X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-081-20491

Well Details

Well ID: 34-081-20491
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Cross Creek Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID:
Farm/Lease Name: NORTH AMERICAN COAL
License Status: Plugged and Abandoned
License Date: 2018-10-23
Spud Date: 2008-03-17
Spud Drilling Contractor: WARREN DRLG
Final Drill Date: 2008-04-18
Well Total Depth: 7826.00 ft
Configuration: Vertical
Latitude: 40.310000
Longitude: -80.710000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-02-08 Proposed Formations:CLINTON, Issued Date:2/8/2008, Expired Date:2/7/2009 6:00:00 AM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2008-04-18 LOGGERS TD DID NOT TOUCH BOTTOM OF HOLE; WELL WAS PERFED AND FRACED IN CLINTON, SUBSEQUENTLY PLUGGED BACK TO PRODUCE FROM THE MARCELLUS SHALE
Completion Report Received 2008-12-11 LOGGERS TD DID NOT TOUCH BOTTOM OF HOLE; WELL WAS PERFED AND FRACED IN CLINTON, SUBSEQUENTLY PLUGGED BACK TO PRODUCE FROM THE MARCELLUS SHALE
Change of Owner 2009-06-25 Operator changed from 8323, BRAMMER ENGINEERING INC to 8514, MARQUETTE EXPLORATION LLC
Change of Owner 2014-07-24 Operator changed from 8514, HESS OHIO RESOURCES LLC to 9193, AMERICAN ENERGY UTICA LLC
Change of Owner 2015-08-19 Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 9520, ASCENT RESOURCES UTICA LLC
APP 2018-10-23 Proposed Formations:CLINTON, Issued Date:10/23/2018, Expired Date:10/22/2020 12:00:00 PM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2019-03-12 LOGGERS TD DID NOT TOUCH BOTTOM OF HOLE; WELL WAS PERFED AND FRACED IN CLINTON, SUBSEQUENTLY PLUGGED BACK TO PRODUCE FROM THE MARCELLUS SHALE
Record Last Modified 2019-05-13 LOGGERS TD DID NOT TOUCH BOTTOM OF HOLE; WELL WAS PERFED AND FRACED IN CLINTON, SUBSEQUENTLY PLUGGED BACK TO PRODUCE FROM THE MARCELLUS SHALE
Construction Permit Expires 2020-10-22 LOGGERS TD DID NOT TOUCH BOTTOM OF HOLE; WELL WAS PERFED AND FRACED IN CLINTON, SUBSEQUENTLY PLUGGED BACK TO PRODUCE FROM THE MARCELLUS SHALE

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-01-27 5516 5518 8
2009-01-27 5248 5350 16
7700 7768 64
7559 7569 40
5516 5518 8
5248 5350 16
5248 5350 16
2009-01-27 7700 7768 64
2009-01-27 7559 7569 40

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 83 Bbl 0 UPPER PORTION OF CLINTON SAND….CLINTON WAS TREATED, BUT NOT PRODUCED, AS THE WELL WAS PLUGGED BACK TO A DEPTH OF 5442' AND PRODUCED FROM THE MARCELLUS SHALE FROM A PERFORATED INTERVAL OF 5248' TO 5350'.
H2O 0 26217 Bbl 770000
H2O 0 98965 Gal 52000 LOWER PORTION OF CLINTON SAND...CLINTON WAS TREATED, BUT NOT PRODUCED, AS THE WELL WAS PLUGGED BACK TO A DEPTH OF 5442' AND PRODUCED FROM THE MARCELLUS SHALE FROM A PERFORATED INTERVAL OF 5248' TO 5350'.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 BRAMMER ENGINEERING INC 2371.00 0.00 29
2009 BRAMMER ENGINEERING INC 5443.00 225.00 170
2010 HESS OHIO RESOURCES LLC 4023.00 26.00 133
2011 HESS OHIO RESOURCES LLC 6107.00 126.00 270
2012 HESS OHIO RESOURCES LLC 1718.00 28.00 70
2013 HESS OHIO RESOURCES LLC 36.00 0.00 2
2014 ASCENT RESOURCES UTICA LLC 0.00 0.00 0
2015 ASCENT RESOURCES UTICA LLC 0.00 0.00 0
2016 ASCENT RESOURCES UTICA LLC 0.00 0.00 0
2017 ASCENT RESOURCES UTICA LLC 0.00 0.00 0
2018 ASCENT RESOURCES UTICA LLC 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 BRAMMER ENGINEERING INC Brine 1340 29
2009 BRAMMER ENGINEERING INC Brine 1220 170
2010 HESS OHIO RESOURCES LLC Brine 1618 133
2011 HESS OHIO RESOURCES LLC Brine 375 270
2012 HESS OHIO RESOURCES LLC Brine 65 70
2013 HESS OHIO RESOURCES LLC Brine 0 2
2014 ASCENT RESOURCES UTICA LLC Brine 0 0
2015 ASCENT RESOURCES UTICA LLC Brine 0 0
2016 ASCENT RESOURCES UTICA LLC Brine 0 0
2017 ASCENT RESOURCES UTICA LLC Brine 0 0
2018 ASCENT RESOURCES UTICA LLC Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1033572704 2008-3-20 0:00: DD No Violations 3.00
-117545485 2019-3-6 0:00:0 PB No Violations
-1243631244 2019-12-10 0:00 FR No Violations 1.00
-129870605 2018-6-20 0:00: UP No Violations 1.00
-1434333581 2017-6-21 0:00: PW No Violations 1.00
-1496102601 2008-3-26 0:00: DD No Violations 2.50
-1582610260 2008-3-28 0:00: DD No Violations 4.00
-1653433570 2016-9-20 0:00: PW No Violations 0.50
-1681160933 2016-11-30 0:00 PW No Violations 0.70
-1878693729 2019-9-11 0:00: FR No Violations 1.00
-1898132737 2008-9-22 0:00: CT No Violations 1.00
-413730910 2008-3-19 0:00: DD No Violations 2.00
-562228248 2008-7-2 0:00:0 CT No Violations 1.00
-575237499 2017-12-13 0:00 PW No Violations 0.50
-957164313 2010-3-17 0:00: PL No Violations 1.00
0117545485 2019-03-06 Plug / Plug Back No Violations On the day of my inspection I witnessed Nicks Well Plugging on location. Cory Lewis from Weatherford is the consultant. Records indicated that bridge plugs were present in the well however none were found. Bottom plug set in the 4.5 inch diameter casing (11.6#/ft) from 7690 to 7290 using 30 sacks of class A neat cement. Cement weighed 15.6 ppg with mudscale and has a yield of 1.18. Cemex is the cement manufacturer. Bottom plug was displaced through 2.375 inch diameter tubing with 28 barrels of water. A second plug was set from 5568 to 5038 using 40 sacks of the same cement. This plug was displaced with 19 barrels of water. Rig is going to trip tubing and run a CBL to decide where, or if, 4.5 inch diameter casing is free.
0129870605 2018-06-20 UrbanProduction Wells No Violations On the day of my inspection I found this well equiupped with a plunger lift system. Well is not identified but there is an identification sign at the end of the lease road. Lease road is starting to wash out. No production shown since 2013, production records are current. There is no berm or fence around well. I will contact company and see what their plans are for the well. Left voicemail 6/20/18. Well is shut in and has lock out/tag out locks on it preventing it from being opened.
0134921544 2008-08-05 Completion Testing No Violations Inspection revealed that the working pit has not been closed yet . The pit liner is intact and the fluid level is acceptable. No violations at this time.
0413730910 2008-03-19 Drill / Deepen / Reopen No Violations Inspection revealed that Warren Drilling is at 84 and they are having trouble with the wellbore caving in around the drill string. They decided that they have to run more conductor pipe so they are going to weld on more conductor and drive the casing into the wellbore. No violations at this time.
0422862222 2014-06-23 Production Wells No Violations On the date of inspection I accompanied ODNR Inspectors Dylan Pendleton and Pat Shreve to inspect the well. The well was equipped with a gas plunger lift system and two 210 bbl. tanks. At the date of inspection the well was shut-in. Refer to Dylan Pendletons and Pat Shreves reports for further details.
0562228248 2008-07-02 Completion Testing No Violations Inspection revealed that the blow pit has been closed . Inspection of the working pit revealed that the liner is intact and the fluid levels are acceptable. No violations at this time.
0575237499 2017-12-13 Production Wells No Violations On the date of my inspection I found a gravel lease road with an identification sign to a pad without a berm or fence. The wellhead is equipped with a christmas tree valve with a plunger lift system and a motor valve. The well is shut in. Production records end in 2015, while the well has not produced since 2013. There is no production equipment associated with this well.
0691402190 2008-03-25 Drill / Deepen / Reopen No Violations Inspection revealed that Warren Drilling is at 1095 and are milling up steel that they dropped down the wellbore. No violations at this time.
0957164313 2010-03-17 Preliminary Restoration No Violations Inspection revealed that the preliminary restoration can be approved at this time. No violations noted at this time.
0995911435 2008-10-14 Completion Testing No Violations On site to witness the frac job. They fraced the well at a rate of 120 BBLS per minute with 5200 PSI . No violations at this time.
1033572704 2008-03-20 Drill / Deepen / Reopen No Violations Inspection revealed that Warren Drilling is at 140 and they are still having trouble with the wellbore caving in around the drill string. They are going to add more conductor pipe and drive it into the wellbore. No violations at this time.
134921544 2008-8-5 0:00:0 CT No Violations 1.00
1349892390 2012-10-10 Production Wells No Violations My inspection found the access road to well labeled and maintained. There were two water pumps and some water transfer lines along the side of the access road. The site has a guard shack with an on site guard for security. The pad contained four 400 barrel tanks, gas separators, and an assembled well head. The site around the well was also contained with spill prevention liners. There are no violations at this time.
1364494988 2013-03-28 Production Wells No Violations My inspection found the access road to well labeled and maintained. The well is a plunger lift well set atop a hill above the condensate tanks. The well has production casing with 1500psi and tubing with 300psi on it. A Hess rep told me this is due to the tubing being shut it. Normally both should have the same pressure. There are no violations at this time.
1376796088 2019-03-12 Plug / Plug Back No Violations On the day of my inspection I witnessed Nicks well plugging cement the surface plug. Yesterday, 3/11/19 they pumped a 43 sack plug from 4400-4250. The 4.5 inch diameter casing was shot with a jet cutter at 4400 feet but they were unable to pull the casing. The rig pulled 175k on it and got a stretch of 30 inches. CBL shows possible bond 500 feet to surface. They also set a cast iron bridge plug at 1975 feet and perforated with 10 shots. They pumped a 61 sack plug from 1975-1775. Jeff Adams witnessed plug on 3/11. 4.5 inch diameter casing was again perforated at 219 feet. Final plug was set from 219 to surface using 64 sacks of class A neat cement.
1403538714 2014-06-23 Production Wells No Violations Onsite with Inspectors Pat Shreve and Brandon Trigg. Well is set up with a plunger type lift system and a large texas style well head. Well is currently shut in. Production numbers in 2013 are not meeting the production requirements. 2 210bbl tanks are onsite and a vertical seperator. There is not currently a production chart in the meter. A call was put into Hess to discuss the production of this well, but have not talked to a company rep yet.
1434333581 2017-06-21 Production Wells No Violations On the date of my inspection I found a gravel lease road with an identification sign to a pad without a berm or fence. The wellhead is equipped with a christmas tree valve with a plunger lift system and a motor valve. The well is shut in. Production records end in 2015, while the well has not produced since 2013 when it was owned by Hess. There is no tank battery.
1496102601 2008-03-26 Drill / Deepen / Reopen No Violations Inspection revealed that Warren Drilling is at 1721 drilling on air and getting returns. They advised that if everything went right then they should be ready to set surface casing sometime late tonight or early tomorrow morning. No violations at this time.
1551190838 2019-02-25 Plug / Plug Back No Violations
1582610260 2008-03-28 Drill / Deepen / Reopen No Violations On site to test the BOP. BOP test was scheduled for 9:00am this morning. When I arrived on site they still hadnt cut off the conductor or the 8 5/8 casing so they could weld Weatherfords wellhead flange on the surface casing. After getting the flanges installed on the surface casing , the rig crew rigged up the BOP and ran a couple of stands of collars into the hole. Circulated the well for a couple of minutes and shut in BOP. Finally got to test the BOP and the test was recorded on a chart. Tested at 575psi for 30 minutes and the BOP test was approved. On site from 9:00am to 3:45pm.
1646375457 2008-03-24 Drill / Deepen / Reopen No Violations Inspection revealed that Warren Drilling is at 1069. They are still having trouble with the wellbore caving in around the drill string. They are going to run more conductor and they are going fishing for metal that they dropped down the wellbore. No violations at this time.
1653433570 2016-09-20 Production Wells No Violations On the date of my inspection I found a gravel lease road to a pad without a berm or fence. The wellhead is equipped with a christmas tree valve with a plunger lift system and a motor valve. The well is shut in. Production records end in 2014, while the well has not produced since 2013. There is no tank battery.
1681160933 2016-11-30 Production Wells No Violations On the date of my inspection I found a gravel lease road to a pad without a berm or fence. The wellhead is equipped with a christmas tree valve with a plunger lift system and a motor valve. The well is shut in. Production records end in 2014, while the well has not produced since 2013. There is no tank battery. Nothing has changed since my last inspection on 9/20/16.
1735807989 2019-03-11 Plug / Plug Back No Violations
1898132737 2008-09-22 Completion Testing No Violations Inspection revealed that the working pits has been closed and the location graded. They are setting up to frac the well . There are 50 one hundred barrel frac tanks on site at this time. The service rig is not on site yet. No violations at this time.
2131926396 2015-05-05 Production Wells No Violations On the date of inspection I found that the well is still shut in since last inspection. All production equipment has been removed. Production has not been reported since 2013. The well was purchased from Hess and now belongs to American Energy Utica.
422862222 2014-6-23 0:00: PW No Violations 1.00
691402190 2008-3-25 0:00: DD No Violations 2.50
995911435 2008-10-14 0:00 CT No Violations 3.50