X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-087-20435

Well Details

Well ID: 34-087-20435
Loading map...
Country: United States
State: Ohio
County: Lawrence
Municipality: Mason Township
Operator Name: PILLAR ENERGY LLC
Well Pad ID:
Farm/Lease Name: PINKERMAN EDWARD
License Status: Active Injection
License Date: 1992-09-29
Spud Date: 1988-05-31
Spud Drilling Contractor: GARD DRILLING
Final Drill Date: 1988-06-02
Well Total Depth: 800.00 ft
Configuration: Vertical
Latitude: 38.630000
Longitude: -82.440000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1988-05-16 Issued Date 5/16/88 Expired Date 5/16/89 Acres 0001000 Tool Type RTF Proposed Formation COW RUN Proposed Depth 00800 Proposed Drill Depth 00800
Original Spud 1988-05-31 CONVERT 10-3-92 PERMIT EXPIRED.
Completed 1988-06-02 CONVERT 10-3-92 PERMIT EXPIRED.
Reached Total Depth 1988-06-02 CONVERT 10-3-92 PERMIT EXPIRED.
CO 1988-06-17 1089 MITCHELL ENERGY CORP GeoDate 5/16/88
First Injection 1988-06-17 CONVERT 10-3-92 PERMIT EXPIRED.
Completion Report Received 1988-07-05 CONVERT 10-3-92 PERMIT EXPIRED.
CO 1992-09-29 1089 MITCHELL ENERGY CORP GeoDate 9/29/92
Enhanced Recovery 1992-09-29 Issued Date 9/29/92 Expired Date 9/29/93 Acres 0001000 Tool Type RTF Proposed Formation COW RUN Proposed Depth Proposed Drill Depth
Annulus Pressure Monitoring Approved 1992-11-23 CONVERT 10-3-92 PERMIT EXPIRED.
Construction Permit Expires 1993-09-29 CONVERT 10-3-92 PERMIT EXPIRED.
Change of Owner 1999-10-22 Operator changed from 1089, MITCHELL ENERGY CORP to 3793, ENERGY SEARCH INC
Change of Owner 2008-02-26 Operator changed from 3793, ENERGY SEARCH INC to 1388, NORTH COAST ENERGY INC
Change of Owner 2009-12-14 Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC
Last Compliance Report 2013-05-16 CONVERT 10-3-92 PERMIT EXPIRED.
Change of Owner 2016-02-24 Operator changed from 7578, ENERVEST OPERATING LLC to 9619, PILLAR ENERGY LLC
Record Last Modified 2017-02-15 CONVERT 10-3-92 PERMIT EXPIRED.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2000-02-25 734 743 1
734 743 1
734 743 1

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 166 Bbl 9000 FRAC WITH 166 BBLS GELLED H2O AND 9000# 20/40 SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1988 MITCHELL ENERGY CORP 0.00 2132.00 178
1989 MITCHELL ENERGY CORP 0.00 2721.00 351
1990 MITCHELL ENERGY CORP 12.00 1453.00 361
1991 MITCHELL ENERGY CORP 12.00 944.00 362
1992 MITCHELL ENERGY CORP 11.00 692.00 317
1993 MITCHELL ENERGY CORP 0.00 0.00 0
1994 MITCHELL ENERGY CORP 0.00 0.00 365
1995 MITCHELL ENERGY CORP 0.00 0.00 0
1997 MITCHELL ENERGY CORP 0.00 0.00 0
1998 MITCHELL ENERGY CORP 0.00 0.00 0
1999 ENERGY SEARCH INC 0.00 0.00 60
2000 ENERGY SEARCH INC 0.00 0.00 365
2008 EXCO - NORTH COAST ENERGY INC 0.00 0.00 366
2009 EXCO - NORTH COAST ENERGY INC 0.00 0.00 0
2010 ENERVEST OPERATING LLC 0.00 0.00 0
2011 ENERVEST OPERATING LLC 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1988 MITCHELL ENERGY CORP Brine 27 178
1989 MITCHELL ENERGY CORP Brine 139 351
1990 MITCHELL ENERGY CORP Brine 219 361
1991 MITCHELL ENERGY CORP Brine 434 362
1992 MITCHELL ENERGY CORP Brine 373 317
1993 MITCHELL ENERGY CORP Brine 0 0
1994 MITCHELL ENERGY CORP Brine 0 365
1995 MITCHELL ENERGY CORP Brine 0 0
1997 MITCHELL ENERGY CORP Brine 0 0
1998 MITCHELL ENERGY CORP Brine
1999 MITCHELL ENERGY CORP Brine
2000 ENERGY SEARCH INC Brine 365
2008 EXCO - NORTH COAST ENERGY INC Brine 0 366
2009 EXCO - NORTH COAST ENERGY INC Brine 0 0
2010 ENERVEST OPERATING LLC Brine 0 0
2011 ENERVEST OPERATING LLC Brine 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1105986993 2010-9-13 0:00: ER No Violations 0.50
-1149159844 2019-10-15 0:00 ER No Violations 0.40
-1161305021 2007-1-24 0:00: ER No Violations
-1174185692 2004-8-8 0:00:0 SW No Violations
-1220383822 2018-6-19 0:00: ER No Violations 0.50
-1277648276 2013-9-5 0:00:0 ER No Violations 0.50
-1282031855 2005-11-22 0:00 ER No Violations
-1368771753 2012-4-5 0:00:0 ER No Violations
-1417734446 2009-11-4 0:00: ER No Violations
-1419920448 2009-5-12 0:00: ER No Violations
-1442505115 2015-10-7 0:00: ER No Violations 0.50
-1515262910 2009-8-17 0:00: ER No Violations
-1624305887 2013-7-15 0:00: ER No Violations 0.50
-1674615010 2019-6-6 0:00:0 ER No Violations 1.50
-1704953833 2006-8-15 0:00: ER No Violations
-1706764668 2008-1-23 0:00: ER No Violations
-1709769771 2005-9-20 0:00: ER No Violations
-1743685843 2003-10-8 0:00: ER No Violations
-1799968121 2003-6-19 0:00: ER No Violations
-181638625 2004-10-28 0:00 SW No Violations
-1882302187 2018-3-19 0:00: SW No Violations
-2046817256 2006-11-21 0:00 ER No Violations
-2060321997 2020-1-21 0:00: ER No Violations 0.50
-212517390 2013-10-21 0:00 ER No Violations 0.70
-252626558 2020-6-17 0:00: ER No Violations 0.50
-280535075 2008-9-25 0:00: ER No Violations
-318834957 2006-1-24 0:00: ER No Violations
-433198652 2014-2-13 0:00: ER No Violations 0.70
-639107933 2019-1-11 0:00: ER No Violations 1.50
-673022916 2005-5-5 0:00:0 ER No Violations
-743682852 2008-7-17 0:00: ER No Violations
-807845010 2013-5-3 0:00:0 ER No Violations 2.00
-820739323 2014-6-12 0:00: SW No Violations 0.50
-82781681 2013-1-7 0:00:0 SC No Violations 2.50
000PL14076 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
001269i772 2002-02-13 Enhanced Recovery Project No Violations Follow-up on NOV, In-Compliance.
0057023031 2012-04-05 Enhanced Recovery Project No Violations No violations at the time of inspection.
0082781681 2013-01-07 Surface Facility Construction No Violations Concrete dike pad has been poured. Concrete block and mortar is on site. Extended concrete apron to unloading pad.
0107126164 2010-12-30 Enhanced Recovery Project No Violations Has Enervest identification.
0181638625 2004-10-28 Salt Water Injection Well No Violations Within limits.
0202089526 2010-06-04 Enhanced Recovery Project No Violations Leak has been fixed.
0212517390 2013-10-21 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, annulus pressure, and injection pressure. Containment dike is free of water. Good identification at the well head.
0266152270 2012-08-21 Enhanced Recovery Project No Violations UIC Training and well inspection. Accompanied by Morgan Button MRI 2. Injection pump is off line due to maintenance. Reviewed dike requirements with Jim Ross.
0276172991 2011-12-09 Enhanced Recovery Project No Violations Accompanied Jon Scott for ERP training. Site clean, not exceeding max injection.
0280535075 2008-09-25 Enhanced Recovery Project No Violations Good id. No violations at this time.
0318834957 2006-01-24 Enhanced Recovery Project No Violations Pressures below maximum allowable; pressure on the annulus.
0339995284 2012-12-28 Enhanced Recovery Project No Violations Inspected injection tubing and annulus pressures for this well with Jon Scott. Well identification sign in good shape.
0351298968 2007-09-25 Enhanced Recovery Project Violations Noted Exceeding maximum injection pressures.
0351962168 2011-08-02 Enhanced Recovery Project No Violations Good identification. No violations observed during inspection.
0411485717 2018-09-04 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pressure and annulus pressure. Identification is posted at the well. The containment dike is free of fluids.
0433198652 2014-02-13 Enhanced Recovery Project No Violations Inspected containment dike, tanks, Pump house, injection pressure and annulus pressure. Good identification at well.
0517360171 2004-05-20 Salt Water Injection Well No Violations Within allowable limits.
0639107933 2019-01-11 Enhanced Recovery Project No Violations Inspected the injection pressure and annulus pressure. Identification is posted.
0658094891 2007-04-04 Enhanced Recovery Project No Violations No problems, Jim Ross has grated the lease roads.
0667665343 2007-05-31 Enhanced Recovery Project No Violations Injection pressure is high 230psi. Jim Ross is correcting the high pressure. No other violations at this time.
0673022916 2005-05-05 Enhanced Recovery Project No Violations Passed
0723579022 2015-04-06 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Walked injection line to well. Identification posted at the well.
0743682852 2008-07-17 Enhanced Recovery Project No Violations Good Identification. No violations at this time.
0807845010 2013-05-03 Enhanced Recovery Project No Violations Replacement of top joint of tubing. Cut off tubing and insert spear into tubing. Release packer. Extract 27.60 joint of 2 3/8 upset tubing. Install a 31.60 Joint of 2 3/8 upset tubing. Packer reset at 691 (pulled 20,000 lbs tension) Filled annulus with 7.17 barrels fresh water with 1.5 gallons inhibitor. Tested annulus at 320 psi for 15 minutes. At 5 minutes 320 psi. at 15 minutes 318 psi. Test passed.
0814495219 2015-06-16 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, pump house, injection pressure and annulus pressure. Good identification posted at the well.
0820739323 2014-06-12 Salt Water Injection Well No Violations No noted violations.
0845170414 2014-11-20 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Good identification at well site.
0850350856 2005-02-09 Salt Water Injection Well No Violations Within limits.
0881309272 2017-06-08 Salt Water Injection Well No Violations Salt water injection well inspection. The annulus pressure was 35 PSI, the injection tubing pressure was 30 PSI. No violations noted.
0971129096 2016-01-07 Enhanced Recovery Project No Violations No noted violations.
0987641600 2007-10-02 Enhanced Recovery Project No Violations Injection pressure is below max. inj pressure. NOV passed.
1025995430 2008-06-12 Enhanced Recovery Project No Violations No violations at this time.
1037467377 2018-10-23 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well. The containment dike is free of fluids.
1053869857 2010-03-08 Enhanced Recovery Project Violations Noted Good identification. Pressure regulator has a drip. I gave Jim Ross a verbal NOV to fix the leak. Fix the leak on the pressure regulator.
107126164 2010-12-30 0:00 ER No Violations
1087819026 2020-7-14 0:00: ER No Violations 0.50
1105986993 2010-09-13 Enhanced Recovery Project No Violations Good identification. No violations observed.
1161305021 2007-01-24 Enhanced Recovery Project No Violations No Problems at this time.
1174185692 2004-08-08 Salt Water Injection Well No Violations
1189929101 2003-02-06 Enhanced Recovery Project No Violations No violations at the time of inspection.
1220383822 2018-06-19 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted at the well. The containment dike is free of fluids.
1236075349 2004-08-08 Salt Water Injection Well No Violations Within specified range
1269i772 2002-2-13 0:00: ER No Violations
1277648276 2013-09-05 Enhanced Recovery Project No Violations Jon Scott and I performed the bimonthly UIC inspection on the injection wells in this field. There were no leaks and the identification sign was in good shape.
1282031855 2005-11-22 Enhanced Recovery Project No Violations Passed.
1339816034 2006-05-24 Enhanced Recovery Project No Violations Within limits.
1348078438 2016-03-30 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification has not been changed from Enervest to Pillar Energy.
1360098083 2004-01-28 Salt Water Injection Well No Violations
1368771753 2012-04-05 Enhanced Recovery Project No Violations Good Identification.
1369712116 2016-08-16 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well.
1375184441 2004-03-04 Salt Water Injection Well No Violations Within the specified range.
1417734446 2009-11-04 Enhanced Recovery Project No Violations Good Identification. No violations were observed.
1419920448 2009-05-12 Enhanced Recovery Project No Violations Good id. No violations were observed at time of inspection.
1438581554 2016-06-07 Enhanced Recovery Project No Violations Inspected the injection pressure and annulus pressure. The injection pump has been rebuilt. Containment dike is free of fluids.
1442505115 2015-10-07 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well.
1515262910 2009-08-17 Enhanced Recovery Project No Violations Good identification. No violations observed during inspection.
1518667430 2012-12-28 Enhanced Recovery Project No Violations Inspected enhanced recovery well injection tubing pressure and annulus pressure. Good identification at well head. Accompanied by Morgan Button MRI 2.
1588413225 2010-06-04 Enhanced Recovery Project No Violations Well id for Exco-North Coast, Needs to have Enervest information and contact phone numbers. I have talked to Jim Ross (Enervest contractor) about this needing to be changed as soon as possible.
1624305887 2013-07-15 Enhanced Recovery Project No Violations Bimonthly UIC monitoring of Greasy Ridge ERP injection wells with Jon Scott. Wellhead and well identification sign are in good shape
1697076053 2019-9-4 0:00:0 ER No Violations 1.00
1704953833 2006-08-15 Enhanced Recovery Project No Violations Within limits.
1706364549 2014-08-18 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, walked the injection line, checked the injection pressure and annulus pressure. Good identification at wellhead.
1706764668 2008-01-23 Enhanced Recovery Project No Violations Pressure regulators made by Jordan Valves have been installed and are working great. The valves have a max. back pressure of 400psi, and a max. working pressure of 600psi. They are being set slightly below max. injection pressures.
1709769771 2005-09-20 Enhanced Recovery Project No Violations OK.
1743685843 2003-10-08 Enhanced Recovery Project No Violations No violations at the time of inspection.
1799968121 2003-06-19 Enhanced Recovery Project No Violations There were no violations at the time of inspection.
1879438932 2009-02-25 Enhanced Recovery Project No Violations Good id. No violations observed during inspection.
1882302187 2018-03-19 Salt Water Injection Well No Violations I was on location today to check the pressures of this salt water injection well. The annulus pressure was 55 psi, the injection tubing pressure was 92 psi. No violations were noted during my inspection.
1954247802 2011-04-06 Enhanced Recovery Project No Violations No violations at this time.
1993201400 2013-12-11 Surface Facility Construction No Violations Inspected the changes that have been made to the pump house injection line manifolds and the change over to a different injection pump. Inspected the unloading pad, containment dike and tanks.
202089526 2010-6-4 0:00:0 ER No Violations 0.20
2026390489 2013-03-14 Enhanced Recovery Project No Violations Accompanied Morgan Button on inspection. Inspected injection pressure and annulus pressure. Good identification at wellhead. Well is shut in for repairs. A brine drip was observed during the inspection. We talked to Jim Ross and he went to the well and disconnected the injection line from the well and installed 2 plugs in each side. Jim informed me that the well is scheduled to have the top joint of tubing replaced with-in the next 2 weeks. The service rig is on the lease working on production wells and will be moving to the site as soon as possible. I went back to the well and verified that the leak was stopped. Both 2 plugs are installed and not leaking. The leak was caused by a frozen check valve, the top of the check valve had been knocked loose.
2046817256 2006-11-21 Enhanced Recovery Project No Violations No problems
2135467508 2008-03-25 Enhanced Recovery Project No Violations No violations were observed. The new pressure regulator is working well.
266152270 2012-8-21 0:00: ER No Violations
276172991 2011-12-9 0:00: ER No Violations 0.30
339995284 2012-12-28 0:00 ER No Violations 0.70
351298968 2007-9-25 0:00: ER No Violations
351962168 2011-8-2 0:00:0 ER No Violations
411485717 2018-9-4 0:00:0 ER No Violations 0.40
517360171 2004-5-20 0:00: SW No Violations
57023031 2012-4-5 0:00:0 ER No Violations 0.50
658094891 2007-4-4 0:00:0 ER No Violations
667665343 2007-5-31 0:00: ER No Violations
723579022 2015-4-6 0:00:0 ER No Violations 0.50
814495219 2015-6-16 0:00: ER No Violations 1.50
845170414 2014-11-20 0:00 ER No Violations 0.50
850350856 2005-2-9 0:00:0 SW No Violations
881309272 2017-6-8 0:00:0 SW No Violations 3.50
971129096 2016-1-7 0:00:0 ER No Violations 1.00
987641600 2007-10-2 0:00: ER No Violations
PL14076 PL No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0351298968 US-OH-123686 2007-09-27 Exceeding maximum allowable injection pressure
1053869857 US-OH-100936 2010-03-17 Mechanical failure/contamination

For data sources see[9]

References