If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-20711 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.26,"lon":-82.28,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Jackson Township | |
Operator Name: WHEELER MICHAEL D | |
Well Pad ID: | |
Farm/Lease Name: TAYLOR MAMIE | |
License Status: Producing | |
License Date: 2007-02-20 | |
Spud Date: 2007-02-20 | |
Spud Drilling Contractor: SHOEMAKER DRLG | |
Final Drill Date: 2007-03-20 | |
Well Total Depth: 2741.00 ft | |
Configuration: Vertical | |
Latitude: 40.260000 | |
Longitude: -82.280000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1801-01-02 | 79 OXFORD OIL CO |
Oil and Gas | 1802-01-01 | |
Original Spud | 1952-12-03 | |
Completed | 1953-01-08 | |
APP | 2000-11-09 | Proposed Formations:CLINTON, Issued Date:11/9/2000, Expired Date:11/9/2001 6:00:00 AM, Drilling unit acres:101, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2001-02-22 | |
Change of Owner | 2007-02-05 | Operator changed from 79, OXFORD OIL to 5476, WHEELER MICHAEL D |
APP | 2007-02-20 | Proposed Formations:CLINTON, Issued Date:2/20/2007, Expired Date:2/20/2008 6:00:00 AM, Drilling unit acres:101, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2007-03-20 | |
Completion Report Received | 2007-07-02 | |
Construction Permit Expires | 2008-02-20 | |
Record Last Modified | 2018-01-31 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 2691 | 2741 | 0 |
2691 | 2741 | 0 | |
2691 | 2741 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
NITR | 0 | 150 Qts | 0 | |||
H2O | 0 | 2000 Bbl | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | OXFORD OIL | 0.00 | 708.00 | 0 |
1985 | OXFORD OIL | 5.00 | 0.00 | 365 |
1986 | OXFORD OIL | 0.00 | 778.00 | 365 |
1987 | OXFORD OIL | 0.00 | 713.00 | 365 |
1988 | OXFORD OIL | 0.00 | 665.00 | 365 |
1989 | OXFORD OIL | 0.00 | 661.00 | 365 |
1990 | OXFORD OIL | 0.00 | 659.00 | 365 |
1991 | OXFORD OIL | 0.00 | 466.00 | 365 |
1992 | OXFORD OIL | 0.00 | 351.00 | 365 |
1993 | OXFORD OIL | 0.00 | 249.00 | 365 |
1994 | OXFORD OIL | 0.00 | 38.00 | 365 |
1995 | OXFORD OIL | 0.00 | 114.00 | 365 |
1996 | OXFORD OIL | 0.00 | 121.00 | 366 |
1997 | OXFORD OIL | 0.00 | 0.00 | 365 |
1998 | OXFORD OIL | 0.00 | 71.00 | 365 |
1999 | OXFORD OIL | 0.00 | 124.00 | 365 |
2000 | OXFORD OIL | 0.00 | 65.00 | 0 |
2001 | OXFORD OIL | 0.00 | 0.00 | 365 |
2002 | OXFORD OIL | 0.00 | 0.00 | 365 |
2007 | WHEELER MICHAEL D | 0.00 | 1379.00 | 275 |
2008 | WHEELER MICHAEL D | 0.00 | 1466.00 | 365 |
2009 | WHEELER MICHAEL D | 0.00 | 1406.00 | 365 |
2010 | WHEELER MICHAEL D | 0.00 | 1171.00 | 365 |
2011 | WHEELER MICHAEL D | 0.00 | 870.00 | 365 |
2012 | WHEELER MICHAEL D | 0.00 | 742.00 | 366 |
2013 | WHEELER MICHAEL D | 0.00 | 524.00 | 365 |
2014 | WHEELER MICHAEL D | 0.00 | 702.00 | 365 |
2015 | WHEELER MICHAEL D | 0.00 | 430.00 | 365 |
2016 | WHEELER MICHAEL D | 0.00 | 447.00 | 365 |
2017 | WHEELER MICHAEL D | 0.00 | 594.00 | 365 |
2018 | WHEELER MICHAEL D | 0.00 | 401.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | OXFORD OIL | Brine | 0 | 0 |
1985 | OXFORD OIL | Brine | 0 | 365 |
1986 | OXFORD OIL | Brine | 170 | 365 |
1987 | OXFORD OIL | Brine | 75 | 365 |
1988 | OXFORD OIL | Brine | 33 | 365 |
1989 | OXFORD OIL | Brine | 30 | 365 |
1990 | OXFORD OIL | Brine | 46 | 365 |
1991 | OXFORD OIL | Brine | 38 | 365 |
1992 | OXFORD OIL | Brine | 10 | 365 |
1993 | OXFORD OIL | Brine | 5 | 365 |
1994 | OXFORD OIL | Brine | 20 | 365 |
1995 | OXFORD OIL | Brine | 0 | 365 |
1996 | OXFORD OIL | Brine | 20 | 366 |
1997 | OXFORD OIL | Brine | 0 | 365 |
1998 | OXFORD OIL | Brine | 60 | 365 |
1999 | OXFORD OIL | Brine | 23 | 365 |
2000 | OXFORD OIL | Brine | 25 | |
2001 | OXFORD OIL | Brine | 2 | 365 |
2002 | OXFORD OIL | Brine | 0 | 365 |
2007 | WHEELER MICHAEL D | Brine | 870 | 275 |
2008 | WHEELER MICHAEL D | Brine | 685 | 365 |
2009 | WHEELER MICHAEL D | Brine | 780 | 365 |
2010 | WHEELER MICHAEL D | Brine | 588 | 365 |
2011 | WHEELER MICHAEL D | Brine | 80 | 365 |
2012 | WHEELER MICHAEL D | Brine | 150 | 366 |
2013 | WHEELER MICHAEL D | Brine | 120 | 365 |
2014 | WHEELER MICHAEL D | Brine | 155 | 365 |
2015 | WHEELER MICHAEL D | Brine | 160 | 365 |
2016 | WHEELER MICHAEL D | Brine | 105 | 365 |
2017 | WHEELER MICHAEL D | Brine | 70 | 365 |
2018 | WHEELER MICHAEL D | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
001287i838 | 2002-07-01 | Final Restoration | No Violations | |
1172671521 | 2007-02-28 | Drill / Deepen / Reopen | No Violations | Well is being reopened. Drillers indicated that that were unable to run 8 5/8 inch surface casing because the existing 10 inch drive pipe was too crooked. They attempted to pull the drive pipe but could not move it. They are now drilling down to the 6 inch seat and will run 7 inch to below the Berea and then will power mud the 7 inch before continuing drilling. They will also be running a basket on the last joint before mudding. Mud job will probably occur today. (Hole is full of water). |
1219153356 | 2008-08-19 | Production Wells | No Violations | This reopened well is in production. Tanks have been set and have proper ID on them. |
1287i838 | 2002-7-1 0:00:0 | FR | No Violations |
For data sources see[9]