X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-083-23949

Well Details

Well ID: 34-083-23949
Loading map...
Country: United States
State: Ohio
County: Knox
Municipality: Butler Township
Operator Name: VALLEY PETROLEUM MANAGEMENT
Well Pad ID:
Farm/Lease Name: BEATTY JACK & BEULAH
License Status: Final Restoration
License Date: 2008-05-05
Spud Date: 1991-09-09
Spud Drilling Contractor: DUGAN DRILLING
Final Drill Date: 1991-10-04
Well Total Depth: 3058.00 ft
Configuration: Vertical
Latitude: 40.330000
Longitude: -82.250000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1991-07-12 Issued Date 7/12/91 Expired Date 7/11/92 Acres 0188150 Tool Type CT Proposed Formation CLINTON Proposed Depth 03058 Proposed Drill Depth 03058
Original Spud 1991-09-09
Completed 1991-10-04
Reached Total Depth 1991-10-04
CO 1991-10-15 360 RELIANCE ENERGY INC GeoDate 7/12/91
Completion Report Received 1991-10-15
Change of Owner 1999-07-02 Operator changed from 360, RELIANCE ENERGY INC to 231, VALLEY PETROLEUM MANAGMNT
APP 2008-05-05 Proposed Formations:CLINTON, Issued Date:5/5/2008, Expired Date:5/5/2009 6:00:00 AM, Drilling unit acres:188.5, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2008-05-29
Construction Permit Expires 2009-05-05
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 2985 3012 0
2985 3012 0
2985 3012 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1800 Bbl 20000 FRAC W/1800 BW & 200 SX SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1991 RELIANCE ENERGY INC 0.00 4198.00 92
1992 RELIANCE ENERGY INC 5638.00 4881.00 365
1993 RELIANCE ENERGY INC 9867.00 7216.00 365
1994 RELIANCE ENERGY INC 4654.00 3228.00 365
1995 RELIANCE ENERGY INC 6112.00 3464.00 365
1996 RELIANCE ENERGY INC 4652.00 1885.00 365
1997 RELIANCE ENERGY INC 3098.00 998.00 365
1998 RELIANCE ENERGY INC 2510.00 690.00 362
1999 VALLEY PETROLEUM MANAGEMENT 948.00 243.00 183
2000 VALLEY PETROLEUM MANAGEMENT 1748.00 507.00 365
2001 VALLEY PETROLEUM MANAGEMENT 1706.00 573.00 365
2002 VALLEY PETROLEUM MANAGEMENT 1468.00 525.00 365
2003 VALLEY PETROLEUM MANAGEMENT 1417.00 256.00 365
2004 VALLEY PETROLEUM MANAGEMENT 1546.00 397.00 365
2005 VALLEY PETROLEUM MANAGEMENT 1309.00 361.00 365
2006 VALLEY PETROLEUM MANAGEMENT 917.00 179.00 365
2007 VALLEY PETROLEUM MANAGEMENT 979.00 219.00 365
2008 VALLEY PETROLEUM MANAGEMENT 790.00 163.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1991 RELIANCE ENERGY INC Brine 415 92
1992 RELIANCE ENERGY INC Brine 85 365
1993 RELIANCE ENERGY INC Brine 55 365
1994 RELIANCE ENERGY INC Brine 19 365
1995 RELIANCE ENERGY INC Brine 50 365
1996 RELIANCE ENERGY INC Brine 64 365
1997 RELIANCE ENERGY INC Brine 34 365
1998 RELIANCE ENERGY INC Brine 0 362
1999 VALLEY PETROLEUM MANAGEMENT Brine 0 183
2000 VALLEY PETROLEUM MANAGEMENT Brine 0 365
2001 VALLEY PETROLEUM MANAGEMENT Brine 34 365
2002 VALLEY PETROLEUM MANAGEMENT Brine 4 365
2003 VALLEY PETROLEUM MANAGEMENT Brine 321 365
2004 VALLEY PETROLEUM MANAGEMENT Brine 0 365
2005 VALLEY PETROLEUM MANAGEMENT Brine 0 365
2006 VALLEY PETROLEUM MANAGEMENT Brine 142 365
2007 VALLEY PETROLEUM MANAGEMENT Brine 172 365
2008 VALLEY PETROLEUM MANAGEMENT Brine 440 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-998390862 2008-5-22 0:00: PB No Violations
001287i800 2002-06-24 Preliminary Restoration No Violations
0998390862 2008-05-22 Plug / Plug Back No Violations All of the pipe out. Plugging nearly done, but more clay still needed in the hole. 20 joints of 8 inch counted on the ground. Some sections had holes in them. Inspection with Jeff Fry.
1183635044 2015-06-18 Final Restoration No Violations All production equiptment and debris has been removed from the well site and pits have been filled. Burried wellhead is located within a crop field where vegetation has been restored. Final restoration passes.
1211476501 2008-05-13 Plug / Plug Back No Violations Well being plugging, water had come in the 8 inch. Spoke with Randy Moran on site. Advised to bail well before pulling 8 inch if needed in the end. Clay on site, none washed yet.
1287i800 2002-6-24 0:00: PL No Violations

For data sources see[9]

References