If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-093-21517 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.33,"lon":-82.03,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Lorain | |
Municipality: Eaton Township | |
Operator Name: HOLY LOVE MINISTRIES | |
Well Pad ID: | |
Farm/Lease Name: HOLY LOVE MINISTRIES -REYNOLDS | |
License Status: Producing | |
License Date: 2014-08-05 | |
Spud Date: 2003-07-05 | |
Spud Drilling Contractor: ROSS WELL SERVICE | |
Final Drill Date: 2003-10-21 | |
Well Total Depth: 999.00 ft | |
Configuration: Vertical | |
Latitude: 41.330000 | |
Longitude: -82.030000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2003-06-12 | 7455 HOLY LOVE MINISTRIES Proposed Formation OHIO SHALE Issued Date 6/12/2003 Expired Date 6/11/2004 6:00:00 AM |
Inspector Comments Cement Job | 2003-07-05 | Penners Well Drilling is contractor from Pennsylvainia.Cable Tool rig. Well to be used for church only.Cement Ticket Notes Inspector Reporting MORAVY HAROLD |
Original Spud | 2003-07-05 | CONTRACTOR: PENNERS WELL DRILLING ACIDIZED 11/24/14 |
Completed | 2003-10-21 | CONTRACTOR: PENNERS WELL DRILLING ACIDIZED 11/24/14 |
Reached Total Depth | 2003-10-21 | CONTRACTOR: PENNERS WELL DRILLING ACIDIZED 11/24/14 |
Completion Report Received | 2003-12-04 | CONTRACTOR: PENNERS WELL DRILLING ACIDIZED 11/24/14 |
APP | 2014-08-05 | Proposed Formations:OHIO SHALE, Issued Date:8/5/2014, Expired Date:8/4/2016 12:00:00 PM, Drilling unit acres:1, Proposed Well Type:OG, Proposed Well Class: |
Construction Permit Expires | 2016-08-04 | CONTRACTOR: PENNERS WELL DRILLING ACIDIZED 11/24/14 |
Record Last Modified | 2017-02-15 | CONTRACTOR: PENNERS WELL DRILLING ACIDIZED 11/24/14 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-02-27 | 764 | 948 | 17 |
764 | 948 | 17 | |
764 | 948 | 17 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-11-24 | ACID | 0 | 0 | 0 | Nabors Completion Services | |
2014-11-24 | N2 | 0 | 490 Mscf | 0 | OTHER | Arrived on location on 11/24/2014 to complete the Reynolds #1 well. Nabors representative Doug Hansen was on location and advised that the job had been pushed back an hour. Waited onsite for Nabors Nitrogen frac crew to arrive and get rigged up. Spotted 350 gal of 15% HCl acid ahead of the frac. Finished rigging up frac crew. Pressure tested lines. Pumped 490 McF of nitrogen to frac well. Formation broke down at approximately 1500#. Rigged down, moved out Nabors. Shut-down for the day. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2004 | HOLY LOVE MINISTRIES | 0.00 | 0.00 | 0 |
2005 | HOLY LOVE MINISTRIES | 0.00 | 0.00 | 0 |
2006 | HOLY LOVE MINISTRIES | 0.00 | 0.00 | 0 |
2007 | HOLY LOVE MINISTRIES | 0.00 | 0.00 | 0 |
2008 | HOLY LOVE MINISTRIES | 0.00 | 0.00 | 0 |
2009 | HOLY LOVE MINISTRIES | 0.00 | 0.00 | 0 |
2014 | HOLY LOVE MINISTRIES | 0.00 | 0.00 | 0 |
2015 | HOLY LOVE MINISTRIES | 0.00 | 0.00 | 0 |
2016 | HOLY LOVE MINISTRIES | 0.00 | 0.00 | 0 |
2017 | HOLY LOVE MINISTRIES | 0.00 | 0.00 | 0 |
2018 | HOLY LOVE MINISTRIES | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2004 | HOLY LOVE MINISTRIES | Brine | 0 | 0 |
2005 | HOLY LOVE MINISTRIES | Brine | 0 | 0 |
2006 | HOLY LOVE MINISTRIES | Brine | 0 | 0 |
2007 | HOLY LOVE MINISTRIES | Brine | 0 | 0 |
2008 | HOLY LOVE MINISTRIES | Brine | 0 | 0 |
2009 | HOLY LOVE MINISTRIES | Brine | 0 | 0 |
2014 | HOLY LOVE MINISTRIES | Brine | 0 | 0 |
2015 | HOLY LOVE MINISTRIES | Brine | 0 | 0 |
2016 | HOLY LOVE MINISTRIES | Brine | 0 | 0 |
2017 | HOLY LOVE MINISTRIES | Brine | 0 | 0 |
2018 | HOLY LOVE MINISTRIES | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1035856742 | 2014-11-24 0:00 | PW | No Violations | |
-427650893 | 2014-8-18 0:00: | PW | No Violations | |
-662613479 | 2014-8-19 0:00: | PW | No Violations | |
0427650893 | 2014-08-18 | Production Wells | No Violations | Arrived on location on 08/18/2014 to plug the well. Moore Well Service rigged up and ran in with tubing to tag bottom. The hole was dry. After finding out that the hole was dry, Jam Khorrami, who is overseeing the project on behalf of Holy Love Ministries, made the decision to log the well and possibly produce it. Logging is scheduled for 9:30 AM 08/19/2014. |
0662613479 | 2014-08-19 | Production Wells | No Violations | Arrived on location on 08/19/2014 to witness the logging job for the well. The logging job was rescheduled earlier in the morning without my knowledge. Mr. Khorrami will be reviewing the logs and making a decision as to produce or plug the well. |
0681573139 | 2014-11-25 | Production Wells | No Violations | Visited location on 11/25/2014 to check on well after yesterdays frac job. The well had 170# of pressure on it (nitrogen). Well was choked back, but blowing all night. Spoke with Eaton Township Fire Department at the request of KPI (contractor overseeing well work-over for the church) to advise them of operations at the well. No problems were noted at the time of the inspection. |
1035856742 | 2014-11-24 | Production Wells | No Violations | Visited location on 11/24/2014 to witness stimulation operations (nitrogen frac) on the Reynolds #1 well. Arrived onsite and was advised that the job had been pushed back an hour by Nabors representative Doug Hansen. Waited onsite for Nabors frac crew to arrive and get rigged up. Spotted acid ahead of the frac. Pressure tested lines and began pumping nitrogen. Completed frac job. Rigged down, moved out Nabors. No problems were encountered during stimulation operations. See stimulation report for additional information. |
1067965069 | 2003-11-04 | Completion Testing | No Violations | Spud date was 7-5-2003. Drilling pits remain open and well is completed. Advised church Decon to have pits closed by December 5, 2003. |
1087564090 | 2004-06-18 | Preliminary Restoration | No Violations | Dometic gas well for church. |
681573139 | 2014-11-25 0:00 | PW | No Violations |
For data sources see[9]