If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-085-20569 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.75,"lon":-81.09,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Lake | |
Municipality: Madison Township | |
Operator Name: CNG PRODUCING COMPANY | |
Well Pad ID: | |
Farm/Lease Name: WOOD V | |
License Status: Final Restoration | |
License Date: 1988-04-29 | |
Spud Date: 1984-11-24 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1984-11-28 | |
Well Total Depth: 3194.00 ft | |
Configuration: Vertical | |
Latitude: 41.750000 | |
Longitude: -81.090000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1984-03-13 | Issued Date 3/13/84 Expired Date 9/9/84 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1984-08-16 | 1530 CNG PRODUCING COMPANY GeoDate 8/16/84 |
Oil and Gas | 1984-08-16 | Issued Date 8/16/84 Expired Date 2/12/85 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03194 Proposed Drill Depth 03194 |
Original Spud | 1984-11-24 | R.I. 8-18-84 |
Completed | 1984-11-28 | R.I. 8-18-84 |
Reached Total Depth | 1984-11-28 | R.I. 8-18-84 |
Completion Report Received | 1985-01-04 | R.I. 8-18-84 |
CO | 1985-01-21 | 1530 CNG PRODUCING COMPANY GeoDate 3/13/84 |
CO | 1988-04-29 | 1530 CNG PRODUCING COMPANY GeoDate 4/29/88 |
COMBINATION WELL | 1988-04-29 | Issued Date 4/29/88 Expired Date 4/29/89 Proposed Purpose OG Was Plug Supervised N Who Superivsed BY CO.Plug and Abandon Date 10/13/88 |
Plugged/Abandoned | 1988-10-13 | R.I. 8-18-84 |
Construction Permit Expires | 1989-04-29 | R.I. 8-18-84 |
Record Last Modified | 2013-03-14 | R.I. 8-18-84 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 0 | 0 | |
0 | 0 | ||
2006-09-11 | 2954 | 3000 | 18 |
2954 | 3000 | 18 | |
0 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
GEL | 0 | 850 Bbl | 45000 | FRAC: H2O,SAND | ||
ACID | 8 | 500 Gal | 0 | 7 1/2% FE. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | CNG PRODUCING COMPANY | 7642.00 | 0.00 | 365 |
1986 | CNG PRODUCING COMPANY | 4844.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | CNG PRODUCING COMPANY | Brine | 928 | 365 |
1986 | CNG PRODUCING COMPANY | Brine | 750 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000008906 | Final Restoration | No Violations | PASSED WITNESSED 8/27/90 INSPECTOR S. SINN DATE 08/2719/90 DATA FROM OLD VAX INFO | |
0000DP4234 | Final Restoration | No Violations | Final Restoration done information from Data Point | |
8906 | FR | No Violations | ||
DP4234 | FR | No Violations |
For data sources see[9]