Well Details

Well ID: 34-089-26106
Loading map...
Country: United States
State: Ohio
County: Licking
Municipality: McKean Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: HEIMERL LTD PARTNERS
License Status: Producing
License Date: 2012-06-20
Spud Date: 2012-07-03
Spud Drilling Contractor: LBJ DRILLING
Final Drill Date: 2012-08-08
Well Total Depth: 2343.00 ft
Configuration: Vertical
Latitude: 40.180000
Longitude: -82.550000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-06-20 Proposed Formations:CLINTON, Issued Date:6/20/2012, Expired Date:6/20/2014 12:00:00 PM, Drilling unit acres:97.46, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2012-08-08
Completion Report Received 2012-10-02
Change of Owner 2014-02-06 Operator changed from 79, OXFORD OIL to 9216, ECLIPSE RESOURCES-OHIO LLC
Construction Permit Expires 2014-06-20
Change of Owner 2016-08-02 Operator changed from 9216, ECLIPSE RESOURCES-OHIO LLC to 8685, M & R INVESTMENTS OHIO LLC
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-10-18 2254 2260 7
2012-10-18 2263 2276 14
2254 2260 7
2263 2276 14
2254 2260 7

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-08-09 H2O 15 1424 Bbl 300 Producers Service Corporation Materials Used: 300 gallon acid, 30 gallon NE1 (surfactant); and 300# Fluid Loss. The highest pressure encountered during sand was 1480 psi. The pressure before end of flush was 1469 psi. Fluid Breakdown by barrels: Load hole= 41 bbl; Run Pad= 149 bbl; 20/40 Sand= 1048 bbl; Flush= 186 bbl. Total fluids = 1424 bbl or 59808 gallons. Highest Pressure with sand was 1440 psi. The used 9.5# 4.5" casing was ran to 2334' with a total depth of 2343'.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 OXFORD OIL 266.00 0.00 0
2013 ECLIPSE RESOURCES-OHIO LLC 1475.00 0.00 365
2014 ECLIPSE RESOURCES-OHIO LLC 1160.00 0.00 365
2015 ECLIPSE RESOURCES-OHIO LLC 4934.00 1.00 365
2016 M & R INVESTMENTS OHIO LLC 0.00 0.00 365
2017 M & R INVESTMENTS OHIO LLC 983.00 0.00 365
2018 M & R INVESTMENTS OHIO LLC 763.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 OXFORD OIL Brine 100
2013 ECLIPSE RESOURCES-OHIO LLC Brine 0 365
2014 ECLIPSE RESOURCES-OHIO LLC Brine 0 365
2015 ECLIPSE RESOURCES-OHIO LLC Brine 0 365
2016 M & R INVESTMENTS OHIO LLC Brine 0 365
2017 M & R INVESTMENTS OHIO LLC Brine 0 365
2018 M & R INVESTMENTS OHIO LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1254305702 2012-7-17 0:00: DD No Violations
-1881396320 2020-4-14 0:00: PW No Violations 0.50
-2086734229 2013-10-23 0:00 PL No Violations
-710450618 2012-8-6 0:00:0 DD No Violations
-740936859 2012-8-9 0:00:0 CT No Violations
0582519302 2012-07-19 Drill / Deepen / Reopen No Violations I witnessed the cementing of the surface casing today. Cement returns were observed, but did not stay at the surface. The surface casing annulus will be topped off prior to cementing the 4.5 casing.
0710450618 2012-08-06 Drill / Deepen / Reopen No Violations I witnessed the cementing of the 4.5 casing (longstring ) today. Circulation was established prior to setting the cement plug. During this inspection, the drilling pit was found to have been modified since the last inspection and also contained fluid near maximum capacity. A section of this pit was enlarged with an additional liner overlapped over a section of the initial liner. The soils on the outside bottom to mid-section of dike walls located at the modified section were wet stained. Mr. Jack Greene with the Oxford Oil Company was instructed, in the field, to resolve this deficiency immediately. Mr. Jeff Morans water truck (LBJ Drilling) arrived at location and began removing fluid at the end of cement job.
0740936859 2012-08-09 Completion Testing No Violations I arrived at the well location during the treatment stage and witnessed the remainder of frac job. No violations were noted during this job. Please refer to my Stimulation Report for additional details. The drilling pit deficiency as previously noted has now been resolved.
1254305702 2012-07-17 Drill / Deepen / Reopen No Violations An inspection of drilling operations revealed drilling 10 hole surface hole. No violations were noted.
2086734229 2013-10-23 Preliminary Restoration No Violations This inspection was conducted as a preliminary restoration status check. The well was equipped with a pumping unit and motor. It was not pumping during inspection. The well is located in a crop field. The area around the well has been restored. The tank battery consists of (1) 100 barrel tank, separator, and drip inside an earthen dike. Restoration meets ORC 1509.072.
582519302 2012-7-19 0:00: DD No Violations

For data sources see[9]