If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-099-22651 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.07,"lon":-80.89,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Mahoning | |
| Municipality: Jackson Township | |
| Operator Name: DIVERSIFIED PRODUCTION LLC | |
| Well Pad ID: | |
| Farm/Lease Name: HOLONKO | |
| License Status: Producing | |
| License Date: 1995-02-03 | |
| Spud Date: 1995-02-23 | |
| Spud Drilling Contractor: MOHAWK DRLG | |
| Final Drill Date: 1995-02-28 | |
| Well Total Depth: 5208.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.070000 | |
| Longitude: -80.890000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1995-02-03 | 2651 D & L ENERGY INC GeoDate 2/3/95 |
| Oil and Gas | 1995-02-03 | Issued Date 2/3/95 Expired Date 2/3/96 Acres 0041900 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05208 Proposed Drill Depth 05208 |
| Original Spud | 1995-02-23 | |
| Completed | 1995-02-28 | |
| Reached Total Depth | 1995-02-28 | |
| Completion Report Received | 1995-03-27 | |
| Construction Permit Expires | 1996-02-03 | |
| Change of Owner | 2015-01-27 | Operator changed from 2651, D & L ENERGY INC to 9426, BOBCATE WELL AND PIPELINE LLC |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 4935 | 5072 | 0 |
| 4935 | 5072 | 0 | |
| 2006-09-11 | 4962 | 5020 | 45 |
| 4962 | 5020 | 45 | |
| 4935 | 5072 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 92000 Gal | 80000 | |||
| ACID | 15 | 500 Gal | 0 | FRAC W/92M GAL H20 & 800 SX SAND |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1993 | GM/DELPHI PACKARD ELEC. | 3625.00 | 0.00 | 365 |
| 1995 | D & L ENERGY INC | 11642.00 | 224.00 | 291 |
| 1996 | D & L ENERGY INC | 18504.00 | 228.00 | 365 |
| 1997 | D & L ENERGY INC | 12001.00 | 77.00 | 365 |
| 1998 | D & L ENERGY INC | 10542.00 | 52.00 | 365 |
| 1999 | D & L ENERGY INC | 6857.00 | 107.00 | 365 |
| 2000 | D & L ENERGY INC | 7559.00 | 61.00 | 365 |
| 2001 | D & L ENERGY INC | 6410.00 | 0.00 | 365 |
| 2002 | D & L ENERGY INC | 7927.00 | 103.00 | 365 |
| 2003 | D & L ENERGY INC | 8893.00 | 60.00 | 365 |
| 2004 | D & L ENERGY INC | 6289.00 | 0.00 | 365 |
| 2005 | D & L ENERGY INC | 4700.00 | 56.00 | 365 |
| 2006 | D & L ENERGY INC | 3161.00 | 0.00 | 365 |
| 2007 | D & L ENERGY INC | 2245.00 | 65.00 | 212 |
| 2008 | D & L ENERGY INC | 0.00 | 0.00 | 365 |
| 2009 | D & L ENERGY INC | 156.00 | 0.00 | 365 |
| 2010 | D & L ENERGY INC | 2560.00 | 0.00 | 365 |
| 2011 | D & L ENERGY INC | 2079.00 | 0.00 | 0 |
| 2012 | D & L ENERGY INC | 1526.00 | 0.00 | 365 |
| 2013 | D & L ENERGY INC | 388.00 | 0.00 | 83 |
| 2014 | D & L ENERGY INC | 0.00 | 0.00 | 0 |
| 2015 | BOBCAT WELL & PIPELINE LLC | 0.00 | 0.00 | 0 |
| 2016 | BOBCAT WELL & PIPELINE LLC | 0.00 | 41.00 | 0 |
| 2017 | BOBCAT WELL & PIPELINE LLC | 0.00 | 0.00 | 0 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1993 | GM/DELPHI PACKARD ELEC. | Brine | 0 | 365 |
| 1995 | D & L ENERGY INC | Brine | 266 | 291 |
| 1996 | D & L ENERGY INC | Brine | 117 | 365 |
| 1997 | D & L ENERGY INC | Brine | 59 | 365 |
| 1998 | D & L ENERGY INC | Brine | 7 | 365 |
| 1999 | D & L ENERGY INC | Brine | 22 | 365 |
| 2000 | D & L ENERGY INC | Brine | 35 | 365 |
| 2001 | D & L ENERGY INC | Brine | 0 | 365 |
| 2002 | D & L ENERGY INC | Brine | 0 | 365 |
| 2003 | D & L ENERGY INC | Brine | 70 | 365 |
| 2004 | D & L ENERGY INC | Brine | 53 | 365 |
| 2005 | D & L ENERGY INC | Brine | 37 | 365 |
| 2006 | D & L ENERGY INC | Brine | 32 | 365 |
| 2007 | D & L ENERGY INC | Brine | 32 | 212 |
| 2008 | D & L ENERGY INC | Brine | 0 | 365 |
| 2009 | D & L ENERGY INC | Brine | 0 | 365 |
| 2010 | D & L ENERGY INC | Brine | 0 | 365 |
| 2011 | D & L ENERGY INC | Brine | 80 | |
| 2012 | D & L ENERGY INC | Brine | 20 | 365 |
| 2013 | D & L ENERGY INC | Brine | 0 | 83 |
| 2014 | D & L ENERGY INC | Brine | 20 | 0 |
| 2015 | BOBCAT WELL & PIPELINE LLC | Brine | 0 | |
| 2016 | BOBCAT WELL & PIPELINE LLC | Brine | 0 | 0 |
| 2017 | BOBCAT WELL & PIPELINE LLC | Brine | 0 | 0 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1384690928 | 2007-6-14 0:00: | PW | No Violations | |
| 1384690928 | 2007-06-14 | Production Wells | No Violations | I performed a random field inspection. GPSs tank battery and wellhead. I found no violations at this time. |
| iANGE00090 | 1997-12-26 | Preliminary Restoration | No Violations | |
| iANGE000908 | 1997-12-26 0:00 | PL | No Violations | |
| iANGE00152 | 1998-01-15 | Preliminary Restoration | No Violations | |
| iANGE001529 | 1998-1-15 0:00: | PL | No Violations |
For data sources see[9]