X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-081-20810

Well Details

Well ID: 34-081-20810
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Cross Creek Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001615
Farm/Lease Name: ROXY NE CRC JF
License Status: Producing
License Date: 2019-05-24
Spud Date: 2019-05-25
Spud Drilling Contractor:
Final Drill Date: 2019-08-03
Well Total Depth: 21612.00 ft
Configuration: Horizontal
Latitude: 40.320000
Longitude: -80.740000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2019-03-01 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/1/2019, Expired Date:2/29/2020, Drilling unit acres:85.239, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2019-05-24 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:5/24/2019, Expired Date:5/23/2020, Drilling unit acres:317.08, Proposed Well Type:OG, Proposed Well Class:POOL
Record Last Modified 2019-05-31
Construction Permit Expires 2020-05-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
9909 21461 0
9909 21461 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1242172165 2019-9-5 0:00:0 CT No Violations 1.00
-1495768957 2019-5-28 0:00: CS No Violations 1.00
-1721465603 2019-7-16 0:00: CS No Violations 2.00
-2112439404 2019-7-23 0:00: DD No Violations 1.00
-934641552 2019-8-12 0:00: CT No Violations 1.00
10443734 2019-9-11 0:00: CT No Violations 1.00
1253033336 2019-8-21 0:00: CT No Violations 1.00
1495768957 2019-05-28 Casing String Witnessed No Violations PAD ADDRESS: 7429 CR 26, Bloomingdale 43910. On the day of my inspection I witnessed this hole topped off with 15 cubic yards of 9-sack grout. Regular job was pumped on 5/27 and was not witnessed. Well was spudded on 5/25. Precision drilled a 30 inch diameter hole to 99 feet and ran 100 feet of 24 inch diameter conductor casing.
1563279274 2019-7-16 0:00: CS No Violations 4.00
1564091905 2019-7-23 0:00: CS No Violations 6.00
1777593966 2019-8-28 0:00: CT No Violations 1.00
1828809104 2019-7-23 0:00: CS No Violations 1.00
1937055826 2020-4-20 0:00: PL No Violations 1.00

For data sources see[4]

References