| Well ID: 34-099-23203 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.9,"lon":-80.96,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Columbiana | |
| Municipality: Butler Township | |
| Operator Name: DORFMAN PRODUCTION COMPANY | |
| Well Pad ID: | |
| Farm/Lease Name: MILLER UNIT | |
| License Status: Producing | |
| License Date: 2014-06-19 | |
| Spud Date: 2014-06-28 | |
| Spud Drilling Contractor: ADVENT DRLG | |
| Final Drill Date: 2014-08-16 | |
| Well Total Depth: 5623.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.900000 | |
| Longitude: -80.960000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2014-06-19 | Proposed Formations:CLINTON, Issued Date:6/19/2014, Expired Date:6/18/2016 12:00:00 PM, Drilling unit acres:122.728, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2014-08-16 | |
| Completion Report Received | 2014-09-22 | |
| Construction Permit Expires | 2016-06-18 | |
| Record Last Modified | 2017-10-23 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2014-09-24 | 5421 | 5528 | 69 |
| 5421 | 5528 | 69 | |
| 5421 | 5528 | 69 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2014-07-16 | H2O | 0 | 168387 Gal | 120000 | OTHER | Nabors Completion Services |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2014 | DORFMAN PRODUCTION COMPANY | 3093.00 | 1824.00 | 159 |
| 2015 | DORFMAN PRODUCTION COMPANY | 1942.00 | 940.00 | 365 |
| 2016 | DORFMAN PRODUCTION COMPANY | 1713.00 | 667.00 | 365 |
| 2017 | DORFMAN PRODUCTION COMPANY | 1561.00 | 595.00 | 365 |
| 2018 | DORFMAN PRODUCTION COMPANY | 1852.00 | 465.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2014 | DORFMAN PRODUCTION COMPANY | Brine | 4155 | 159 |
| 2015 | DORFMAN PRODUCTION COMPANY | Brine | 284 | 365 |
| 2016 | DORFMAN PRODUCTION COMPANY | Brine | 199 | 365 |
| 2017 | DORFMAN PRODUCTION COMPANY | Brine | 147 | 365 |
| 2018 | DORFMAN PRODUCTION COMPANY | Brine | 194 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1637064886 | 2014-9-9 0:00:0 | PL | No Violations | 1.00 |
| -1673325856 | 2014-6-30 0:00: | DD | No Violations | 1.00 |
| -277247735 | 2014-7-9 0:00:0 | CT | No Violations | |
| -913526597 | 2014-6-29 0:00: | DD | No Violations | 2.50 |
| 0277247735 | 2014-07-09 | Completion Testing | No Violations | I was on site for a status check. The site was in good repair. The lining in the south pit needs pulled up. Operator will be contacted. |
| 0913526597 | 2014-06-29 | Drill / Deepen / Reopen | No Violations | I was on location to witness PetroSet cement the surface casing for Dorfman. Advent drilled a 14.75 Hole #1 to 493 rig floor (RF) and set 11.75 casing to 476 RF with 2 centralizers. Rig Floor was 12. PetroSet rigged up and established circulation with 15 barrels of fresh water. The operator mixed and pumped 300 sacks of Class A cement with 3% CaCl. The cement was displaced to 456 RF with 55 barrels of water. I witnessed 15 barrels of good cement returned to surface. After 15 minutes, cement was static at surface. |
| 1262158338 | 2014-07-16 | Completion Testing | No Violations | I was on site with Regional Supervisor Tom Hill to witness the fracturing of the well by Nabors. I found the lease road and pits to be in good repair. Drainage and erosion controls were in place. |
| 1410959865 | 2014-06-26 | Drill / Deepen / Reopen | No Violations | I performed a drilling site inspection. I GPS the well stake ( +/- 9/ 40.903080/-80.96246 ). Advent Drilling is moving equipment on location at this time. Sweet Meadows is digging the pits. The soil is very sandy. They will slope the side walls of the pits so they will be stable not to cave-in. I informed them that Inspector Rick Skidmore will be the contact person for the cementing and drilling operation starting 6/27/2014. |
| 1412261274 | 2014-07-15 | Drill / Deepen / Reopen | No Violations | Appalachian Well Surveys was on location to perforate the well. They assembled there perf gun and started in the 4.5 casing to perforate the well. When they located the area to perf they activated there wireline the shots would not go off after several attempts they came out of the hole to test the electric current of there wireline. They discovered that is was defective. There was a replacement unit on its way. All safety precautions were followed. |
| 1637064886 | 2014-09-09 | Preliminary Restoration | No Violations | I performed a preliminary restoration inspection on the location The tank battery is equipped with one 210 barrel tank and one 100 barrel tank and one horizontal separator. The well is equipped with a pumping unit with an electric motor. ID signs are posted. Vegetation has not been established. Can not pass Preliminary Restoration at this time. |
| 1646099636 | 2014-07-15 | Completion Testing | No Violations | I was on site to witness the perforating of the well with John Fleming. Nabors spotted 1000 gallons of 15% HCL acid in the hole prior to logging and perforating the well. Appalachian Well Survey logged the hole. Appalachian Well Survey was the perforating conractor. Eight 500 bbl tanks were moved on site since last inspection in preparation for the fracturing process. |
| 1673325856 | 2014-06-30 | Drill / Deepen / Reopen | No Violations | I was on location checking on the drilling of Hole #2. I found during my inspection that Advent was at a depth of 900 drilling on air. According to the operator, no water was encountered while drilling through the Berea Sandstone. The drilling permit was posted inside the dog house. |
| 1844419545 | 2014-10-04 | Preliminary Restoration | No Violations | I performed a preliminary restoration inspection on the location. The tank battery is equipped with one 100 barrel tank and one 50 barrel tank and one vertical separator. The well is equipped with a pumping unit with an electric motor. ID signs are posted. Vegetation has been established. Preliminary Restoration is Passed. |
For data sources see[9]