If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-089-25906 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.13,"lon":-82.47,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Licking | |
| Municipality: Newton Township | |
| Operator Name: NORTHWOOD ENERGY CORP | |
| Well Pad ID: | |
| Farm/Lease Name: DODRILL | |
| License Status: Producing | |
| License Date: 2008-02-14 | |
| Spud Date: 2008-03-31 | |
| Spud Drilling Contractor: G & H DRLG | |
| Final Drill Date: 2008-04-04 | |
| Well Total Depth: 2616.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.130000 | |
| Longitude: -82.470000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2008-02-14 | Proposed Formations:CLINTON, Issued Date:2/14/2008, Expired Date:2/13/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2008-04-04 | |
| Completion Report Received | 2008-09-17 | |
| Construction Permit Expires | 2009-02-13 | |
| Record Last Modified | 2017-02-15 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2008-11-04 | 2524 | 2550 | 20 |
| 2524 | 2550 | 20 | |
| 2524 | 2550 | 20 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 63000 Gal | 40000 |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | HOPEWELL OIL & GAS DEVELOPMENT | 830.00 | 0.00 | 0 |
| 2009 | HOPEWELL OIL & GAS DEVELOPMENT | 8940.00 | 0.00 | 365 |
| 2010 | HOPEWELL OIL & GAS DEVELOPMENT | 7777.00 | 0.00 | 0 |
| 2011 | HOPEWELL OIL & GAS DEVELOPMENT | 6660.00 | 0.00 | 0 |
| 2012 | HOPEWELL OIL & GAS DEVELOPMENT | 7162.00 | 0.00 | 366 |
| 2013 | HOPEWELL OIL & GAS DEVELOPMENT | 4858.00 | 0.00 | 365 |
| 2014 | HOPEWELL OIL & GAS DEVELOPMENT | 3419.00 | 0.00 | 365 |
| 2015 | HOPEWELL OIL & GAS DEVELOPMENT | 2580.00 | 0.00 | 365 |
| 2016 | HOPEWELL OIL & GAS DEVELOPMENT | 53.00 | 0.00 | 60 |
| 2017 | HOPEWELL OIL & GAS DEVELOPMENT | 0.00 | 0.00 | 0 |
| 2018 | HOPEWELL OIL & GAS DEVELOPMENT | 0.00 | 0.00 | 0 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2008 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 570 | |
| 2009 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 355 | 365 |
| 2010 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 310 | 0 |
| 2011 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 160 | |
| 2012 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 230 | 366 |
| 2013 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 200 | 365 |
| 2014 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 50 | 365 |
| 2015 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 365 |
| 2016 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 60 |
| 2017 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 0 |
| 2018 | HOPEWELL OIL & GAS DEVELOPMENT | Brine | 0 | 0 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1016683821 | 2019-4-16 0:00: | PW | No Violations | 0.10 |
| -451021990 | 2019-4-16 0:00: | PW | No Violations | 0.30 |
| -561641263 | 2008-4-7 0:00:0 | DD | No Violations | |
| -57878161 | 2013-10-23 0:00 | PL | No Violations | |
| 0057878161 | 2013-10-23 | Preliminary Restoration | No Violations | This inspection was conducted as a preliminary restoration status check. The well was equipped with a pumping unit and motor. It was not pumping during inspection. The area around the well has been restored. The tank battery consists of (1) 100 barrel tank and separator inside an earthen dike. Identification is posted at the tank battery. Restoration meets ORC 1509.072. |
| 0451021990 | 2019-04-16 | Production Wells | No Violations | I conducted a follow-up on the gas leak. My inspection revealed that the leak has not been corrected. I contacted Howard Harrop during the inspection. Mr. Harrop said he shut in a valve that is located on the 2 inch steel line before the leak. Mr. Harrop said that it did not correct the leak as the line was back feeding. Mr. Harrop said he was on his way to shut in other wells in the area on the sales line and will have to add a valve on the other side of the leak to prevent the gas from back feeding. I advised Mr. Harrop to contact me when it is finished. Time of inspection: 9:10 AM. Weather: 50 degrees F, Sunny |
| 0561641263 | 2008-04-07 | Drill / Deepen / Reopen | No Violations | Well drilling is complete and the rig is moving off location. |
| 1016683821 | 2019-04-16 | Production Wells | No Violations | My inspection revealed that the gas leak has been corrected. The well is in compliance. Time of inspection: 1:30 PM. Weather: 62 degrees F, Partly cloudy |
| 1555346839 | 2019-04-15 | Production Wells | No Violations | I conducted an inspection on this well today in regards to a gas leak that was called in by the landowner. My inspection revealed that gas was flowing uncontrollably from a 2 inch steel elbow fitting after the separator and a chart recorder at the tank battery. I immediately contacted Mr. Tom Giusti who is currently the receiver for Hopewell Oil & Gas Development. Mr. Giusti contacted Howard Harrop who then contacted me. I advised Mr. Harrop of the gas leak and he said he would take care of it today. I told Mr. Harrop to let me know when he has the leak corrected. I did not observe any violations at the wellhead. I observed identification at the tank battery. The tank battery consists of (1) 100 barrel tank, separator, and chart recorder inside an earthen dike. I contacted Andrew Adgate with the Emergency Response section at 1:45 PM and advised him of the gas leak. Time of inspection: 11:55 AM. Weather: 40 degrees F, Overcast |
For data sources see[9]