If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-25037 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.06,"lon":-82.03,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Harrisville Township | |
Operator Name: DEVON ENERGY PRODUCTION CO LP | |
Well Pad ID: US-OH-000615 | |
Farm/Lease Name: RICHMAN FARMS | |
License Status: Dry and Abandoned | |
License Date: 2011-11-02 | |
Spud Date: 2012-02-17 | |
Spud Drilling Contractor: ADVANCED ENERGY SERVICES LLC | |
Final Drill Date: 2012-03-11 | |
Well Total Depth: 8664.00 ft | |
Configuration: Vertical | |
Latitude: 41.060000 | |
Longitude: -82.030000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-11-02 | Proposed Formations:OHIO SHALE THRU BLACK RIVER, Issued Date:11/2/2011, Expired Date:11/1/2013 12:00:00 PM, Drilling unit acres:152.921, Proposed Well Type:ST, Proposed Well Class:STRT |
Reached Total Depth | 2012-03-11 | |
Plugged Back | 2012-03-15 | |
Completion Report Received | 2012-09-19 | |
Plugged/Abandoned | 2012-11-09 | |
End of Confidential Data | 2013-03-11 | |
Construction Permit Expires | 2013-11-01 | |
Record Last Modified | 2015-07-01 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-01-29 | 5715 | 5963 | 24 |
2013-01-29 | 8266 | 8476 | 24 |
2013-01-29 | 6865 | 7076 | 24 |
2013-01-29 | 7145 | 7356 | 24 |
2013-01-29 | 7424 | 7636 | 24 |
2013-01-29 | 6025 | 6236 | 24 |
4785 | 4996 | 24 | |
4785 | 4996 | 24 | |
2013-01-29 | 6305 | 6516 | 24 |
2013-01-29 | 4785 | 4996 | 24 |
2013-01-29 | 5095 | 5306 | 24 |
2013-01-29 | 5410 | 5616 | 24 |
2013-01-29 | 6585 | 6796 | 24 |
2013-01-29 | 7705 | 7916 | 24 |
2013-01-29 | 7985 | 8196 | 24 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/14/2012 | 05/14/2012 | 4154.00 | 2,572,682.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ( by mass)** ( by mass)** | |||||||
FR-66 Friction Reducer | Halliburton Energy Services | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
WG-36 GELLING AGENT | Halliburton Energy Services | Gelling Agent | ||||||
CLA-WEB | Halliburton Energy Services | Additive | ||||||
LoSurf 300D | Ethanol | 64-17-5 | 60.00 | 0.04 | ||||
naphtha | ||||||||
Solvent naphtha, petroleum, heavy arom. | 64742-94-5 | 30.00 | 0.02 | |||||
1,2,4-Trimethylbenzene | 95-63-6 | 1.00 | 0.00069000 | |||||
100 MESH | Halliburton Energy Services | Acid | 100.00 | 1.14 | ||||
FE ACID - 10 HCL | Halliburton Energy Services | Acid | Hydrochloric acid | 7647-01-0 | 30.00 | 1.13 | ||
GBW-30 BREAKER | Halliburton Energy Services | Breaker | ||||||
20/40 | Halliburton Energy Services | Acid | ||||||
BE-9 Biocide | Halliburton Energy Services | Biocide | Tri-n-butyl tetradecyl phosphonium chloride | 81741-28-8 | 10.00 | 0.00475000 | ||
Fresh Water | Operator | 100.00 | 85.50 | |||||
LoSurf 300D | Halliburton Energy Services | Nonionic Surfactant | ||||||
Sand Premium | Halliburton Energy Services | Acid | 100.00 | 11.91 | ||||
LCA-1 Solvent | Halliburton Energy Services | Solvent | ||||||
OptiKleen-WF | Halliburton Energy Services | Concentrate |
For data sources see[4]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | DEVON ENERGY PRODUCTION CO LP | Brine | 20217 | 75 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1098902035 | 2012-2-28 0:00: | DD | No Violations | 2.00 |
-1204105519 | 2012-2-22 0:00: | DD | No Violations | 2.00 |
-1468365684 | 2012-3-21 0:00: | DD | No Violations | |
-1478632480 | 2012-8-7 0:00:0 | PW | No Violations | |
-1512656775 | 2012-3-30 0:00: | DD | No Violations | |
-15505492 | 2012-5-16 0:00: | DD | No Violations | |
-1559625036 | 2012-3-21 0:00: | DD | No Violations | |
-1566973637 | 2012-1-24 0:00: | DD | No Violations | |
-1714850472 | 2012-3-28 0:00: | DD | No Violations | |
-1737105389 | 2012-3-27 0:00: | DD | No Violations | |
-1751013213 | 2012-3-6 0:00:0 | DD | No Violations | |
-175416702 | 2012-3-14 0:00: | DD | No Violations | |
-1754914626 | 2012-2-23 0:00: | DD | No Violations | 2.00 |
-1765292614 | 2012-5-18 0:00: | DD | No Violations | |
-1858106240 | 2012-3-16 0:00: | DD | No Violations | |
-2018901533 | 2012-2-29 0:00: | DD | No Violations | 4.00 |
-212880165 | 2012-3-15 0:00: | PB | No Violations | |
-251177886 | 2012-1-20 0:00: | DD | No Violations | |
-373576294 | 2012-3-26 0:00: | DD | No Violations | |
-430625508 | 2012-2-27 0:00: | DD | No Violations | 8.00 |
-531347736 | 2012-3-1 0:00:0 | DD | No Violations | |
-619966803 | 2012-3-5 0:00:0 | DD | No Violations | |
-728907459 | 2012-5-17 0:00: | DD | No Violations | |
-876464671 | 2012-1-30 0:00: | DD | No Violations | |
0015505492 | 2012-05-16 | Drill / Deepen / Reopen | No Violations | Well stimulation process is continuing on this well. I witnessed the completion of Stage #6, Stage #7 and Stage #8 on this date with no problems, issues or incidents during the stimulation process. |
0161054264 | 2012-02-18 | Drill / Deepen / Reopen | No Violations | Company drilled out gel from 90 deep, 20 diameter hole and set 89 of 16 conductor casing, using 8 yards of 9 sack grout, cemented into the annular space from the top down. Recovered 45 gallon of water using a vacuum truck. Company then drilled 8 deep by 8 diameter hole and placed an 8 high corrugated pipe into the opening. The company then filled this pipe to a depth of 4 using 8 yards ready mix cement to stabilize the conductor casing. I was present for this operation. |
0175416702 | 2012-03-14 | Drill / Deepen / Reopen | No Violations | My rig status check found the wire line survey is nearly completed. Anticipate cementing of vertical hole on 3/15. No violations found. |
0212880165 | 2012-03-15 | Plug / Plug Back | No Violations | Halliburton cemented the vertical hole in two stages. Stage #1 cemented from 4/181 to 3,800 using 266 sacks Class A cement with Pozmix A and 50# premix. The stage #1 cement was allowed to cure for six (6) hours. Stage #2 was cemented from 3,800 to 3,058 using 302 sacks Class A cement. |
0251177886 | 2012-01-20 | Drill / Deepen / Reopen | No Violations | On my inspection on this date, I met with Dean Ward, the site construction consultant to Devon Energy. No violations found. Well site construction continuing. |
0297693943 | 2012-02-06 | Drill / Deepen / Reopen | No Violations | My inspection today found no violations. Well site construction is continuing. |
0373576294 | 2012-03-26 | Drill / Deepen / Reopen | No Violations | My site inspection found no violations. Currently drilling the horizontal leg at 7,759. |
0396301469 | 2012-03-23 | Drill / Deepen / Reopen | No Violations | The rig is drilling the horizontal leg at 6,371. My inspection found no violations. |
0430625508 | 2012-02-27 | Drill / Deepen / Reopen | No Violations | I witnessed the testing of the Blow Out Preventer (BOP) by Greene Energy. The test started at 10:00 AM and ended at 2:00 PM. The BOP passed this test. The BOP was also pressure tested by Petroset Services. The BOP also passed this test. |
0510955005 | 2012-02-14 | Drill / Deepen / Reopen | No Violations | My inspection of this well found no violations. Well site construction is continuing. |
0531347736 | 2012-03-01 | Drill / Deepen / Reopen | No Violations | I conducted a status check of this site and did not find any violations or safety issues. The rig is drilling the vertical hole at 3,550. |
0541326060 | 2012-11-08 | Plug / Plug Back | No Violations | I inspected this well and found that Mercer Well Service had arrived on site and was rigging up. The service rig crew removed the top portion of the christmas tree type wellhead and then installed a B.O.P. ( Blowout Preventer Stack ). The crew then began to run a string of 2.875 in. back into the well to be used as a working string. 110 sections of the 2.875 in. tubing was delivered earlier to the wellsite and each section was approx. 32 ft. in length. A total of 3500 ft. of 2.875 in. tubing was run into the well to determine the fluid level. The well was then swabbed and the fluid was directed into a nearby 500 bbl. frac tank. The string of 2.875 in. tubing was then tripped out of the hole again. |
0550215310 | 2012-02-01 | Drill / Deepen / Reopen | No Violations | My inspection of the well site found no violations. Well site construction is continuing. |
0554831247 | 2013-07-15 | Final Restoration | No Violations | Inspect well location well has been plugged. Well pad has not been removed. Spoke with landowner. Contacted operator; indicated that the leases were being sold and the restoration of the location was part of the lease sale. |
0612843740 | 2012-03-02 | Drill / Deepen / Reopen | No Violations | My site inspection found no violations. The rig is drilling ahead at 3,665. |
0619966803 | 2012-03-05 | Drill / Deepen / Reopen | No Violations | My site inspection found the rig core drilling at 3,800. No violations were noted. |
0700853797 | 2012-03-13 | Drill / Deepen / Reopen | No Violations | Baker Hughes is continuing the survey process. Company estimates survey to be completed within the next 24 hours. My inspection of the well site found no violations. |
0712427690 | 2012-02-27 | Drill / Deepen / Reopen | No Violations | During my inspection I walked the drill site. There were no violations or safety issues noted. |
0728907459 | 2012-05-17 | Drill / Deepen / Reopen | No Violations | Well stimulation process continuing on this well. I witnessed the completion of Stage#9, Stage #10 and Stage #11 with no problems, issues or incidents reported. |
0874823903 | 2012-03-09 | Drill / Deepen / Reopen | No Violations | Vertical hole being washed out to begin testing by Baker Hughes. The following testing/logging is to be completed. Induction and GR from Total Depth (TD) to 3,800, Density/Neutron from TD to 3,800,. UltraSonicXplorer from TD to 3,800, Testing anticipated to cover three days. My inspection of the well site found no violations. |
0876464671 | 2012-01-30 | Drill / Deepen / Reopen | No Violations | My inspection of the well site found no violations. Well site construction is continuing. |
0919411589 | 2012-01-18 | Drill / Deepen / Reopen | No Violations | My inspection of well site found site construction continuing. No violations found. |
0974444985 | 2012-05-14 | Drill / Deepen / Reopen | No Violations | Stimulation of well is in progress. Stage #1, #2, and #3 were completed on this date. DNR Inspector Thomas Benko was present for Stage #1 and I was present for Stages #2 and #3. My inspection found no problems, incidents or issues. |
0987854963 | 2012-02-17 | Drill / Deepen / Reopen | No Violations | Well was spudded on this date. The 20 conductor casing hole was drilled to 90. During drilling, water returned to surface, and 25 sacks of gel was added to solidify the hole. It was determined to allow the gel to sit overnight for solidification. |
1026005344 | 2012-01-26 | Drill / Deepen / Reopen | No Violations | My inspection of well site found no violations. Well site construction is continuing. |
1080472193 | Drill / Deepen / Reopen | No Violations | Drilling off top of cement to turn into vertical. They should complete curve over the weekend. Walked site, no violations found. | |
1098902035 | 2012-02-28 | Drill / Deepen / Reopen | No Violations | My inspection found the rig drilling the 8.75 vertical hole at a depth of 1,400. No incidents or spills reported. |
1204105519 | 2012-02-22 | Drill / Deepen / Reopen | No Violations | My inspection today found drilling equipment moving on site and drilling rig being set up. |
1221061513 | 2012-03-07 | Drill / Deepen / Reopen | No Violations | My site inspection found no violations. Rig is drilling ahead at 3,990. |
1244503056 | 2012-02-21 | Drill / Deepen / Reopen | No Violations | My inspection today was to monitor site preparation. This site is almost ready for rig move in/setup. |
1283342644 | 2012-03-12 | Drill / Deepen / Reopen | No Violations | My drilling status check found rig at a total depth of 4,181. A washout, approximately 10 wide, was detected at approximately 2,600. Company will correct with 35% excess cement. Baker Hughes is continuing the survey process. |
1322495841 | 2011-11-16 | Drill / Deepen / Reopen | No Violations | The well has been permitted but there has been no activity at the location. According to the operator, there is approximately three weeks of excavation work to build the location before the rig moves in. |
1334670877 | 2012-04-17 | Completion Testing | No Violations | My inspection of the well site found no violations or problems. Devon Energy is performing D-Fit test per company plan submitted to inspector. |
1337019288 | 2012-05-08 | Drill / Deepen / Reopen | No Violations | Visited well site on this date.Tanks and associated equipment for well stimulation process being placed on site. Well stimulation to begin on 05/14/2012. My inspection found no violations. |
1337345079 | 2012-05-15 | Drill / Deepen / Reopen | No Violations | On this date I was present for Stages #4 and #5 of the stimulation process, which were completed with no problems, issues or incidents. My inspection of the well site found no violations. |
1337696276 | 2012-01-16 | Drill / Deepen / Reopen | No Violations | Well site construction began on 01/16/2012. Kwest Construction was contractor. Access road being constructed using best management practices for well site construction. Well permit posted at roadway entrance into well site. |
1337699911 | 2012-02-21 | Drill / Deepen / Reopen | No Violations | My inspection today was to monitor site preparation. This site is almost ready for rig move in and set up. |
1338469371 | 2012-05-31 | Drill / Deepen / Reopen | No Violations | My inspection today found Nabors Well Services, (subcontractor to Devon Energy), preparing to remove the fracturing stack from the well and preparing to insert tubing into the well. Tubing to be installed is 2.875 with a 3.25 barrel pump. Rods with a diameter of .875 with guides will be installed inside the tubing. Total depth of tubing and rods will be 3,175 and a 1500 pound Blow Off Preventer head with a standard 2.00 T with valves and checks will be installed below the stuffing box. No reports of injuries, incidents or spills reported. |
1338986084 | 2012-06-06 | Production Wells | No Violations | Meeting on site with DNR Inspector Ray Wallace to inspect hydraulic pumping unit for Utica Shale well. |
1354132599 | 2012-11-06 | Plug / Plug Back | No Violations | I inspected this well location ahead of the plugging operations that are to commence on 11/09/12. I found a large christmas tree type wellhead in place and the electric powered artificial lift pump was gone from the wellhead. The only other equipment still on site was an off road type forklift. I noticed that the former cellar area that was below the rig superstructure was filled with pea gravel and aprrox. 4 in. of standing water could be seen on top of the pea gravel. Also the former rat hole was still in place and it was filled completely to the surface with water. I utilized a Quani Tab testing strip to test for chlorides in the water at the former cellar area. The low range Quani Tab strip maxed out on the scale. I then used a high range Quani Tab strip and its result stopped at 8.7 units mg/L Cl. According to the strips, 8.8 units would equal 6,562 ppm Cl. Next, I tested the water that accumulated in the former rat hole for chlorides. I utilized a low range Quani Tab test strip and it maxed out on the scale. I then used a high range Quani Tab strip and its result stopped at 8.8 units mg/L Cl. According to the strips, 8.8 units would equal 6,562 ppm of Cl. |
1354208706 | 2012-11-09 | Plug / Plug Back | No Violations | I arrived on site and found that Gray Wireline Service was rigging up their equipment in order to set the CIBP ( Cast Iron Bottom Plug ). The CIBP was set at 3220 ft. and Gray Wireline Service riggged down their equipment. Mercer Well Service then ran 3220 ft. of 2.875 in. tubing back into the well. The tubing string was touched down on top of the CIBP and then pulled up a few inches. Next, O-Tex Pumping Service rigged up their cementing equipment and filled the hole with 40 bbls. of brine water and pressured up to verify that the CIBP was holding in place. After a short time of pumping, representatives from Devon Energy, O- Tex Pumping Service and myself observed the pressure gauge on the wellhead holding a pressure of approx. 4500 psi. After waiting ten minutes, the pressure was again verified to be holding at approx. 4500 psi. The pressure was then released on the well. O- Tex then pumped 3 bbls. of fresh water and tested their cement pumping lines to 1000 psi. and then circulated hole volume until the brine water was removed. For Plug #1, O-Tex pumped 25 sks. of Class H cement followed by 17.36 bbls. of fresh water for displacement of the plug. Plug #1 was placed from 3220 ft. to 3020 ft. The service rig crew then pulled 11 joints of the 2.875 in. tubing in order to set the next plug. For Plug #2, O-Tex pumped 31 sks. of Class H cement followed by 14.84 bbls. of fresh water for displacement of the plug. Plug #2 was placed from 2840 ft. to 22590 ft. The service rig crew then pulled 40 joints of the 2.875 in. tubing in order to set the next plug. For Plug #3, O-Tex pumped 19 sks. of Class H cement followed by 8.3 bbls. of fresh water for displacement of the plug. Plug #3 was placed from 1600 ft. to 1450 ft. The service rig crew then pulled 27 joints of the 2.875 in. tubing in order to set the next plug. For Plug #4, O-Tex pumped 25 sks. of Class H cement followed by 2.98 bbls. of fresh water for displacement of the plug. Plug #4 was placed from 73 |
1468365684 | 2012-03-21 | Drill / Deepen / Reopen | No Violations | My site inspection found no violations. Rig is drilling ahead at 4,601, on the horizontal leg. |
1474196839 | 2012-02-26 | Drill / Deepen / Reopen | No Violations | Drilling of surface casing hole began 02/24/2012. My inspection today found that the rig has drilled the 12.25 hole to a depth of 635. The ran 635 of 9.675 (J55, 36#) surface casing. This casing was cemented casing to surface in two (2) stages, using a total of 330 sacks class a cement, 42 Barrels of cement return to surface. See cement report in well file. |
1478632480 | 2012-08-07 | Production Wells | No Violations | Inspect well. well completed. Well setup with Hydraulic pump jack. Flow back into frac tanks. |
1512656775 | 2012-03-30 | Drill / Deepen / Reopen | No Violations | My inspection found the drilling of the horizontal leg is complete. Baker Hughes is running open hole surveys. After surveys are complete, Devon Energy anticipates running and cementing production casing next week. |
1559625036 | 2012-03-21 | Drill / Deepen / Reopen | No Violations | AES Rig 27 was on location and running drill pipe back in the hole to begin drilling the horizontal leg of the well. The drilling fluids are contained in a closed loop aboveground steel tank system. Drill cutting are being solidified and removed for offsite disposal. The location was in good condition with no violations at this time. |
1566973637 | 2012-01-24 | Drill / Deepen / Reopen | No Violations | My inspection of well site found site construction continuing. No violations were found. |
1577155862 | 2012-03-08 | Drill / Deepen / Reopen | No Violations | My inspection found that rig has completed vertical drilling to a total depth of 4,181, for core samples. A total of five cores were taken on the well. Coring depths are #1 - 3,855 to 3,872, #2 - 3,872 to 3,962, #3 - 3,962 to 4,022, #4 - 4,022 to 4,113, #5 - 4,113 to 4,181. |
161054264 | 2012-2-18 0:00: | DD | No Violations | |
1615741818 | 2012-02-16 | Drill / Deepen / Reopen | No Violations | Well site construction is continuing. My inspection today found no violations. |
1686380396 | 2012-02-09 | Drill / Deepen / Reopen | No Violations | My inspection of this well site today found no violations. Site construction is continuing. |
1703869875 | 2013-08-05 | Final Restoration | No Violations | The well has been plugged. The pad still remains on the site along with the gates and fencing around it. The landowner said he had an agreement with the company that they would pick-up the gravel from the site and leave it as a pile for him. The topsoil has not yet been returned to its original condition and no grading or vegetation has been restored. Final restoration does not pass. |
1714850472 | 2012-03-28 | Drill / Deepen / Reopen | No Violations | No problems or violations were found during this inspection. Devon Energy anticipates completion of drilling today. When drilling is completed, they will pull drill pipe and conduct open hole surveys. These surveys will take 2-3 days and will be performed by Baker Hughes. |
1737105389 | 2012-03-27 | Drill / Deepen / Reopen | No Violations | My site status check found rig drilling ahead at 8,463. No violations or problems reported. |
1751013213 | 2012-03-06 | Drill / Deepen / Reopen | No Violations | My inspection found the rig core drilling at 3,953. No violations were found. |
1754914626 | 2012-02-23 | Drill / Deepen / Reopen | No Violations | My inspection found that the rig set up is continuing. Drilling should begin on 02/24/2012. |
1758096025 | 2012-05-14 | Production Wells | No Violations | Inspect well. Witness stage 2 of well stimulation. |
1765292614 | 2012-05-18 | Drill / Deepen / Reopen | No Violations | I witnessed the completion of well stimulation stage #12 and Stage #13 on this date. There were no problems, issues or incidents reported during this process. The stimulation process for this well is now complete. |
1853210775 | 2012-03-20 | Drill / Deepen / Reopen | No Violations | My site inspection found the rig had reached the end of the curve at 4,250. The hole will be washed six times prior to resumption of drilling. Drilling of horizontal leg to begin today. |
1858106240 | 2012-03-16 | Drill / Deepen / Reopen | No Violations | My rig status check found no violations. Drilling for the curve is beginning at eight (8) degrees per 100. |
1907181230 | 2012-03-19 | Drill / Deepen / Reopen | No Violations | My rig status check found the rig drilling at 8 degrees per 100 to the bottom of the curve. Horizontal should be reached today at a total depth of 4,250. |
2018901533 | 2012-02-29 | Drill / Deepen / Reopen | No Violations | I attended the on site safety/spud meeting with Devon Energy. The rig is drilling/coring the vertical hole at 2,500 with a target total depth of +/- 4,413. |
297693943 | 2012-2-6 0:00:0 | DD | No Violations | |
396301469 | 2012-3-23 0:00: | DD | No Violations | |
510955005 | 2012-2-14 0:00: | DD | No Violations | |
541326060 | 2012-11-8 0:00: | PB | No Violations | 4.00 |
550215310 | 2012-2-1 0:00:0 | DD | No Violations | |
554831247 | 2013-7-15 0:00: | FR | No Violations | |
612843740 | 2012-3-2 0:00:0 | DD | No Violations | |
700853797 | 2012-3-13 0:00: | DD | No Violations | |
712427690 | 2012-2-27 0:00: | DD | No Violations | |
874823903 | 2012-3-9 0:00:0 | DD | No Violations | |
919411589 | 2012-1-18 0:00: | DD | No Violations | |
974444985 | 2012-5-14 0:00: | DD | No Violations | |
987854963 | 2012-2-17 0:00: | DD | No Violations |
For data sources see[7]