34-089-25949

Well Details

Well ID: 34-089-25949
Loading map...
Country: United States
State: Ohio
County: Licking
Municipality: Burlington Township
Operator Name: KNOX ENERGY INC.
Well Pad ID:
Farm/Lease Name: BAILEY J
License Status: Producing
License Date: 2008-07-25
Spud Date: 2008-08-04
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2008-08-07
Well Total Depth: 2304.00 ft
Configuration: Vertical
Latitude: 40.230000
Longitude: -82.520000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-07-25 Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:7/25/2008, Expired Date:7/25/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-08-07
Completion Report Received 2008-12-08
Construction Permit Expires 2009-07-25
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-01-30 2154 2176 42
2154 2176 42
2154 2176 42

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 56055 Gal 20000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 KNOX ENERGY INC. 297.00 0.00 365
2009 KNOX ENERGY INC. 11666.00 0.00 365
2010 KNOX ENERGY INC. 8820.00 0.00 365
2011 KNOX ENERGY INC. 5870.00 0.00 365
2012 KNOX ENERGY INC. 3584.00 0.00 366
2013 KNOX ENERGY INC. 2932.00 0.00 365
2014 KNOX ENERGY INC. 2220.00 0.00 365
2015 KNOX ENERGY INC. 1940.00 0.00 365
2016 KNOX ENERGY INC. 1765.00 0.00 365
2017 KNOX ENERGY INC. 2960.00 0.00 365
2018 KNOX ENERGY INC. 2911.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 KNOX ENERGY INC. Brine 0 365
2009 KNOX ENERGY INC. Brine 60 365
2010 KNOX ENERGY INC. Brine 59 365
2011 KNOX ENERGY INC. Brine 0 365
2012 KNOX ENERGY INC. Brine 0 366
2013 KNOX ENERGY INC. Brine 0 365
2014 KNOX ENERGY INC. Brine 0 365
2015 KNOX ENERGY INC. Brine 0 365
2016 KNOX ENERGY INC. Brine 0 365
2017 KNOX ENERGY INC. Brine 0 365
2018 KNOX ENERGY INC. Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1811476225 2012-1-24 0:00: PL No Violations
-1975127471 2008-8-7 0:00:0 DD No Violations
-2085421680 2008-8-6 0:00:0 DD No Violations
-929830638 2008-8-5 0:00:0 DD No Violations
0929830638 2008-08-05 Drill / Deepen / Reopen No Violations I witnessed the surface job.
1328053736 2012-01-18 Preliminary Restoration No Violations During my inspection I completed a preliminary status check and found that the well was equipped with a pumping unit. The well was not pumping during my inspection but the valves were all open. The pits have been closed and the area around the well has been graded. The well produces into a shared tank battery but has no ID posted at the well. The tank battery consist of one 100 barrel tank, two gas seperators, and two gas meters inside of a dike. This is a shared tank battery for two wells. The permit numbers are 5949 and 6029. There is a ID posted at the tank battery. The lease road is in good condition. Preliminary restoration passed.
1811476225 2012-01-24 Preliminary Restoration No Violations An inspection of tank battery location was conducted with Jeff Fry and Brandon Mitchell. Please refer to Brandon Mitchells report for details regarding the Preliminary Restoration.
1975127471 2008-08-07 Drill / Deepen / Reopen No Violations They are cementing the production casing today.
2085421680 2008-08-06 Drill / Deepen / Reopen No Violations I witnessed drilling operations today. The surface casing has been cemented and they plan on reaching TD this evening. Cementers will cement the longstring in the morning.

For data sources see[9]