If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-099-22747 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.07,"lon":-80.79,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Mahoning | |
| Municipality: Austintown Township | |
| Operator Name: BOBCAT WELL & PIPELINE LLC | |
| Well Pad ID: | |
| Farm/Lease Name: BODA # 1 | |
| License Status: Producing | |
| License Date: 1997-05-08 | |
| Spud Date: 1997-05-14 | |
| Spud Drilling Contractor: MOHAWK DRLG | |
| Final Drill Date: 1997-05-20 | |
| Well Total Depth: 5202.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.070000 | |
| Longitude: -80.790000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1997-05-08 | 2651 D & L ENERGY INC GeoDt 5/8/97 |
| Oil and Gas | 1997-05-08 | Issued Date 5/8/97 Expired Date 5/8/98 Acres 0047360 Tool Type RTAF Proposed Formation CLINTON Proposed Depth Proposed Drill Depth |
| Original Spud | 1997-05-14 | RBDMS Rec |
| Completed | 1997-05-20 | RBDMS Rec |
| Reached Total Depth | 1997-05-20 | RBDMS Rec |
| Completion Report Received | 1997-06-13 | RBDMS Rec |
| Change of Owner | 2015-01-27 | Operator changed from 2651, D & L ENERGY INC to 9426, BOBCATE WELL AND PIPELINE LLC |
| Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-08-15 | 4959 | 5032 | 40 |
| 4959 | 5032 | 40 | |
| 4959 | 5032 | 40 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 7 | 110390 Gal | 80000 | 500 gal FE acid |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1998 | D & L ENERGY INC | 21935.00 | 298.00 | 365 |
| 1999 | D & L ENERGY INC | 10991.00 | 86.00 | 365 |
| 2000 | D & L ENERGY INC | 9524.00 | 50.00 | 365 |
| 2001 | D & L ENERGY INC | 8815.00 | 69.00 | 365 |
| 2002 | D & L ENERGY INC | 6811.00 | 54.00 | 365 |
| 2003 | D & L ENERGY INC | 7411.00 | 0.00 | 365 |
| 2004 | D & L ENERGY INC | 7899.00 | 0.00 | 365 |
| 2005 | D & L ENERGY INC | 7146.00 | 68.00 | 365 |
| 2006 | D & L ENERGY INC | 6314.00 | 0.00 | 365 |
| 2007 | D & L ENERGY INC | 5122.00 | 0.00 | 365 |
| 2008 | D & L ENERGY INC | 6253.00 | 0.00 | 366 |
| 2009 | D & L ENERGY INC | 5654.00 | 0.00 | 365 |
| 2010 | D & L ENERGY INC | 5443.00 | 0.00 | 365 |
| 2011 | D & L ENERGY INC | 3140.00 | 64.00 | 0 |
| 2012 | D & L ENERGY INC | 4646.00 | 0.00 | 365 |
| 2013 | D & L ENERGY INC | 3943.00 | 0.00 | 365 |
| 2014 | D & L ENERGY INC | 3562.00 | 0.00 | 307 |
| 2015 | BOBCAT WELL & PIPELINE LLC | 961.00 | 0.00 | 269 |
| 2016 | BOBCAT WELL & PIPELINE LLC | 4742.00 | 17.00 | 328 |
| 2017 | BOBCAT WELL & PIPELINE LLC | 4283.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1998 | D & L ENERGY INC | Brine | 203 | 365 |
| 1999 | D & L ENERGY INC | Brine | 0 | 365 |
| 2000 | D & L ENERGY INC | Brine | 25 | 365 |
| 2001 | D & L ENERGY INC | Brine | 11 | 365 |
| 2002 | D & L ENERGY INC | Brine | 9 | 365 |
| 2003 | D & L ENERGY INC | Brine | 0 | 365 |
| 2004 | D & L ENERGY INC | Brine | 13 | 365 |
| 2005 | D & L ENERGY INC | Brine | 4 | 365 |
| 2006 | D & L ENERGY INC | Brine | 0 | 365 |
| 2007 | D & L ENERGY INC | Brine | 0 | 365 |
| 2008 | D & L ENERGY INC | Brine | 0 | 366 |
| 2009 | D & L ENERGY INC | Brine | 6 | 365 |
| 2010 | D & L ENERGY INC | Brine | 11 | 365 |
| 2011 | D & L ENERGY INC | Brine | 2 | |
| 2012 | D & L ENERGY INC | Brine | 0 | 365 |
| 2013 | D & L ENERGY INC | Brine | 0 | 365 |
| 2014 | D & L ENERGY INC | Brine | 0 | 307 |
| 2015 | BOBCAT WELL & PIPELINE LLC | Brine | 35 | 269 |
| 2016 | BOBCAT WELL & PIPELINE LLC | Brine | 0 | 328 |
| 2017 | BOBCAT WELL & PIPELINE LLC | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -195967950 | 2012-2-9 0:00:0 | PW | No Violations | 0.50 |
| 0080477506 | 1998-06-29 | Preliminary Restoration | No Violations | Meets requirements. |
| 0195967950 | 2012-02-09 | Production Wells | No Violations | On 02/06/2012, DNR Inspector Richard Skidmore completed a production well inspection status check for DNR Inspector Chris Grimm. The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05. Inspection passed. |
| 1708100557 | 2009-02-05 | Production Wells | No Violations | I performed a random field inspection. I GPSd both the wellhead and the tank battery for the first time. The last inspection was performed on 6/98 with no GPS taken. I continued to walk around the tank battery and the wellhead and found both to be in good shape. The ID signs were posted. There were no violations at this time. |
| 80477506 | 1998-6-29 0:00: | PL | No Violations |
For data sources see[9]