X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-081-20790

Well Details

Well ID: 34-081-20790
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Smithfield Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001579
Farm/Lease Name: LORI SW SMF JF
License Status: Producing
License Date: 2018-10-16
Spud Date: 2018-10-21
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2018-12-23
Well Total Depth: 20026.00 ft
Configuration: Horizontal
Latitude: 40.230000
Longitude: -80.770000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-10-16 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:10/16/2018, Expired Date:10/15/2020 12:00:00 PM, Drilling unit acres:433.831, Proposed Well Type:OG, Proposed Well Class:EOUT
Correction to Well 2018-11-30 CORRECTION TO TARGET INFORMATON AND UNIT SIZE FROM AS DRILLED SURVEY PLAT.
Reached Total Depth 2018-12-23
Record Last Modified 2019-05-16
Construction Permit Expires 2020-10-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
10142 19787 0
10142 19787 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1562080481 2019-3-27 0:00: CT No Violations 1.00
-166201593 2019-5-15 0:00: CT No Violations 1.00
-1688183096 2018-10-23 0:00 CS No Violations 3.00
-1928136960 2018-12-3 0:00: CS No Violations 2.00
0022462444 2019-04-22 Completion Testing No Violations On the day of my inspection I witnessed an FTS frac crew on location tied into the 1H, 6H, and 8H wells. This well has already been fracked. The 13.375x9.625 annular pressure is 0 psi and the 9.625x5.5 annular pressure is 1000 psi.
0127473421 2018-12-06 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Pioneer 77 drilled a 17.5 inch diameter open hole to a depth of 1607 feet. Previous casing set and cemented was 18.625 inch diameter mine string casing to a depth of 289 feet. Wyoming casing ran 1610 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot. Shoe track is 43 feet long. CJ/Otex was onsite with 1215 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.19. 30% excess ran in open hole. Cement displaced with 237 barrels of fresh water. 35 barrels of gel and 15 barrels of water pumped ahead of cement. 38 barrels of cement returned to surface, and floats held with 1 barrels back.
0166201593 2019-05-15 Completion Testing No Violations On the day of my inspection I witnessed a CWS stand alone snubbing unit onsite drilling out frac plugs. This well has not been drilled out yet. The 13.375x9.625 annular pressure is zero and the 9.625x5.5 annular pressure is 1300 psi.
0518493740 2019-04-11 Completion Testing No Violations On the day of my inspection I witnessed a frac tech services crew on location tied into the the 1H, 6H, and 8H wells. Company men onsite were Bill Pugh and Dave Norris. This well has already been fracked. Frac finished on the 56th stage on 4/4/19. 13.375x9.625 annular pressure was zero and 9.625x5.5 annular pressure was 800 psi.
0671829410 2018-12-18 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Pioneer 77 drilling an 8.5 inch diameter hole at 16,820 feet. Estimated total depth is 20,110 feet. Company Man Ralph Dupois said they are drilling on 13.7 ppg mud weight. A small flare was burning intermittantly.
0727302463 2018-12-12 Casing String Witnessed No Violations On the day of my inspection I witnessed the intermediate casing cement job. Pioneer 77 drilled a 12.25 inch diameter open hole to a depth of 8897 feet. Previous casing set and cemented was 13.375 inch diameter surface casing to a depth of 1607 feet. Wyoming casing ran 8889.9 feet of 9.625 inch diameter casing, l-80, 40 lbs/foot, with 2.9 foot stick up. DV tool at 4797. Casing was centralized. Shoe track is 87 feet long. CJ/Otex was onsite with 535 sacks of class H lead cement and 750 sacks of class H tail cement for the first stage. Lead weighs 14 ppg with a 1.35 yield and tail weigh 15 ppg with a 1.16 yield. 50 barrels of 14 ppg mudpush spacer ran before cement. Hole loaded with 12.9 ppg oil based mud. Cement displaced with 664 barrels of oil based mud and floats held. Dropped bomb, opened DV tool and circulated for three hours. 50 barrel of spacer and 36 barrel of cement returned to surface. Second stage was not witnessed but they are to pump 1715 sacks of class H cement weighing 15.3 ppg with a 1.11 yield. Displacement is 349 barrels. Company man Ralph Dupois said 26 barrels of cement returned to surface and then circulation was lost with about40 barrels left in displacement.
127473421 2018-12-6 0:00: CS No Violations 3.00
1562080481 2019-03-27 Completion Testing No Violations On the day of my inspection I witnessed FracTech frac crew on location. Identified myself to company man Malcolm Trahan and Bill Pugh. They are currently performing a zipper frac on the 2H and 4H wells. Wireline is running into this well to perforate stage 23/56. Plug will be set at 16102 with bottom perforations at 16091 and top perforations at 15951. They are monitoring the 5.5 x 9.625 casing annulus. There is currently 190 psi on it while the frac is occuring on the 2h well.
1688183096 2018-10-23 Casing String Witnessed No Violations PAD ADDRESS: 2074 CR 20 DILLONVALE. On the day of my inspection I witnessed Precision had augured a 36 inch diameter hole to 100 feet. 100 feet of 30 inch diameter conductor casing was run. Petroset was onsite with 315sacks of class A cement. Additives include 3% CaCl and .5 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 50% percent excess ran. Cement was displaced with 75 barrels of fresh water. 10 barrels of cement returned to surface. Company man Tony Shepard on location.
1876135862 2019-8-14 0:00: PL No Violations 1.00
1928136960 2018-12-03 Casing String Witnessed No Violations On the day of my inspection I witnessed the mine string cement job. Pioneer 77 had drilled a 24 inch diameter hole to 299 feet. Wyoming casing ran 293.2 feet of 87.5#, j-55 casing, with 4.2 foot stickup. Shoe is at 289 feet. Shoe track is 23 feet long. Cement basket was set at 183 feet. Previous casing set was 30 inch diameter conductor casing to 100 feet. C&J/Otex was on location with 535 sacks of Class A cement. Cement weighed 15.6 ppg with pressurized mudscale. Yield of cement is 1.19. 40% excess ran in open hole. 35 barrels of gel and 15 barrels of water pumped ahead of cement. Cement plug displaced with 81.5 barrels of fresh water. Floats held with .5 barrel back to truck. 5 barrels of cement returned to surface weighing 14 ppg.
22462444 2019-4-22 0:00: CT No Violations 1.00
518493740 2019-4-11 0:00: CT No Violations 2.00
671829410 2018-12-18 0:00 DD No Violations 1.00
727302463 2018-12-12 0:00 CS No Violations 2.00

For data sources see[4]

References