If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-083-24542 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.29,"lon":-82.56,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Knox | |
| Municipality: Milford Township | |
| Operator Name: KNOX ENERGY INC. | |
| Well Pad ID: | |
| Farm/Lease Name: HIGGINS T & J | |
| License Status: Producing | |
| License Date: 2011-12-06 | |
| Spud Date: 2012-03-29 | |
| Spud Drilling Contractor: KILBARGER DRLG | |
| Final Drill Date: 2012-04-28 | |
| Well Total Depth: 2288.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.290000 | |
| Longitude: -82.560000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2011-12-06 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:12/6/2011, Expired Date:12/5/2013 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
| Reached Total Depth | 2012-04-28 | |
| Completion Report Received | 2012-07-16 | |
| Construction Permit Expires | 2013-12-05 | |
| Record Last Modified | 2017-10-24 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2012-07-23 | 2147 | 2158 | 12 |
| 2147 | 2158 | 12 | |
| 2147 | 2158 | 12 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| 2012-06-22 | H2O | 15 | 43844 Gal | 10000 | Producers Service Corporation |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | KNOX ENERGY INC. | 3325.00 | 0.00 | 89 |
| 2013 | KNOX ENERGY INC. | 11629.00 | 0.00 | 365 |
| 2014 | KNOX ENERGY INC. | 9632.00 | 0.00 | 365 |
| 2015 | KNOX ENERGY INC. | 8854.00 | 0.00 | 365 |
| 2016 | KNOX ENERGY INC. | 8572.00 | 0.00 | 365 |
| 2017 | KNOX ENERGY INC. | 7540.00 | 0.00 | 365 |
| 2018 | KNOX ENERGY INC. | 6472.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2012 | KNOX ENERGY INC. | Brine | 70 | 89 |
| 2013 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2014 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2015 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2016 | KNOX ENERGY INC. | Brine | 35 | 365 |
| 2017 | KNOX ENERGY INC. | Brine | 0 | 365 |
| 2018 | KNOX ENERGY INC. | Brine | 0 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1170015357 | 2012-4-27 0:00: | DD | No Violations | |
| -1696494555 | 2013-4-23 0:00: | PL | No Violations | |
| 1170015357 | 2012-04-27 | Drill / Deepen / Reopen | No Violations | Today I witnessed the cementing of the surface casing on Kilbarger rig #4. |
| 1696494555 | 2013-04-23 | Preliminary Restoration | No Violations | I inspected this well today it is in production. |
For data sources see[9]