rig crew resumes washover operations. 2:02 PM Eight joints of 4.5 washover pipe downhole. Currently at a depth of 270. Red/gray clay and fine cuttings in returns. 2:20 PM Rig crew shuts down operation due to debris accumulation in mud pump valves. 2:35 PM Inspector off location, rig crew will resume work after clearing mud pump of debris.

0144181886 2017-03-10 Orphan No Violations On location with DOGRM staff members Jake Glascock, Trisha Cartmell, and Nate Lane to evaluate the well site for hydrogeological and safety considerations. The information gathered today will be used in the hydrogeological and safety assessments for this orphan well plugging project.
0224200859 2017-04-26 Orphan No Violations On location with Orphan Well Program Manger Gene Chini to familiarize him with this orphan well location. Conditions at the well location have not changed since the last inspection.
0224246466 2016-07-25 Orphan No Violations Josh Schiering and I met with Steve Jenkins and Jenny Ridenour of the Meigs Co. SWCD to discuss the status of the well in the Orphan Well Program. The proposed route for ingress/egress was walked out and discussed. Mr. Jenkins was supplied with a Right of Entry Release Form and asked to complete and return it to the Division along with a copy of the current property deed/title insurance. Ms. Ridenour stated that the Meigs SWCD has applied twice to be considered for the Landowner Pass-Through Payment Plugging Agreement.
0255034252 2018-09-04 Plug / Plug Back No Violations 9/4/2018

8:00 AM Rig crew on location preparing to cement bottom plug. 1 tubing is set at 1449. 8:20 AM Inspector on location 10:00 AM Circulation established on well. Rig crew mix 1 sack gel ahead to condition shot hole below packer. 11:30 AM Rig crew mix & pump 40 sacks of Type I/II portland cement. Heavy cement returns observed at pit. Displace 1.4 bbls of freshwater then pull 2 joints of 1 tubing and circulate 2.38 tubing clean. 1:00 PM Lunch 1:00 - 1:30 pm 1:30 PM Measured quanitity of silt fence used. 500 LF 2:00 PM Inspector off location 4:30 PM Rig crew off location. Will be rigged up to drive 10.75 drive pipe tomorrow.

0457041821 2018-09-05 Plug / Plug Back No Violations 9/5/2018

8:00 AM Rig crew on location. Run tools into hole to tag bottom plug. Tag plug at 1391, indicating a good bottom plug was achieved. Inspector Matt Fulk on location. 9:00 AM Inspector on location 9:15 AM Rig crew rigging up vibratory hammer to drive 10.75 diameter drive pipe into wellbore. 10:00 AM 32 of 10.75 drive pipe driven into wellbore. Rig crew picking up next joint of drive pipe. 12:00 PM Crew lunch break 12:00-12:30 12:45 PM Rig crew drives 10.75 diameter drive pipe to refusal at 48. Inspector Fulk off location. 1:20 PM Inspector off location. Rig crew will install diverter head and prepare to begin washover operations tomorrow.

0582894150 2018-09-19 Plug / Plug Back No Violations 9/19/2018

8:00 AM MH Rig Crew and Appalachian Well Surveys (AWS) crew on location. 8:20 AM Inspector Parkins on location 8:30 AM AWS crew rigging up 12 shots to make a collar buster to shoot off the 2.38 dia. tubing. The shots are designed for use in 1.5 dia. tubing. 8:50 AM AWS crew running shots down 2.38 dia. tubing with sinker bar in place to see if it will go past tight spot at 338. The tools sat down at 338. 9:10 AM AWS crew running shots back down 2.38 dia. tubing without sinker bar in place and the shots went past the tight spot at 338 and down to a collar at 494. 9:15 AM AWS crew shoots tubing at 494 and the tubing came free. 9:30 AM MH rig crew hooks mud pump up to 2.38 tubing and begins pumping. Good circulation established, indicating the tubing is free in the wellbore. 9:35 AM AWS crew off location. 10:00 AM MH rig crew continues circulating on well. Pressure hose failure on rig, shut down to replace hose. 10:20 AM MH rig crew back to circulating. Sand and fine cuttings only in returns. 11:20 AM MH rig crew mixes gel tracer with cement pump and observes returns for gel to determine if there is a hole in the 2.38 tubing. Returns showed gel at approximately 40 bbls, indicating there are no holes in the tubing. 1:15 PM MH rig crew mixes and pumps 130 sacks of Type I/II cement weighing 15.6 lbs/gal. Displaced with 0.5 bbls of freshwater to a depth of 130 2:15 PM Crew pulls 2.38 tubing out of hole. 2 holes discovered in joint #15 (2 from bottom), however these holes did not affect the setting of the cement plug from 494-130. 2:50 PM MH rig crew runs bailer to 100 inside 10.75 drive pipe to ensure cement is well below casing seat. 3:20 PM Inspector Parkins off Location 4:30 PM MH rig crew off location.

0729602074 2005-12-06 Orphan No Violations Took new photographs of an orphan well.
0744920813 2008-01-09 Orphan No Violations Man made wetland was constructed between the well and the road.
0864612247 2017-03-17 Orphan No Violations On location with DOGRM staff members Rob Lowe, Tom Smith, Josh Schiering, and Paul Carder to evaluate the well site for surveying, environmental, and radiological considerations. Mr. Steve Jenkins of the Meigs SWCD was also present. The information gathered today will be used in the environmental and radiological assessments for this well plugging contract. The well location will be officially surveyed at another date.
1011944962 2018-09-13 Plug / Plug Back No Violations I arrived on location just after the rig crew who were washing clay out of a hole hit old casing. They called Gene Chini and devised a plan to move forward.
1099134385 2018-09-20 Plug / Plug Back No Violations 9/20/2018

8:00 AM MH Rig crew on location prepping to pull 10.75 drive pipe out of the wellbore. Rig crew tagged cement at a depth of 135. 8:15 AM Inspector Parkins on location 10:00 AM Rig crew attempting to pull 10.75 drive pipe, but it will not come free. Rig crew will rig up a drive clamp on their stem and attempt to drive the pipe further downhole and then attempt pulling again. 10:20 AM Rig crew was able to drive pipe further downhole and then pull the 10.75 drive pipe free successfully. 11:15 AM 10.75 diameter drive pipe successfully removed from wellbore. 11:35 AM Rig crew runs 87 of 8.63 diameter surface casing into the wellbore. Rig crew leaves casing hung in bowl slips at ground level. 11:45 AM 11:45-12:15 rig crew takes lunch break. 12:20 PM Rig crew runs 130 of 2.38 diameter tubing to just above the cement plug. Rig crew will cement the 8.63 diameter surface casing and set the surface plug simultaneously. 1:30 PM Rig crew mixes and pumps 104 sacks of Type I/II cement mixed at 15.6 lbs/gal. Heavy cement returns observed at surface both inside and outside the 8.63 diameter surface casing. The cement stayed at the surface after stopping pumps. 3:15 PM Inspector Parkins off location. MH Rig crew will wait on cement and begin demobilization activities tomorrow. 4:30 PM MH rig crew off location.

1108496802 2005-02-08 Orphan No Violations The well is leaking an insignificant amount of gas. There is not a tank or any other surface equipment present. Took photographs.
1119178694 2005-11-30 Orphan No Violations Title search at Meigs County Courthouse.
1305806870 2018-09-05 Plug / Plug Back No Violations Witnessed contractors drive pipe to approximately 47 feet with a soil compactor.
1427958547 2018-09-11 Plug / Plug Back No Violations 9/11/2018

8:00 AM Rig crew on location, resume washover operations with 4.5 washover pipe and milling collar. 11:15 AM Inspector Parkins on location. Rig crew eating lunch. Mark Hines informed that the well kicked off and brought a moderate volume of gas and water to surface out of the diverter and into the pit. The gas also cut the casing seat of the 10.75 diamter drive pipe and began flowing up its annulus. Operations are now shut down for the day. MH Rig crew will attempt to drive the 10.75 diameter casing further downhole tomorrow in an attempt to re-establish a competent casing seat. 1:25 PM Rig crew off location 2:00 PM Inspector Parkins off location.

1447774164 2019-7-23 0:00: FR No Violations 0.50
1461237276 2018-09-24 Plug / Plug Back No Violations 9/24/2018

9:10 AM Inspector Parkins on location to check progress of contractor demobilization. Service rig, mud pump, cement pump, and tubing trailer removed from location. 9:25 AM Checked status of plugged well and observed natural gas bubbling through the soil approxiately 2 away from the well casing. No gas is coming from inside the 8.63 surface casing or immediately near the casing annulus. A vault and vent system will need to be installed on the well to contain and safely vent the stray gas. 9:40 AM Inspector Parkins off location.

1468516345 2016-07-13 Orphan No Violations Upon inspection, it was observed that this well is idle and is likely orphan. The well area is overgrown with brushy vegetation. The well consists of 2.375 production tubing rising 4 from the ground to a tee. One fitting of the tee has a 2 pipe nipple, elbow, and bull plug. The other fitting has a 2 pipe nipple to a 2 gate valve, elbow, and 2 flow line which extends 10 east from the well before it is buried. The valve is in the closed position. There is fresh water ponded around the tubing on the ground covering an area 3 in diameter and 6 deep. There is gas bubbling out of the freshwater at a slow to moderate rate. The PhD6 gas meter did not detect an ambient reading of CH4 or LEL. The well is located on the Meigs County Soil and Water Conservation Districts Conservation Area and is near a mowed path used for walking. Access to the well is off of Old Lima Road (County Road 3) and would use the existing driveway to the conservation area. From the driveway, access to the well is through a gate and around the shelter house and restrooms to the left through a haymeadow, across a small drainage ditch, along a cut path through trees, and north along the woodline to the well. Steel plates would be needed to bring equipment across the ditch. The current SEM score is 206. Photos were taken of the location.
1541008814 2018-08-30 Plug / Plug Back No Violations 8/30/2018

12:00 PM Inspector on location, MH Rig Crew moving equipment onto location. 12:30 PM Crew offloading 4.5 washover pipe and 1 tubing. 12:40 PM Mark Hines installed new 2.38 nipple and ball valve on existing 2.38 production tubing to control well. Very minimal pressure on tubing. 12:45 PM Inspector off location 1:00 PM Crew off location to pick up more equipment from P#60768

1589333974 2016-08-04 Orphan No Violations Visited location to take new pictures of the well, ingress/egress route, and site conditions.
1608802311 2017-06-13 Orphan No Violations On location with DOGRM Engineer Kris Roser to evaluate ingress/egress and site engineering considerations. Access to this location will be through the parking lot to the Meigs County SWCD Conservation area, around the shelter house and restrooms, across a small drainage, and north through the hay meadow to the well. A section of guardrail will need to be removed temporarily to allow equipment access beyond the parking lot.
1761057704 2018-09-12 Plug / Plug Back No Violations 9/12/2018

8:20 AM Rig crew on location 8:25 AM Inspector Parkins on location 9:30 AM Rig crew pulls 4.5 washover pipe out of hole temporarily to allow for the vibratory hammer to be used to drive more 10.75 drive pipe into the well. 11:00 AM Rig crew picking up and threading in 14 joint of 10.75 casing. 11:30 AM Rig crew lunch break 11:30 -12:00 12:00 PM Rig crew picking up vibratory hammer and preparing to drive 10.75 drive pipe. 12:40 PM 10.75 drive pipe driven to a depth of 60. Rig crew stops to allow Mark Hines to weld a collar onto the casing. 2:10 PM Rig crew drives 10.75 drive pipe to refusal by competent bedrock at a depth of 64. 2:15 PM Rig crew re-attaching diverter head and flow line. 2:30 PM Rig crew running 4.5 washover pipe with milling collar back into hole. 3:20 PM 4.5 washover pipe running into hole slowly. 7 joints currently downhole. Rig crew may need to wash last few joints downhole to re-establish previous progress. 3:25 PM Inspector Parkins off location. 4:30 PM MH Rig crew off location.

1956688761 2018-09-18 Plug / Plug Back No Violations 8:00 AM

MH rig crew on location, prepping tubing ripping tools to attempt to rip 2.38 tubing below a tight spot at 338. 8:20 AM Inspector Parkins on location 9:00 AM Rig crew picking up tubing ripping tools without ripping knife in place to see if tools with go down past 338. 9:20 AM Tools will not go past tight spot at 338. 9:30 AM Inspector Matt Fulk on location 9:55 AM Inspector Parkins off location to make phone call to Program Manager Gene Chini. 11:15 AM Inspector Parkins back on location. Decision made to contact Appalachian Well Surveys to have them shoot the 2.38 tubing off with 1.5 tubing shots. 12:30 PM Inspector Parkins and Inspector Fulk off location.

1985551255 2018-08-31 Plug / Plug Back No Violations 8/31/2018

8:00 AM Rig crew on location, rigging up sinker bar to run into 2.38 tubing to check total depth of well. 8:20 AM Inspector on location 9:15 AM Rig crew run tools into 2.38 tubing and tag total depth at 1453. Minimal gas displacement out of tubing with tools. Some oil present on tools when removed from well. 10:20 AM Rig crew begins running 1 tubing into 2.38 tubing. 20 joints of 1 tubing being used. 10:30 AM Mark Hines begins trenching along lease road for silt fence installation. 11:00 AM Inspector off location 4:30 PM Rig crew off location. Will return to set bottom plug on Tuesday, 9-4-18.

2113219307 2018-10-01 Plug / Plug Back No Violations 10/1/2018

8:00 AM Inspector Parkins and MH rig crew on location preparing to install vault and vent system on well to contain and safely vent stray gas which is being produced near the plugged well. #57 stone, Vault casting, vent lines, and Quikrete on location. 9:55 AM Steve Jenkins and Jenny Ridenour of Meigs County SWCD on location to decide on an appropriate location for the gas vent line. 11:10 AM MH rig crew excavates around 8.63 diameter surface casing and cuts casing 30 below grade level. 11:30 AM MH rig crew lays #57 stone gravel base and places the concrete vault casting in place around the well. Rig crew then mixes 10 sacks of Quikrete and pours a floor in the vault casting around the well. 1:00 PM MH rig crew installs 2 diameter galvanized steel vent line in excavated trench which runs approximately 50 to the north of the well into the woodline. 1:30 PM MH rig crew begins backfilling trench and compacting soil in 6 lifts with a plate compactor. 2:40 PM Vent line cemented in place with a 12 diameter post form and 10 sacks of Quikrete. 2:45 PM MH rig crew dumping dry sacks of Quikrete around the outside of the vault casting before installing vault lid and finishing backfilling and complacting. 3:30 PM MH rig crew installs gasket material, vault casting lid, and manhole cover. Backfill and compaction will be finished before crew leaves today. 3:35 PM Inspector Parkins off location

224200859 2017-4-26 0:00: OR No Violations 1.00
224246466 2016-7-25 0:00: OR No Violations 3.00
255034252 2018-9-4 0:00:0 PB No Violations 5.50
457041821 2018-9-5 0:00:0 PB No Violations 4.00
582894150 2018-9-19 0:00: PB No Violations 7.00
744920813 2008-1-9 0:00:0 OR No Violations
864612247 2017-3-17 0:00: OR No Violations 1.00