X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-089-25916

Well Details

Well ID: 34-089-25916
Loading map...
Country: United States
State: Ohio
County: Licking
Municipality: Franklin Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: KELLY
License Status: Producing
License Date: 2008-04-30
Spud Date: 2008-05-30
Spud Drilling Contractor: FMS DRILLING
Final Drill Date: 2008-06-10
Well Total Depth: 3056.00 ft
Configuration: Vertical
Latitude: 39.980000
Longitude: -82.310000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-04-30 Proposed Formations:BEREA THRU CLINTON, Issued Date:4/30/2008, Expired Date:4/30/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-06-10 AD WAS REVOKED ON 5/29/2015
Completion Report Received 2008-09-23 AD WAS REVOKED ON 5/29/2015
Construction Permit Expires 2009-04-30 AD WAS REVOKED ON 5/29/2015
Last Compliance Report 2010-05-04 AD WAS REVOKED ON 5/29/2015
Revocation 2015-05-29 AD WAS REVOKED ON 5/29/2015
Change of Owner 2018-03-07 Operator changed from 98, NGO DEVELOPMENT CORP. to 8685, M & R INVESTMENTS OHIO LLC
Record Last Modified 2018-03-08 AD WAS REVOKED ON 5/29/2015

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-11-17 2840 2858 0
2840 2858 0
2840 2858 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 94000 Gal 40000 PERF INTERVAL BASED ON GEOLOGIST LOG INTERPRETATION; PERF INTERVAL REPORTED ON WCR WAS INCORRECT… GM

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 NGO DEVELOPMENT CORP. 0.00 0.00 0
2009 NGO DEVELOPMENT CORP. 3120.00 0.00 365
2010 NGO DEVELOPMENT CORP. 3901.00 321.00 365
2011 NGO DEVELOPMENT CORP. 1160.00 109.00 365
2012 NGO DEVELOPMENT CORP. 1378.00 33.00 366
2013 NGO DEVELOPMENT CORP. 785.00 0.00 365
2014 NGO DEVELOPMENT CORP. 339.00 0.00 365
2015 NGO DEVELOPMENT CORP. 259.00 39.00 365
2016 NGO DEVELOPMENT CORP. 214.00 0.00 365
2017 NGO DEVELOPMENT CORP. 146.00 53.00 365
2018 M & R INVESTMENTS OHIO LLC 78.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 NGO DEVELOPMENT CORP. Brine 145 0
2009 NGO DEVELOPMENT CORP. Brine 2063 365
2010 NGO DEVELOPMENT CORP. Brine 2635 365
2011 NGO DEVELOPMENT CORP. Brine 1161 365
2012 NGO DEVELOPMENT CORP. Brine 572 366
2013 NGO DEVELOPMENT CORP. Brine 373 365
2014 NGO DEVELOPMENT CORP. Brine 272 365
2015 NGO DEVELOPMENT CORP. Brine 401 365
2016 NGO DEVELOPMENT CORP. Brine 422 365
2017 NGO DEVELOPMENT CORP. Brine 150 365
2018 NGO DEVELOPMENT CORP. Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0787425423 2015-06-09 Annular Disposal No Violations Inspect well accompanied by NGO Production Superintendent Dean Limbacher as a status check. The well was equipped with a pumping unit and motor. The annular disposal line was disconnected and is no longer in use. The 8 was plugged off. The tank battery consists of (2) 100 barrel tanks and separator inside an earthen dike. Identification posted at the tank battery. No violations. Time of inspection: 12:32 PM. Weather: 70*F, Sunny
1019905766 2010-04-13 Annular Disposal No Violations I met with Joe Jones at the well location to complete the Mechanical Integrity Test. The test began at 12:05pm with a test pressure of 310psi. The test ended at 1:05pm with a test pressure of 308psi. The test passed. I witnessed the blow down of the well.
1217817178 2008-06-04 Drill / Deepen / Reopen No Violations I witnessed drilling operations today.
1271175475 2010-04-13 Preliminary Restoration No Violations The inspection revealed that there is an active pumping unit on the well and the well is producing. The location has been properly graded and seeded to prevent erosion. The lease road has been maintained with limestone. There are two 200 barrel tanks and a separator contained within an earthen dike. There is proper display of identification posted at the tank battery. Preliminary Restoration passed.
787425423 2015-6-9 0:00:0 AD No Violations

For data sources see[9]

References