X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-083-24239

Well Details

Well ID: 34-083-24239
Loading map...
Country: United States
State: Ohio
County: Knox
Municipality: Morgan Township
Operator Name: MARAM ENERGY INC
Well Pad ID:
Farm/Lease Name: CAMPBELL ONETA
License Status: Producing
License Date: 2005-06-27
Spud Date: 2005-08-08
Spud Drilling Contractor: H & D DRILLING
Final Drill Date: 2006-06-09
Well Total Depth: 3662.00 ft
Configuration: Vertical
Latitude: 40.260000
Longitude: -82.470000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2005-06-27 Proposed Formations:TRENTON, Issued Date:6/27/2005, Expired Date:6/27/2006 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:ENPW
Original Spud 2005-08-08 RBDMS Rec
Completed 2006-06-09 RBDMS Rec
Reached Total Depth 2006-06-09 RBDMS Rec
Construction Permit Expires 2006-06-27 RBDMS Rec
Completion Report Received 2006-08-03 RBDMS Rec
Correction to Well 2006-08-04 ADDED "CLINTON" TO PROPOSED GEOLOGICAL FORMATIONS.
Change of Owner 2017-02-15 Operator changed from 560, MARION OPERATING CORP to 476, MARAM ENERGY CO
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2007-10-17 2238 2256 22
2238 2256 22
2238 2256 22

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1000 Bbl 30000 CLINTON COMPLETION REPORT REC'D 10/17/07
ACID 20 1000 Gal 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 MARION OPERATING CORP 2434.00 0.00 365
2010 MARION OPERATING CORP 1885.00 0.00 365
2011 MARION OPERATING CORP 3054.00 0.00 0
2012 MARION OPERATING CORP 2752.00 0.00 366
2013 MARION OPERATING CORP 2474.00 0.00 365
2014 MARION OPERATING CORP 1132.00 0.00 365
2015 MARION OPERATING CORP 676.00 0.00 365
2016 MARION OPERATING CORP 179.00 0.00 120
2017 MARION OPERATING CORP 24.00 0.00 365
2018 MARAM ENERGY INC 1208.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 MARION OPERATING CORP Brine 160 365
2010 MARION OPERATING CORP Brine 395 365
2011 MARION OPERATING CORP Brine 235
2012 MARION OPERATING CORP Brine 240 366
2013 MARION OPERATING CORP Brine 0 365
2014 MARION OPERATING CORP Brine 75 365
2015 MARION OPERATING CORP Brine 75 365
2016 MARION OPERATING CORP Brine 75 120
2017 MARAM ENERGY INC Brine 170 334
2018 MARAM ENERGY INC Brine 270 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1793289316 2006-3-1 0:00:0 PW No Violations
0601920351 2008-12-09 Preliminary Restoration No Violations Well was being pumped today. Tanks are set and have proper identification. Pits have been filled, area revegetated/stabilized. Preliminary restoration passes.
1123774409 2005-08-11 Drill / Deepen / Reopen No Violations Located site. Harold Donaker indicated that they would probably be running 7 inch today.
1124797671 2005-08-23 Drill / Deepen / Reopen No Violations Well being drilled by Harold Donaker and by use of a power swivel on fluid. Speaking with drillers, they feel that the fluid should be able to keep any gas from blowing out during drilling. Drillers are almost through the Big Lime and are at 2573 ft. New pit has been constructed at a higher elevation and the levels are being maintained in the lower pit.
1127302246 2005-09-20 Drill / Deepen / Reopen No Violations Drilling of well has been completed and rig moved off site. No production yet.
1133555691 2005-12-02 Production Wells No Violations No pump jack on well head yet. Lined pits still open.
1178733855 2007-05-09 Preliminary Restoration No Violations Preliminary restoration is due. Pit still remains to be closed and area graded and seeded. Tubing remains on site also.
1717886517 2015-02-05 Production Wells No Violations This inspection was conducted as a production well status check. The well was equipped with a pumping unit and motor. The tank battery consists of (1) 100 barrel tank and separator inside an earthen dike. Identification posted at tank. No violations. Time of inspection: 12:43 PM. Weather: 15 degrees F, Sunny, 2 snow
1766324864 2005-08-12 Drill / Deepen / Reopen No Violations Spoke with workers on site. They were bailing hole and getting ready to run 7 inch pipe. Cementing of 7 inch is planned for 10 a.m. today. Mentioned to owner Dick Hart that permit called for no earthen pits due to floodplain but location of pit appeared to be out of floodplain and was ok if he kept fluids down. Additional pit will be constructed at an even higher elevation.
1793289316 2006-03-01 Production Wells No Violations Drilling started on this site in August 2005. Well is not producing yet, no pump jack or tanks have been set up yet. The pits are now due to be closed this month.
601920351 2008-12-9 0:00: PL No Violations

For data sources see[9]

References