34-081-20778

Well Details

Well ID: 34-081-20778
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Mount Pleasant Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001561
Farm/Lease Name: DARROW E MTP JF
License Status: Producing
License Date: 2018-08-08
Spud Date: 2018-08-14
Spud Drilling Contractor:
Final Drill Date: 2019-01-30
Well Total Depth: 25775.00 ft
Configuration: Horizontal
Latitude: 40.180000
Longitude: -80.820000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-08-08 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:8/8/2018, Expired Date:8/7/2020 12:00:00 PM, Drilling unit acres:353.732, Proposed Well Type:OG, Proposed Well Class:POOL
Record Last Modified 2018-08-21
Construction Permit Expires 2020-08-07

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
10684 25626 0
10684 25626 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2019-04-10 H2O 0 4440 Bbl 229912 Universal Well Services Inc. On the day of my inspection I witnessed a Universal frac crew on location. Company man John Talbot on location. They are currently tied into darrow 1h, club 9h, and this well. Stage 55/90 is being pumped during my inspection. Plug was set at 16296, with bottom perforation at 16284 and top perforation at 16180. Clean total volume pumped was 4440 barrels, 745 barrels of production water, and 24 barrels of 7.5% HCL. 60141 lbs of 100 mesh sand and 169771 lbs of 40/70 sand pumped for a total of 2299

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1135608918 2019-1-11 0:00: CS No Violations 5.00
-131779955 2019-8-27 0:00: PL No Violations 1.00
-1381253952 2019-5-2 0:00:0 CT No Violations 1.00
-1480347168 2019-4-22 0:00: CT No Violations 1.00
-1545685872 2019-5-7 0:00:0 CT No Violations 1.00
-1802589538 2019-4-10 0:00: CT No Violations 1.00
-2053524364 2019-7-16 0:00: CT No Violations 1.00
-397278140 2019-5-16 0:00: CT No Violations 1.00
-460493671 2019-1-14 0:00: DD No Violations 1.00
-596920824 2019-6-25 0:00: CT No Violations 1.00
-600638208 2019-6-10 0:00: CT No Violations 1.00
-999007331 2019-4-17 0:00: CT No Violations 1.00
0397278140 2019-05-16 Completion Testing No Violations On the day of my inspection I witnessed the frac crew is no longer on location. Drill out has not arrived on pad yet. The 13.375x9.625 annular pressure is 300 psi and the 9.625x5.5 annular pressure is 400 psi. No production equipment is onsite. Aboveground storage tank as well as six produced water tanks remain on location. Well connect (pipeline work) is occurring outside of pad.
0460493671 2019-01-14 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Akita 802 had landed their 8.75 inch diameter curve at 10393. They tripping out to pick up 8.5 inch diameter tools. Appalachian is onsite running CBL over the 9.625 inch diameter casing. Current mud weight is 14.9 ppg with no gas or flare.
0705955822 2018-08-15 Casing String Witnessed No Violations On the day of my inspection I witnessed Precision had augured a 36 inch diameter hole to 100 feet. 100 feet of 30 inch diameter conductor casing was run. CJ/Otex was onsite with 315 sacks of class A cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.19. 50 percent excess ran. Mix water tested 76 degrees Fahrenheit, pH of 6.5 and 46 ppm chlorides. Cement was displaced with 72 barrels of fresh water. 13 barrels of cement returned to surface. Drillers hit water at 10 feet.
0999007331 2019-04-17 Completion Testing No Violations On the day of my inspection I witnessed a Universal Frac crew on location tied into the Darrow 1h, Club 9h, and this well. Company man Joe Watt onsite. Stage 81/90 is awaiting frac. Stage 81 plug set at 11746 feet, with bottom perforation at 11735 feet and top perforation at 11594 feet. 9.625x5.5 annular pressure is 510 psi.
1088424868 2019-6-17 0:00: CT No Violations 1.00
1135608918 2019-01-11 Casing String Witnessed No Violations On the day of my inspection I witnessed the two stage intermediate casing cement job. Akita 802 drilled a 12.25 inch diameter open hole to a depth of 8850 feet. Previous casing set and cemented was 13.375 inch diameter surface casing to a depth of 1640 feet. Wyoming casing ran 8853 feet of 9.625 inch diameter casing, hcl-80, 40 lbs/foot, with a 3 foot stick up. Casing was centralized. Shoe track is 89 feet long. DV tool set at 4820 with packer at 4823 feet. Schlumberger was onsite with 508 sacks of class A lead cement and 772 sacks of class A tail cement for the first stage. Lead cement weighed with mudscale at 15.6 ppg and yield of 1.19. Tail cement weighed with mudscale at 15.6 ppg and yield of 1.19. 20 excess ran in open hole. Cement displaced with 664 barrels of oil base mud. 40 barrels of 14.5 ppg spacer pumped ahead of cement. Plug landed and floats held. Packer was inflated and DV tool opened to pump second stage. Schlumberger pumped 40 barrels of 14.5 ppg spacer and 1570 sacks of class A tail cement. Tail cement weighed with mudscale at 15.6 ppg and yield of 1.19. Cement displaced with 365 barrels of oil based mud. 30 excess ran in open hole. 110 barrels of cement returned to surface.
117788316 2019-8-8 0:00:0 PW No Violations 1.00
1252418609 2019-06-05 Completion Testing No Violations On the day of my inspection I was accompanied by Supervisor Eric Conrad. During the inspection we witnessed CWS 7009 snubbing unit onsite. This well has not been opened up for drill out. The 13.375x9.625 annular pressure was 250 psi and the 9.625x5.5 annular pressure is 3300 psi. Company Man John Riffle bled the annular pressure down to 2700 and starting getting fluid and stopepd (6/5/19). On 6/6/19, I spoke with Andy Ingram with Ascent and he said that they were going to run it through a manifold and bleed the pressure off after CWS finishes drill out on the 1H well. He estimated this to occur on saturday, 6/8/19. Andy said that the annular pressure remains at 2700 psi (6/6/19).
1359598560 2019-7-16 0:00: CT No Violations 0.50
1381253952 2019-05-02 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location tied into the 2H and 4H wells. Frac is complete on this well. On 4-19, two kill plugs were set. Bottom plug is at 9950 and top plug at 9800. There were 90 stages pumped on this well. The 13.375x9.625 annular pressure is 300 psi and the 9.625x5.5 annular pressure is 650 psi.
1480347168 2019-04-22 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location tied into the 2H well and 4H wells. Universal finished pumping on this well on 4/19/19 and set two kill plugs. The bottom plug is set at 9950 feet and the top plug is set at 9800 feet. The 13.375x9.625 annular pressure is 300 psi and the 9.625x5.5 annular pressure is 460 psi.
1545685872 2019-05-07 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location. They are tied into Darrow 2H and 4H wells. Frack is completed on this well. The 13.375x9.625 annular pressure was 300 psi and the 9.625x5.5 annular pressure is 500 psi. Twelve 350 barrel steel produced water tanks onsite in their own containment as well as an aboveground storage tank for fresh water.
1546232966 2018-12-31 Casing String Witnessed No Violations On the day of my inspection I witnessed the mine string cement job. Akita 802 drilled a 24 inch diameter open hole to a depth of 314 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 100 feet. Wyoming casing ran 317 feet of 18.625 inch diameter casing, j-55, 87.5 lbs/foot, with 3 foot stick up. Casing was not centralized. Shoe track is 45 feet long. Cement Baskets were set at 240 and 250 feet. Coal encountered at 255-267 feet. Schlumberger was onsite with 657 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 30% excess ran in open hole. Cement displaced with 84 barrels of fresh water. 25 barrels of gel and 110 barrels of water pumped ahead of cement. 40 barrels of cement returned to surface.
1547150215 2019-01-10 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Akita 802 had reached a total depth of 8850 feet on their 12.25 inch diameter hole. Appalachian Well Service is on location running a cement bond log over the 13.375 inch diameter casing. Company man Heath is hoping to start pumping cement on the first stage of the 9.625 inch diameter casing in the early morning hours of tomorrow. Hole is loaded with 13.4 ppg oil base mud. Wyoming has not started running the 40# intermediate casing yet.
1548253788 2019-01-22 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Akita 802 tripping in the wellbore and are approximately 1500 feet off bottom. The 8.5 inch diameter hole has been drilled to a depth of 21747. their current mud weight is 15.4 ppg and there is no flare burning. Estimated total depth is 25820.
1550773761 2019-02-21 Drill / Deepen / Reopen No Violations
1802589538 2019-04-10 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location. Company man John Talbot on location. They are currently tied into darrow 1h, club 9h, and this well. Stage 55/90 is being pumped during my inspection. Plug was set at 16296, with bottom perforation at 16284 and top perforation at 16180. Clean total volume pumped was 4440 barrels, 745 barrels of production water, and 24 barrels of 7.5% HCL. 60141 lbs of 100 mesh sand and 169771 lbs of 40/70 sand pumped for a total of 229912 lbs. Breakdown pressure was 7981 psi, maximum pressure was 11371 psi, average pressure was 11077 psi, maximum rate was 85.8 barrels per minute (BPM) and average rate 85.4 bpm. Initial shut in pressure (ISIP) was 6467 psi and 5 minute ISIP was 6110. Frac gradient was 1.111. 13.375 x 9.625 annular pressure is 285 psi.
1819972351 2019-01-02 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Akita 802 drilled a 17.5 inch diameter open hole to a depth of 1640 feet. Previous casing set and cemented was 18.625 inch diameter mine string casing to a depth of 314 feet. Wyoming casing ran 1643 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot, with 3 foot stick up. Casing was centralized with 14 centralizers. Shoe track is 42 feet long. Schlumberger was onsite with 1216 sacks of class A surfaceset cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 30% excess ran in open hole. Cement displaced with 243 barrels of fresh water. 25 barrels of gel and 15 barrels of water pumped ahead of cement. 73 barrels of cement returned to surface, and floats held with 2 barrels back. Cement returns weighed 13.2 ppg with 40 barrels remaining in displacement.
193633061 2019-7-2 0:00:0 CT No Violations 1.00
705955822 2018-8-15 0:00: CS No Violations 2.00

For data sources see[5]