If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-099-22257 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01,"lon":-80.74,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Mahoning | |
| Municipality: Canfield Township | |
| Operator Name: EVERFLOW EASTERN PARTNERS LP | |
| Well Pad ID: | |
| Farm/Lease Name: KANE-HALL UNIT | |
| License Status: Producing | |
| License Date: 1988-09-21 | |
| Spud Date: 1988-12-03 | |
| Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
| Final Drill Date: 1988-12-08 | |
| Well Total Depth: 5600.00 ft | |
| Configuration: Vertical | |
| Latitude: 41.010000 | |
| Longitude: -80.740000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| Oil and Gas | 1988-09-21 | Issued Date 9/21/88 Expired Date 9/21/89 Acres 0043307 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05600 Proposed Drill Depth 05600 |
| Original Spud | 1988-12-02 | |
| Completed | 1988-12-08 | |
| Reached Total Depth | 1988-12-08 | |
| CO | 1988-12-23 | 84 EVERFLOW EASTERN PTNS L P GeoDate 9/21/88 |
| Completion Report Received | 1988-12-27 | |
| Construction Permit Expires | 1989-09-21 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 5323 | 5458 | 0 |
| 5323 | 5458 | 0 | |
| 2006-09-11 | 5346 | 5456 | 38 |
| 5346 | 5456 | 38 | |
| 5323 | 5458 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 118000 Gal | 70000 | FRAC:WATER/SAND |
For data sources see[4]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| 000PL12560 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
| 0379108365 | 2009-03-25 | Production Wells | Violations Noted | I performed a random field inspection. Both the tank battery and the wellhead were GPS.d I continued to walk around the tank battery and found that there was oil and some brine inside the dike. The plastic brine tank was cracked. I called George Strawn(330-727-1614) and told him about the mess. He would take a look and take action on this. This case continues. |
| 1049486086 | 2003-04-04 | Production Wells | No Violations | The tank battery consists of 1-100 bbl storage tank, 1-50 bbl plastic salt water tank and 1- horizontal separator. Diked. |
| 1239819270 | 2009-04-14 | Production Wells | No Violations | I performed a NOV follow-up on the tank battery area. The plastic brine tank has been hauled off and the oil on the ground inside the dike area cleaned up. This NOV is resolved. |
| 379108365 | 2009-3-25 0:00: | PW | No Violations | |
| PL12560 | PL | No Violations |
| Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
|---|---|---|---|---|
| 0379108365 | US-OH-124004 | 2009-03-27 | Failure to keep dike or pit free of brine or other wastes |
For data sources see[9]