If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20664 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.17,"lon":-80.75,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Warren Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001451 | |
Farm/Lease Name: WILMA W WRN JF | |
License Status: Producing | |
License Date: 2017-03-10 | |
Spud Date: 2017-02-03 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2017-10-03 | |
Well Total Depth: 19333.00 ft | |
Configuration: Horizontal | |
Latitude: 40.170000 | |
Longitude: -80.750000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-11-14 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:11/14/2016, Expired Date:11/14/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-03-10 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/10/2017, Expired Date:3/10/2019 12:00:00 PM, Drilling unit acres:459.591, Proposed Well Type:OG, Proposed Well Class:NWC |
Reached Total Depth | 2017-10-03 | |
Completion Report Received | 2018-03-15 | |
Record Last Modified | 2018-08-29 | |
Correction to Well | 2018-08-31 | TAKE TARGET AS-DRILLED |
Construction Permit Expires | 2019-03-10 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-03-20 | 10307 | 10447 | 30 |
2018-03-20 | 19053 | 19156 | 18 |
19053 | 19156 | 18 | |
10307 | 10447 | 30 | |
10307 | 10447 | 30 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/06/2017 | 08/31/2017 | 9966 | 10,908,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
LP-70 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 1.15149 | 1,196,380.0 | |
FR-76 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
Modified thiourea polymer | Proprietary | 30 | 0.000243915 | 254 | ||||
Olefins | Proprietary | 5 | 0.00009757 | 104 | ||||
Neutralized Polyacrylic Emulsion | Proprietary | 10 | 0.0039884 | 4144 | ||||
Ethoxylated fatty acid | Proprietary | 5 | 0.000183355 | 191 | ||||
Inorganic salt | Proprietary | 30 | 0.015336 | 15934 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 11.3435 | 11,785,600.0 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.000243915 | 254 | ||||
Polyacrylate | Proprietary | 30 | 0.00110013 | 1144 | ||||
Sodium chloride | 7647-14-5 | 5 | 0.000183355 | 191 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.015336 | 15934 | ||||
Hydrochloric acid | 7647-01-0 | 7.5 | 0.08081 | 83961 | ||||
Hydroteated light petroleum distillate | 64742-47-8 | 30 | 0.00110013 | 1144 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00621816 | 6461 | ||||
Acetic acid | 64-19-7 | 60 | 0.00294936 | 3065 | ||||
Ethanol | 64-17-5 | 1 | 0.000207272 | 216 | ||||
Ethylene Glycol | 107-21-1 | 60 | 0.0239304 | 24864 | ||||
Methanol | 67-56-1 | 60 | 0.000516848 | 538 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.00491561 | 5108 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00008130 | 85 | ||||
Sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.000119348 | 124 | ||||
Acrylamide acrylate copolymer | Proprietary | 30 | 0.015336 | 15934 | ||||
Ammonium chloride | 12125-02-9 | 5 | 0.000183355 | 191 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.000243915 | 254 | ||||
Fatty acid ester | Proprietary | 5 | 0.000366711 | 382 | ||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.00103636 | 1077 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0.00002073 | 22 | ||||
OptiKleen-WF(TM) | Halliburton | Concentrate | Listed Below | Listed Below | 0 | 0 | 0 | |
MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-COMMON WHITE - 100 MESH, 3307 LB BAG | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
EXCELERATE LX-3 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70, BULK | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 87.4578 | 90,866,600.0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-08-29 | H2O | 8 | 202901 Gal | 231848 | Halliburton | STAGE 51/51
STAGES 2-50 SEE IMAGES |
2017-08-05 | H2O | 8 | 269621 Gal | 234169 | Halliburton | STAGE 1/51
STAGES 2-50 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ASCENT RESOURCES UTICA LLC | 1725963 | 0 | 90 |
2018 | ASCENT RESOURCES UTICA LLC | 4167750 | 0 | 347 |
2019 | ASCENT RESOURCES UTICA LLC | 701590 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ASCENT RESOURCES UTICA LLC | Brine | 13881 | 90 |
2018 | ASCENT RESOURCES UTICA LLC | Brine | 19831 | 347 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 3960 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1159227812 | 2017-5-15 0:00: | DD | No Violations | 1.50 |
-1563975887 | 2018-3-8 0:00:0 | PL | No Violations | 1.00 |
0048041834 | 2017-08-04 | Completion Testing | No Violations | On the date of my inspection I found Halliburton rigging up to begin hydraulic fracturing operations. They plan to zipper frac the wells (3) on this pad. Ascent estimates that they should begin frac operation by morning on 8/5/17. Ascent estimates that operations on the pad should take 3 to 4 weeks. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pipeline company is also preparing the outside of the pad for sales line installation. Traffic on the lease road is very heavy with both operations occurring at the same time. |
0176886518 | 2017-08-17 | Completion Testing | No Violations | On the date of my inspection I found a Halliburton crew rigged up on all three wells on the pad for hydraulic fracturing operations. While I was on site I witnessed Halliburton pump the frac job for stage 22 of 51 and Schlumberger perforate stage 23 for permit 34-081-2-0665. All hazardous materials are within double containment which is in good condition, free of visible punctures or tears. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position. |
1072383382 | 2017-12-08 | Production Wells | No Violations | |
1159227812 | 2017-05-15 | Drill / Deepen / Reopen | No Violations | I am onsite to perform a general site inspection. Nomac drilling rig 77 is currently drilling the production string at approximately 12,600 feet. The pad is in good condition and the vegetation on the berms appears healthy. The pad drain valves are closed and do not appear to have any leakage issues. Containment appears to be in good condition with no apparent holes or tears. All hazardous materials are within containment areas. |
1486134092 | 2017-02-03 | Casing String Witnessed | No Violations | I am on site today to witness the cementing of 30 inch conductor casing. Precision Drilling drilled a 36 inch diameter hole to a depth of 100 feet and ran 100 feet of 30 inch diameter 118 pound per foot conductor casing. Universal Well Service pumped 400 sacks of class A cement, 1.18 yield, 15.6 pounds per gallon with 2 percent Calcium Chloride and 0.75 pound per sack flow seal. I witnessed good cement returns to surface. The returns fell back to approximately 2 feet. Ready mix was used to top out the annulus. Approximately 18 inches of good ready mix was left in the tin horn. |
1487736986 | 2017-02-21 | Casing String Witnessed | No Violations | I am on site to witness the running and cementing of 13.375 inch surface casing. Falcon Rig 26 drilled a 17.5 inch diameter hole to a depth of 1580 feet and set 1560 feet of 13.375 inch 54 pound per foot casing. Allied established circulation with fresh water, pumped 1334 sacks of class H cement, 1.2 yield and 15.6 pound per gallon, 2 percent calcium chloride, 0.5 pound cello flake per sack. Approximately 40 barrels of good quality cement returned to surface. The wiper plug landed and pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 1170 psi for 5 minutes. |
1502816111 | 2017-08-15 | Completion Testing | No Violations | On the date of my inspection I found a Halliburton crew rigged up on all three wells on the pad for hydraulic fracturing operations. While I was on site I witnessed Halliburton pump the frac job for stage 17 of 51 for this well. They pumped approximately 231000 pounds of sand using 4759 barrels of water for this stage. They were able to achieve pumping rates of up to 84 barrels per minute during the job. All hazardous materials are within double containment which is in good condition, free of visible punctures or tears. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position. |
1503666961 | 2017-08-25 | Completion Testing | No Violations | On the date of my inspection I found a Halliburton crew rigged up on all three wells on the pad for hydraulic fracturing operations. While I was on site I witnessed Halliburton pump the frac job for stage 42 of 52 and Schlumberger perforate stage 43 on permit 3408120666. All hazardous materials are within double containment which is in good condition, free of visible punctures or tears. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position. |
1505914952 | 2017-09-20 | Completion Testing | No Violations | On the date of my inspection I found a well maintained access road with an unlocked gate. The pad has 3 wells that have been drilled and stimulated and awaiting flowback, 4 sand separators, 3 gas production units, 3 glycol dehydration units, and 2 shared 500 barrel tanks within a metal dike. The well heads are equipped with christmas tree valves and surrounded by cement barriers. The pad is surrounded by an earthen dike covered by healthy vegetation. Currently SEI Oil Field Services is onsite installing the production equipment. The SEI foreman indicated that there will be a total of 6 sand separators, two for each well. There are 4 frac tanks as well as other equipment associated with operations on the pad currently on site. |
1562081150 | 2019-7-2 0:00:0 | PL | No Violations | 1.00 |
1563975887 | 2018-03-08 | Preliminary Restoration | No Violations | On the day of my inspection I found the Wilma pad to contain three properly identified producing wells. Wells have christmas tree style well heads. Annular pressures are: surface- 0, intermediate- 500, and production 1500. Production equipment includes six sand separators, three gas production units, three glycol dehydration units, and two 500 barrel steel produced water tanks within a metal dike. All production equipment is surrounded by concrete barriers. Site is vegatated and stable. Site meets requirements of ORC 1509.072A for preliminary restoration. |
176886518 | 2017-8-17 0:00: | CT | No Violations | 0.80 |
48041834 | 2017-8-4 0:00:0 | CT | No Violations | 0.70 |
For data sources see[10]