If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-25925 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.98,"lon":-82.3,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: Franklin Township | |
Operator Name: DIVERSIFIED PRODUCTION LLC | |
Well Pad ID: | |
Farm/Lease Name: ESTEP UNIT | |
License Status: Producing | |
License Date: 2008-05-29 | |
Spud Date: 2008-09-29 | |
Spud Drilling Contractor: BOWMAN DRILLING | |
Final Drill Date: 2008-10-03 | |
Well Total Depth: 3115.00 ft | |
Configuration: Vertical | |
Latitude: 39.980000 | |
Longitude: -82.300000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-05-29 | Proposed Formations:BEREA THRU CLINTON, Issued Date:5/29/2008, Expired Date:5/29/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-10-03 | |
Completion Report Received | 2008-11-12 | |
Construction Permit Expires | 2009-05-29 | |
Last Compliance Report | 2010-05-04 | |
Revocation | 2015-05-29 | |
Change of Owner | 2018-03-07 | Operator changed from 98, NGO DEVELOPMENT CORP. to 8685, M & R INVESTMENTS OHIO LLC |
Record Last Modified | 2018-03-08 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-12-30 | 2944 | 2964 | 42 |
2944 | 2964 | 42 | |
2944 | 2964 | 42 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 90598 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | NGO DEVELOPMENT CORP. | 1366.00 | 354.00 | 240 |
2010 | NGO DEVELOPMENT CORP. | 2187.00 | 389.00 | 365 |
2011 | NGO DEVELOPMENT CORP. | 1607.00 | 222.00 | 365 |
2012 | NGO DEVELOPMENT CORP. | 950.00 | 129.00 | 366 |
2013 | NGO DEVELOPMENT CORP. | 224.00 | 70.00 | 365 |
2014 | NGO DEVELOPMENT CORP. | 864.00 | 122.00 | 365 |
2015 | NGO DEVELOPMENT CORP. | 2332.00 | 111.00 | 365 |
2016 | NGO DEVELOPMENT CORP. | 3818.00 | 49.00 | 365 |
2017 | NGO DEVELOPMENT CORP. | 1830.00 | 0.00 | 365 |
2018 | M & R INVESTMENTS OHIO LLC | 2470.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | NGO DEVELOPMENT CORP. | Brine | 1833 | 240 |
2010 | NGO DEVELOPMENT CORP. | Brine | 1910 | 365 |
2011 | NGO DEVELOPMENT CORP. | Brine | 0 | 365 |
2012 | NGO DEVELOPMENT CORP. | Brine | 0 | 366 |
2013 | NGO DEVELOPMENT CORP. | Brine | 0 | 365 |
2014 | NGO DEVELOPMENT CORP. | Brine | 510 | 365 |
2015 | NGO DEVELOPMENT CORP. | Brine | 1020 | 365 |
2016 | NGO DEVELOPMENT CORP. | Brine | 675 | 365 |
2017 | NGO DEVELOPMENT CORP. | Brine | 165 | 365 |
2018 | NGO DEVELOPMENT CORP. | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1725791866 | 2015-6-9 0:00:0 | AD | No Violations | |
-2131574792 | 2010-4-9 0:00:0 | PL | No Violations | |
-383480167 | 2010-4-9 0:00:0 | AD | No Violations | |
0383480167 | 2010-04-09 | Annular Disposal | No Violations | I met with Joe Jones this morning at this well location to complete the Mechanical Integrity Test for this well. There was not enough pressure on the well to meet the minimum test pressure of 306psi. Later in the afternoon, Joe was able to obtain the minimum test pressure after getting more nitrogen. The test began at 3:05pm with a pressure of 318psi and ended at 4:05pm with a pressure of 316psi. The test passed. |
1725791866 | 2015-06-09 | Annular Disposal | No Violations | Inspect well accompanied by NGO Production Superintendent Dean Limbacher as a staus a status check. The well was equipped with a pumping unit and motor. The annular disposal line was disconnected and is no longer in use on this well. A 2 plug has been installed on the 8 casing. The tank battery consists of (2) 100 barrel tanks, separator, drip, and chart inside an earthen dike. Identification was posted at the tank battery. No violations noted. Time of inspection: 12:20 PM. Weather: 70*F, Sunny |
2131574792 | 2010-04-09 | Preliminary Restoration | No Violations | The inspection revealed that there is an active pumping unit on the well and the well is producing. The location has been properly graded and seeded to prevent erosion. The lease road has been maintained with limestone. There are two 200 barrel tanks and a separator contained within an earthen dike. There is proper display of identification posted at the tank battery. Preliminary Restoration passed. |
For data sources see[9]