If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20738 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.3,"lon":-80.75,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Cross Creek Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001515 | |
Farm/Lease Name: NOLAN NE CRC JF | |
License Status: Producing | |
License Date: 2017-12-18 | |
Spud Date: 2017-11-02 | |
Spud Drilling Contractor: | |
Final Drill Date: 2018-03-11 | |
Well Total Depth: 23419.00 ft | |
Configuration: Horizontal | |
Latitude: 40.300000 | |
Longitude: -80.750000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-10-13 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:10/13/2017, Expired Date:10/13/2019 12:00:00 PM, Drilling unit acres:50.067, Proposed Well Type:OG, Proposed Well Class:EOUT |
APP | 2017-12-18 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:12/18/2017, Expired Date:12/18/2018, Drilling unit acres:345.051, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-03-11 | |
Completion Report Received | 2018-10-26 | |
Construction Permit Expires | 2018-12-18 | |
Record Last Modified | 2018-12-20 | |
Correction to Well | 2018-12-21 | UPDATE TAKE/TARGET PER AS-DRILLED |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-10-31 | 9983 | 10124 | 0 |
2018-10-31 | 23179 | 23276 | 0 |
23179 | 23276 | 0 | |
9983 | 10124 | 0 | |
9983 | 10124 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/05/2018 | 06/16/2018 | 9446 | 18,707,700.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 |
LP-70 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
EXCELERATE PS-2 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
SP BREAKER | Halliburton | Breaker | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-2A | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
GEL-1100 | Mountain Supply & Service | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 1.34965 | 2,368,690.0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 88.7927 | 155,835,000.0 | |
SAND-COMMON WHITE - 100 MESH, 3307 LB BAG | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Hydroteated light petroleum distillate | 64742-47-8 | 30 | 0.0164489 | 28869 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000006 | 1 | ||||
Emulsifier | 9002-92-0 | 10 | 0.000220199 | 387 | ||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.00105253 | 1848 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.000294113 | 517 | ||||
Citric acid | 77-92-9 | 60 | 0.00410012 | 7196 | ||||
Ethanol | 64-17-5 | 1 | 0.000210506 | 370 | ||||
Neutralized Polyacrylic Emulsion | Proprietary | 10 | 0.00230914 | 4053 | ||||
Acrylamide acrylate polymer | Proprietary | 30 | 0.0164489 | 28869 | ||||
Ethylene Glycol | 107-21-1 | 60 | 0.0138549 | 24316 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 9.81692 | 17,229,100.0 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.0960995 | 168659 | ||||
Sodium persulfate | 7775-27-1 | 100 | 0.00005567 | 98 | ||||
Polymer Blend | Proprietary | 68 | 0.00149736 | 2628 | ||||
Inorganic salt | Proprietary | 30 | 0.0164489 | 28869 | ||||
Olefins | Proprietary | 5 | 0.000117645 | 210 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00631518 | 11084 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000294113 | 517 | ||||
pH Buffer | 8055-55-8 | 15 | 0.000330299 | 580 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0.00002105 | 37 | ||||
Methanol | 67-56-1 | 60 | 0.000617697 | 1085 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00009804 | 173 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000294113 | 517 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-06-15 | H2O | 15 | 230291 Gal | 233270 | Halliburton | STAGE 76/76
STAGES 2-75 SEE IMAGES |
2018-05-05 | H2O | 15 | 297836 Gal | 216525 | Halliburton | STAGE 1/76
STAGES 2-75 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | 3294416 | 0 | 129 |
2019 | ASCENT RESOURCES UTICA LLC | 2045878 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ASCENT RESOURCES UTICA LLC | Brine | 18038 | 129 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 6417 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-117143715 | 2018-5-16 0:00: | CT | No Violations | 1.00 |
-1437160874 | 2018-8-1 0:00:0 | CT | No Violations | 1.00 |
-1768148584 | 2019-12-10 0:00 | UL | No Violations | 1.00 |
-2018769200 | 2020-4-20 0:00: | PW | No Violations | 1.00 |
-2121202351 | 2018-3-20 0:00: | DD | No Violations | 1.00 |
-591826869 | 2017-11-2 0:00: | CS | No Violations | 3.60 |
-794295216 | 2018-7-26 0:00: | CT | No Violations | 1.00 |
0095287151 | 2018-07-12 | Completion Testing | No Violations | On the day of my inspection I witnessed Halliburton onsite. Stimulation is complete on this well. One stage remains on pad but equipment failure has pad idle. Surface annular pressure is 0 and intermediate annular pressure is 400. Frac stack has been removed from wellhead. |
0117143715 | 2018-05-16 | Completion Testing | No Violations | On the day of my inspection a Halliburton frac crew is rigged up to the 1H, 2H, and 3H wells. 5 out of 76 stages have been fracked on this well. Frac van had to be moved to run coiled tubing in the 1H. Company men said surface anular pressure was 0 psi and intermediate was between 400-500 psi. I did not walk over to check gauges for safety reasons. |
0186905990 | 2018-10-26 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed this contain contains five properly labeled producting wells. Wells do not have tubing in them and are produced on natural reservoir pressure through the 5.5 inch diameter casing. All wells on the pad are producing from each side of the wellhead. Production equipment includes 10 GPUs, 10 sand seperators, 2 500 barrel steel tanks in their own containment, and 1 combustor. Surface annular pressure is 80 and intermediate annular pressure is 267. Site meets requirements of OAC 1509.072A for preliminary restoration. |
0328176073 | 2018-04-17 | Completion Testing | No Violations | On the day of my inspection I found Weir and Cameron on location putting on the tubing heads and valves respectively. The pad has not been stimulated and they are preparing for Halliburton frack crew. |
0591826869 | 2017-11-02 | Casing String Witnessed | No Violations | I am on site today to witness the cementing of 30 inch conductor casing. Precision Drilling drilled a 36 inch diameter hole to a depth of 111 feet and ran 111 feet of 30 inch diameter 118 pound per foot conductor casing. O-Tex Pumping LLC pumped 390 sacks of class H cement, 1.2 yield, 15.6 pounds per gallon with 1.5 percent Calcium Chloride and 0.25 pound per sack cello-flake. O-Tex then displaced with 80 barrels of water, leaving 15 feet of cement in the casing. Good cement returned to surface and remained static. Approximately 20 barrels of cement returned to surface, Ascent left approximately 18 inches of cement in the cellar as a seal. |
0794295216 | 2018-07-26 | Completion Testing | No Violations | On the day of my inspection I witnessed Deep Well Snub 11 onsite. Rig is drilling out on the 2H well. This well has not had frac plugs drilled out yet. Surface annular pressure is 0 and intermediate annular pressure is 400. |
1113158243 | 2018-03-12 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 795 tripping out of the hole. The reached total depth on well at 23419 feet. Casing run is anticipated on Wednesday. |
1437160874 | 2018-08-01 | Completion Testing | No Violations | On the day of my inspection I was accompanied by DOGRM inspector Bob Roush. ID to company man David Rapattoni. Deep Well Snub 11 rig onsite and set up on this well. Last plug, at 22636 has been drilled out and they are tripping out of the hole. Surface annular pressure is 650 and intermediate annular pressure is 650 psi. |
1464519059 | 2018-06-15 | Completion Testing | No Violations | On the day of my inspection I witnessed a halliburton frac crew was onsite. This well has 74 stages of the frac completed and will be starting stage 75 next. Wireline crew is currently retrieving a bridge plug on the 2h well. Surface annular pressure is 0 psi and intermediate pressure is 497 psi. |
186905990 | 2018-10-26 0:00 | PL | No Violations | 1.00 |
2090385524 | 2018-05-22 | Completion Testing | No Violations | On the day of my inspection I found a Halliburton frack crew rigged up on the 1h, 2h, and 3h wells. They are currently on stage 26 of 49 on this well but not fracking until they catch up with stages on 1h and 3h. 9.625 inch diameter annular pressure is 767 psi. Backside pressures on the 1h is 340 psi and pressure on the 3 h is 720 psi. Walk around location revealed no spills. Containment is functioning and pad drains are closed. |
2121202351 | 2018-03-20 | Drill / Deepen / Reopen | No Violations | On the day of my inspection the rig was being taken down and pieces moved to the Dalrymple pad in Jefferson county. |
2124773878 | 2018-07-18 | Completion Testing | No Violations | On the day of my inspection I found Deep Well Snub 11 rig moving onto location. Pad has been fracked and rig will drill out plugs. Surface annular pressure is 0 and intermediate annular pressure is 350. |
328176073 | 2018-4-17 0:00: | CT | No Violations | 1.00 |
95287151 | 2018-7-12 0:00: | CT | No Violations | 1.00 |
For data sources see[10]