34-083-20788

Well Details

Well ID: 34-083-20788
Loading map...
Country: United States
State: Ohio
County: Knox
Municipality: Jackson Township
Operator Name: DUGAN OIL AND GAS LLC
Well Pad ID:
Farm/Lease Name: DUGAN JEFFERY & AMANDA
License Status: Producing
License Date: 2016-09-26
Spud Date: 2016-10-03
Spud Drilling Contractor: CO TOOLS
Final Drill Date: 2016-12-28
Well Total Depth: 3020.00 ft
Configuration: Vertical
Latitude: 40.240000
Longitude: -82.200000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1953-02-01
Completed 1953-03-07
Plugged/Abandoned 1956-12-03
Change of Owner 2014-07-25 Operator changed from 6217, DAVIDSON OSCAR to 9292, DUGAN OIL AND GAS LLC
APP 2016-09-26 Proposed Formations:CLINTON SAND, Issued Date:9/26/2016, Expired Date:9/26/2018 12:00:00 PM, Drilling unit acres:120, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2016-12-28
Completion Report Received 2017-02-15
Record Last Modified 2017-10-24
Construction Permit Expires 2018-09-26

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
1953-03-10 NITR 0 120 Qts 0
2017-01-03 H2O 15 63900 Gal 22000 Producers Service Corporation

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 DUGAN OIL AND GAS LLC 0.00 74.00 260

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 DUGAN OIL AND GAS LLC Brine 150 260

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1079768706 2017-1-3 0:00:0 DD No Violations
-124252670 2016-10-17 0:00 DD No Violations
-1330776807 2016-12-7 0:00: DD No Violations
-1340897752 2016-10-25 0:00 DD No Violations
-2125466930 2016-12-1 0:00: DD No Violations
-625865148 2016-12-27 0:00 DD No Violations
-990692429 2016-12-5 0:00: DD No Violations
0124252670 2016-10-17 Drill / Deepen / Reopen No Violations Drilling operations are ongoing with the reopening of this well. Jet wire services was on site to run a bond log on the surface casing cement job. The log showed that it was a good cement bond.
0205606116 2016-09-22 Drill / Deepen / Reopen No Violations They were in the process of moving in the rig and rigging it up to begin reopening this plugged well during this inspection.
0562846521 2016-11-25 Drill / Deepen / Reopen No Violations Drilling operations are on going with the reopening of this well. They are currently 2890 feet and cleaning out the bottom of the well bore.
0572713695 2016-10-07 Drill / Deepen / Reopen No Violations Drilling operations are ongoing with the reopening of this well. They are currently cleaning out the main well bore.
0618346500 2016-12-08 Drill / Deepen / Reopen No Violations Drilling operations are on going with this well construction. They ran the 4 1/2 inch production casing today and Cemenco Services Inc. was on site to cement in the casing.
0625453828 2016-11-04 Drill / Deepen / Reopen No Violations Operations are ongoing with the reopening of this well. They are currently 730 feet deep with no issues during this inspection.
0625865148 2016-12-27 Drill / Deepen / Reopen No Violations Drilling operations are ongoing with this well they have lost tools and some cable down hole and are in the process of fishing them out.
0681191052 2016-09-29 Drill / Deepen / Reopen No Violations Drilling operations are underway with the clean out of this plugged well. They are currently rigging up on location.
0842622887 2016-11-10 Drill / Deepen / Reopen No Violations Drilling operations are on going with the reopening of this well. They are currently 800 feet deep and preparing to run and mud in the 7 inch intermediate string.
0990692429 2016-12-05 Drill / Deepen / Reopen No Violations Drilling operations are ongoing with the reopening of this well. They are currently working on the bottom of the hole cleaning it out.
1079768706 2017-01-03 Drill / Deepen / Reopen No Violations Producers Service Corporation was on site today to frack this well.
1139657686 2017-01-17 Drill / Deepen / Reopen No Violations The well is being set up with the pumping unit. They are in the process of tearing down the rig and moving to a new well location.
1330776807 2016-12-07 Drill / Deepen / Reopen No Violations Drilling operations are on going with the clean out of this old well bore. They have finished up cleaning out the bottom of the hole and are now preparing to run the 4 1/2 inch production casing.
1340897752 2016-10-25 Drill / Deepen / Reopen No Violations Drilling operations are ongoing with this well. There was no one present during this inspection.
1437347880 2016-11-14 Drill / Deepen / Reopen No Violations Cemenco Services Inc. and Mike wheeler was on site to mud in the 7 inch intermediate string of casing today. 4 tons of fire clay was used mudding it in.
1476199932 2016-10-11 Casing String Witnessed No Violations On the day of my inspection I found that Dugan Drilling had 8.625 inch casing set at a depth of 488 feet inside of 10 inch hole. Cemenco pumped a mixture of gel and cotton seed hulls prior to mixing cement. The well did not circulate during the mixing stage. They mixed 80 sacks of class A cement and pumped it down the well. The well did not circulate until the displacement stage. There were two brief moments where gel and cotton seed hulls were circulated to surface during displacement, but the mixture fell back down the annulus as soon as Cemenco stopped pumping. I spoke with Knox County inspector Mark McCombs. He claimed that the area has a history of the cement falling to 40 to 60 feet. I told Dugan to let the cement set overnight, and top it off with sack cement. They agreed to top it off the following day after the casing pressure test.
1476285903 2016-10-12 Drill / Deepen / Reopen No Violations On the day of my inspection I met Guy Dugan at the site to witness the pressure test and the casing being topped off with sack cement. Cemenco pumped into the casing and brought the pressure up to 300 psi. The pressure bled off to 150 psi. within 5 minutes. Dugan Drilling tightened the cement head down on the casing and Cemenco tried to bleed all of the air out of the system. They pressured up on the casing again and the test failed again. I spoke with Guy Dugan and requested that he have a bond log run on the surface casing cement job.
1476452675 2016-10-14 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Dugan Drilling was not working at the drill site. The cement head had been removed and the 8.625 inch casing was open. The fluid had fallen out of sight. I dropped a small rock and estimated the fluid to be down 150 feet. I also dropped a pebble down the annulus and estimated the cement to be down 100 feet. I called Guy Dugan and he said they were still waiting on Jet Wireline to run the bond log.
1476715428 2016-10-17 Drill / Deepen / Reopen No Violations On the day of my inspection Jet Wireline Service was on site to run a bond log on the surface casing cement job. The log showed the cement top at 42 feet. Dugan had 25 bags of sack cement to top the annulus off.
205606116 2016-9-22 0:00: DD No Violations
2125466930 2016-12-01 Drill / Deepen / Reopen No Violations Drilling operations are on going with the clean out of this well. The rig is setting idle during this inspection.
562846521 2016-11-25 0:00 DD No Violations
572713695 2016-10-7 0:00: DD No Violations
618346500 2016-12-8 0:00: DD No Violations
625453828 2016-11-4 0:00: DD No Violations
681191052 2016-9-29 0:00: DD No Violations
842622887 2016-11-10 0:00 DD No Violations

For data sources see[8]

References