34-093-21517

Well Details

Well ID: 34-093-21517
Loading map...
Country: United States
State: Ohio
County: Lorain
Municipality: Eaton Township
Operator Name: HOLY LOVE MINISTRIES
Well Pad ID:
Farm/Lease Name: HOLY LOVE MINISTRIES -REYNOLDS
License Status: Producing
License Date: 2014-08-05
Spud Date: 2003-07-05
Spud Drilling Contractor: ROSS WELL SERVICE
Final Drill Date: 2003-10-21
Well Total Depth: 999.00 ft
Configuration: Vertical
Latitude: 41.330000
Longitude: -82.030000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2003-06-12 7455 HOLY LOVE MINISTRIES Proposed Formation OHIO SHALE Issued Date 6/12/2003 Expired Date 6/11/2004 6:00:00 AM
Inspector Comments Cement Job 2003-07-05 Penners Well Drilling is contractor from Pennsylvainia.Cable Tool rig. Well to be used for church only.Cement Ticket Notes Inspector Reporting MORAVY HAROLD
Original Spud 2003-07-05 CONTRACTOR: PENNERS WELL DRILLING ACIDIZED 11/24/14
Completed 2003-10-21 CONTRACTOR: PENNERS WELL DRILLING ACIDIZED 11/24/14
Reached Total Depth 2003-10-21 CONTRACTOR: PENNERS WELL DRILLING ACIDIZED 11/24/14
Completion Report Received 2003-12-04 CONTRACTOR: PENNERS WELL DRILLING ACIDIZED 11/24/14
APP 2014-08-05 Proposed Formations:OHIO SHALE, Issued Date:8/5/2014, Expired Date:8/4/2016 12:00:00 PM, Drilling unit acres:1, Proposed Well Type:OG, Proposed Well Class:
Construction Permit Expires 2016-08-04 CONTRACTOR: PENNERS WELL DRILLING ACIDIZED 11/24/14
Record Last Modified 2017-02-15 CONTRACTOR: PENNERS WELL DRILLING ACIDIZED 11/24/14

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-02-27 764 948 17
764 948 17
764 948 17

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-11-24 ACID 0 0 0 Nabors Completion Services
2014-11-24 N2 0 490 Mscf 0 OTHER Arrived on location on 11/24/2014 to complete the Reynolds #1 well. Nabors representative Doug Hansen was on location and advised that the job had been pushed back an hour. Waited onsite for Nabors Nitrogen frac crew to arrive and get rigged up. Spotted 350 gal of 15% HCl acid ahead of the frac. Finished rigging up frac crew. Pressure tested lines. Pumped 490 McF of nitrogen to frac well. Formation broke down at approximately 1500#. Rigged down, moved out Nabors. Shut-down for the day.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2004 HOLY LOVE MINISTRIES 0.00 0.00 0
2005 HOLY LOVE MINISTRIES 0.00 0.00 0
2006 HOLY LOVE MINISTRIES 0.00 0.00 0
2007 HOLY LOVE MINISTRIES 0.00 0.00 0
2008 HOLY LOVE MINISTRIES 0.00 0.00 0
2009 HOLY LOVE MINISTRIES 0.00 0.00 0
2014 HOLY LOVE MINISTRIES 0.00 0.00 0
2015 HOLY LOVE MINISTRIES 0.00 0.00 0
2016 HOLY LOVE MINISTRIES 0.00 0.00 0
2017 HOLY LOVE MINISTRIES 0.00 0.00 0
2018 HOLY LOVE MINISTRIES 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2004 HOLY LOVE MINISTRIES Brine 0 0
2005 HOLY LOVE MINISTRIES Brine 0 0
2006 HOLY LOVE MINISTRIES Brine 0 0
2007 HOLY LOVE MINISTRIES Brine 0 0
2008 HOLY LOVE MINISTRIES Brine 0 0
2009 HOLY LOVE MINISTRIES Brine 0 0
2014 HOLY LOVE MINISTRIES Brine 0 0
2015 HOLY LOVE MINISTRIES Brine 0 0
2016 HOLY LOVE MINISTRIES Brine 0 0
2017 HOLY LOVE MINISTRIES Brine 0 0
2018 HOLY LOVE MINISTRIES Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1035856742 2014-11-24 0:00 PW No Violations
-427650893 2014-8-18 0:00: PW No Violations
-662613479 2014-8-19 0:00: PW No Violations
0427650893 2014-08-18 Production Wells No Violations Arrived on location on 08/18/2014 to plug the well. Moore Well Service rigged up and ran in with tubing to tag bottom. The hole was dry. After finding out that the hole was dry, Jam Khorrami, who is overseeing the project on behalf of Holy Love Ministries, made the decision to log the well and possibly produce it. Logging is scheduled for 9:30 AM 08/19/2014.
0662613479 2014-08-19 Production Wells No Violations Arrived on location on 08/19/2014 to witness the logging job for the well. The logging job was rescheduled earlier in the morning without my knowledge. Mr. Khorrami will be reviewing the logs and making a decision as to produce or plug the well.
0681573139 2014-11-25 Production Wells No Violations Visited location on 11/25/2014 to check on well after yesterdays frac job. The well had 170# of pressure on it (nitrogen). Well was choked back, but blowing all night. Spoke with Eaton Township Fire Department at the request of KPI (contractor overseeing well work-over for the church) to advise them of operations at the well. No problems were noted at the time of the inspection.
1035856742 2014-11-24 Production Wells No Violations Visited location on 11/24/2014 to witness stimulation operations (nitrogen frac) on the Reynolds #1 well. Arrived onsite and was advised that the job had been pushed back an hour by Nabors representative Doug Hansen. Waited onsite for Nabors frac crew to arrive and get rigged up. Spotted acid ahead of the frac. Pressure tested lines and began pumping nitrogen. Completed frac job. Rigged down, moved out Nabors. No problems were encountered during stimulation operations. See stimulation report for additional information.
1067965069 2003-11-04 Completion Testing No Violations Spud date was 7-5-2003. Drilling pits remain open and well is completed. Advised church Decon to have pits closed by December 5, 2003.
1087564090 2004-06-18 Preliminary Restoration No Violations Dometic gas well for church.
681573139 2014-11-25 0:00 PW No Violations

For data sources see[9]

References