If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-099-23194 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01,"lon":-80.54,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Mahoning | |
| Municipality: Poland Township | |
| Operator Name: HILCORP ENERGY COMPANY | |
| Well Pad ID: US-OH-000621 | |
| Farm/Lease Name: POLAND-CLL1 | |
| License Status: Not Drilled | |
| License Date: 2013-07-02 | |
| Spud Date: | |
| Spud Drilling Contractor: | |
| Final Drill Date: | |
| Well Total Depth: | |
| Configuration: Horizontal | |
| Latitude: 41.010000 | |
| Longitude: -80.540000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2013-07-02 | Proposed Formations:POINT PLEASANT, Issued Date:7/2/2013, Expired Date:7/2/2015 12:00:00 PM, Drilling unit acres:2474.17, Proposed Well Type:OG, Proposed Well Class:EDPW |
| Construction Permit Expires | 2014-07-02 | |
| Record Last Modified | 2018-11-01 |
For data sources see[2]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1854066540 | 2013-9-15 0:00: | DD | No Violations | |
| -51216492 | 2019-7-12 0:00: | PW | No Violations | 1.00 |
| 1854066540 | 2013-09-15 | Drill / Deepen / Reopen | No Violations | Falcone Drilling Rig 18 drilled a 12.25 well bore to a total depth of 2500 and ran 2500 of 9.625 36# J-55 CSG casing. Baker Hughes pumped ahead 234 barrels of water followed by 35 barrels of Gel/Fed Seal/Cello Flake and 10 barrels. They pumped 872 sacks of PNE-1.05% STATSTATFREE=1%CACL2=.75GAL/SK FP-6. They displaced with 190 barrels of fresh water. There was no cement returned to surface. There was circulation throughout the job. Inspector Rick Skidmore covered this job. |
For data sources see[3]