X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-103-23672

Well Details

Well ID: 34-103-23672
Loading map...
Country: United States
State: Ohio
County: Medina
Municipality: Guilford Township
Operator Name: KING DRILLING CO
Well Pad ID:
Farm/Lease Name: LANDIS CLARENCE B
License Status: Producing
License Date: 1984-01-26
Spud Date: 1984-01-27
Spud Drilling Contractor: FRED INGRAHAM DRLG
Final Drill Date: 1984-03-20
Well Total Depth: 3697.00 ft
Configuration: Vertical
Latitude: 41.000000
Longitude: -81.790000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1984-01-20
CO 1984-01-26 255 KING DRILLING CO GeoDate 1/26/84
Oil and Gas 1984-01-26 Issued Date 1/26/84 Expired Date 7/24/84 Acres 0068470 Tool Type CT Proposed Formation CLINTON Proposed Depth 03697 Proposed Drill Depth 03697
Completed 1984-03-20
Reached Total Depth 1984-03-20
Completion Report Received 1984-04-16
Construction Permit Expires 1984-07-24
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3587 3650 12
3587 3650 12
3587 3650 12

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1500 Bbl 30000 NOT REPORTED;PRELIMINARY

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 KING DRILLING CO 7083.00 55.00 0
1986 KING DRILLING CO 6179.00 150.00 365
1993 KING DRILLING CO 2083.00 50.00 365
1995 KING DRILLING CO 1013.00 0.00 365
1996 KING DRILLING CO 1052.00 0.00 365
1997 KING DRILLING CO 983.00 39.00 365
1998 KING DRILLING CO 926.00 0.00 365
1999 KING DRILLING CO 698.00 51.00 365
2000 KING DRILLING CO 685.00 0.00 365
2001 KING DRILLING CO 586.00 0.00 365
2002 KING DRILLING CO 479.00 0.00 365
2003 KING DRILLING CO 447.00 0.00 365
2004 KING DRILLING CO 524.00 24.00 365
2005 KING DRILLING CO 193.00 0.00 365
2006 KING DRILLING CO 207.00 0.00 365
2007 KING DRILLING CO 219.00 0.00 365
2008 KING DRILLING CO 165.00 30.00 365
2009 KING DRILLING CO 133.00 0.00 365
2010 KING DRILLING CO 191.00 0.00 365
2011 KING DRILLING CO 126.00 28.00 365
2012 KING DRILLING CO 240.00 0.00 366
2013 KING DRILLING CO 219.00 0.00 365
2014 KING DRILLING CO 161.00 0.00 365
2015 KING DRILLING CO 176.00 0.00 365
2016 KING DRILLING CO 232.00 0.00 365
2017 KING DRILLING CO 164.00 0.00 365
2018 KING DRILLING CO 111.00 27.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 KING DRILLING CO Brine 0 0
1986 KING DRILLING CO Brine 0 365
1993 KING DRILLING CO Brine 0 365
1995 KING DRILLING CO Brine 0 365
1996 KING DRILLING CO Brine 0 365
1997 KING DRILLING CO Brine 0 365
1998 KING DRILLING CO Brine 0 365
1999 KING DRILLING CO Brine 27 365
2000 KING DRILLING CO Brine 0 365
2001 KING DRILLING CO Brine 0 365
2002 KING DRILLING CO Brine 0 365
2003 KING DRILLING CO Brine 0 365
2004 KING DRILLING CO Brine 24 365
2005 KING DRILLING CO Brine 0 365
2006 KING DRILLING CO Brine 0 365
2007 KING DRILLING CO Brine 0 365
2008 KING DRILLING CO Brine 11 365
2009 KING DRILLING CO Brine 0 365
2010 KING DRILLING CO Brine 0 365
2011 KING DRILLING CO Brine 11 365
2012 KING DRILLING CO Brine 0 366
2013 KING DRILLING CO Brine 0 365
2014 KING DRILLING CO Brine 0 365
2015 KING DRILLING CO Brine 0 365
2016 KING DRILLING CO Brine 0 365
2017 KING DRILLING CO Brine 0 365
2018 KING DRILLING CO Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1516450875 2014-5-1 0:00:0 PW No Violations
000PL11639 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
1428998091 2015-06-04 Production Wells No Violations Inspected production well on 06/04/2015. The tank battery consists of 1-50 bbl steel tank, 1-1,600 gal plastic tank, and 1-vertical separator located within an earthen dike. The well is equipped with a pump jack with a gas-powered motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
1516450875 2014-05-01 Production Wells No Violations Inspected production well on 05/01/2014. The tank battery consists of 1-100 bbl steel tank, 1-1,600 gal plastic tank, and a vertical separator located within an earthen dike. The well is equipped with a pump jack with a gas-powered motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
PL11639 PL No Violations

For data sources see[9]

References