34-081-20725

Well Details

Well ID: 34-081-20725
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Smithfield Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001498
Farm/Lease Name: JACK HAMILTON S SMF JF
License Status: Producing
License Date: 2017-08-23
Spud Date: 2017-06-12
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-01-16
Well Total Depth: 18201.00 ft
Configuration: Horizontal
Latitude: 40.250000
Longitude: -80.840000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-04-12 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/12/2017, Expired Date:4/12/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-08-23 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:8/23/2017, Expired Date:8/23/2019 12:00:00 PM, Drilling unit acres:607.785, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-01-16
Correction to Well 2018-04-13 UPDATE TARGET/TAKE POINT PER AS-DRILLED PLAT
Record Last Modified 2019-06-11
Construction Permit Expires 2019-08-23

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/19/2018 05/02/2018 9400 13,213,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Inhibitor E UPP Scale Inhibitor Copolymer of Maleic and Acrylic Acid 52255-49-9 20 0.00881618 11292.4
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.00220404 2823.11
DETA phosphonate 15827-60-8 5 0.00220404 2823.11
HCL Acid (15%) UPP Acidizing Hydrochloric Acid 7647-01-0 15 0.00339642 4350.39
Water Ascent Carrier/Base Fluid Water 7732-18-5 100 86.0864 110,266,000.0
HCL Acid (7.5%) UPP Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0805218 103138
Other Chemical(s) Listed Above See Trade Name(s) List Hydroxyacetic acid 79-14-1 5 0.000285986 366.312
DETA phosphonate 15827-60-8 5 0.00220404 2823.11
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000439279 562.662
Alcohols, ethoxylated 68002-97-1 5 0.00294644 3774.02
Methanol 67-56-1 5 0.00004393 56.266
Ammonium acetate 631-61-8 13 0.00766074 9812.45
Thiourea 62-56-6 1 0.00000879 11.253
Alcohols, ethoxylated 68551-12-2 5 0.00294644 3774.02
Alcohols, ethoxylated 68439-50-9 5 0.00294644 3774.02
Hexamethylene Triamine Penta(Methylene Phosphonic Acid) 34690-00-1 5 0.00220404 2823.11
Formaldehyde 50-00-0 1 0.00000879 11.253
Ethylene glycol 107-21-1 20 0.00114394 1465.25
Unislick ST50 UPP Friction reducer Alcohols, ethoxylated 68439-50-9 5 0.00294644 3774.02
Alcohols, ethoxylated 68002-97-1 5 0.00294644 3774.02
Alcohols, ethoxylated 68551-12-2 5 0.00294644 3774.02
Petroleum distillates, hydrotreated light 64742-47-8 30 0.0176786 22644.1
Ammonium acetate 631-61-8 13 0.00766074 9812.45
Unihib G UPP Acid inhibitor Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000439279 562.662
Thiourea 62-56-6 1 0.00000879 11.253
Formaldehyde 50-00-0 1 0.00000879 11.253
Butyl diglycol 112-34-5 75 0.000658919 843.992
Methanol 67-56-1 5 0.00004393 56.266
I-7L UPP Iron Control Hydroxyacetic acid 79-14-1 5 0.000285986 366.312
Ammonium glycolate 35249-89-9 20 0.00114394 1465.25
Ethylene glycol 107-21-1 20 0.00114394 1465.25
Sand UPP Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 12.695 16,260,700.0
AP Breaker UPP Breaker Ammonium Persulfate 7727-54-0 100 0.00000312 4

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 4404533 0 208
2019 ASCENT RESOURCES UTICA LLC 1270615 0 90

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 20591 208
2019 ASCENT RESOURCES UTICA LLC Brine 1990 90

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1458966343 2018-3-13 0:00: PL No Violations 1.00
-1789794252 2018-1-10 0:00: DD No Violations 1.00
-312898444 2018-6-12 0:00: PL No Violations 1.00
0312898444 2018-06-12 Preliminary Restoration No Violations On the day of my inspection I witnessed that the pad has been brought online. Pad has 5 properly labeled wellheads. Production equipment includes two 500 barrel steel tanks, five GPUs, two line heaters (for the 5H and 7H wells), and seven sand seperators. These wells do not have tubing in them and are produced through the 5.5 inch diameter production casing. Set up appears to be a frac stack with well head on top of it. Flowback operations onsite have a target goal of 19.1 mmcf/day for this well. Surface annular pressure is 253 psi, intermediate annular pressure is 853, and production pressure is 5609 psi. Flowback is finished on this well. Pad is stable and vegetated. Site meets requirements of 1509.072A for preliminary restoration.
1223117645 2019-10-23 0:00 PW No Violations 1.00
1458966343 2018-03-13 Preliminary Restoration No Violations On the day of my inspection I found a Universal frac crew setting up the pad for frac job. Water tanks and containment are onsite, no frac pump. 7-15 frac stacks are on all wells. 2H, 5H, and 7H are the first wells planned for stimulation. Outslopes of pad are vegetated and stable. Site meets requirements of ORC 1509.072A for preliminary restoration.
1497351664 2017-06-12 Casing String Witnessed No Violations I am on site today to witness the cementing of 30 inch conductor casing. Precision Drilling drilled a 36 inch diameter hole to a depth of 100 feet and ran 100 feet of 30 inch diameter 118 pound per foot conductor casing. O-Tex pumped 330 sacks of class A cement, 1.2 yield, 15.6 pounds per gallon with 1.5 percent Calcium Chloride and 0.25 pound per sack flow seal. O-Tex then displaced with 75 barrels of water, leaving 10 feet of cement in the casing. Good cement returned to surface and remained static. Cement was brought to approximately 7 feet below ground surface, leaving a approximately 18 inches of good cement as a floor in the cellar.
1504435450 2017-09-03 Casing String Witnessed No Violations I am on site today to witness the running and cementing of 18.625 inch mine casing. Falcon Drilling rig 26 drilled a 24 inch diameter hole to a depth of 185 feet and set 168 feet of 18.625 inch, 87.5 pound per foot casing. O-Tex pumped 30 barrels of gel then 425 sacks of class A cement, 1.2 yield, 15.6 pound per gallon, 2 percent Calcium Chloride. Two voids were identified from 103 feet to 106 feet and from 130 feet to 135 feet, two baskets were set at 108 feet and 106 feet to avoid the upper void (conductor to 100 feet). O-Tex displaced with 49 barrels of fresh water to land the plug. Cement did not circulate to surface. Falcon ran approximately 100 feet of one inch tremie pipe down the backside of the 18.625 inch casing. O-Tex pumped 5.5 barrels of class A, 1.2 yield, 15.6 pound per gallon cement to set the basket. After 3 failed top out attempts I left the job, they will continue to top out until they get returns to surface. On the fifth top out cement returned to surface. Total top out cement used was 400 sacks.
1504637133 2017-09-05 Casing String Witnessed No Violations I am on site to witness the cementing of 13.375 inch surface casing. Falcon Rig 26 drilled a 17.5 inch diameter hole to a depth of approximately 1400 feet and set 946 feet of 13.375 inch 61 pound per foot casing. O-Tex established circulation with fresh water, pumped 35 barrels of gel ahead, then pumped 1000 sacks of class H cement, 1.2 yield and 15.6 pound per gallon, 1.5 percent calcium chloride, 0.25 pound cello flake per sack, 5.23 gallons per sack water requirement. O-Tex displaced with 138 barrels of fresh water. Approximately 11 barrels of cement returned to surface. The wiper plug landed and pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 1047 psi for 5 minutes.
1789794252 2018-01-10 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 284 drilling an 8.5 inch diameter hole at a depth of 9910. Location had some oil base mud and diesel on containment near the shale shakers and Company man Van Dietrich was asked to have it cleaned up.