34-081-20414

Well Details

Well ID: 34-081-20414
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Wayne Township
Operator Name: SAMURAI OPERATING COMPANY
Well Pad ID:
Farm/Lease Name: BUFFONE JAMES & BETTY JO/BIGLER J& R
License Status: Producing
License Date: 1981-12-23
Spud Date: 1982-02-14
Spud Drilling Contractor: PROFESSIONAL WELL SVC-PWS
Final Drill Date: 1982-02-20
Well Total Depth: 4911.00 ft
Configuration: Vertical
Latitude: 40.380000
Longitude: -80.860000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1981-12-23 597 AMTEX OIL & GAS INC GeoDate 12/23/81
Original Spud 1982-02-14 R.I. & RL 12-24-81, LOG TYPE=NAT. ,SPECTROSCOPY.MTB-updated deepfm
Completed 1982-02-20 R.I. & RL 12-24-81, LOG TYPE=NAT. ,SPECTROSCOPY.MTB-updated deepfm
Reached Total Depth 1982-02-20 R.I. & RL 12-24-81, LOG TYPE=NAT. ,SPECTROSCOPY.MTB-updated deepfm
Completion Report Received 1982-06-04 R.I. & RL 12-24-81, LOG TYPE=NAT. ,SPECTROSCOPY.MTB-updated deepfm
Change of Owner 2001-06-26 Operator changed from 597, AMTEX OIL & GAS INC to 5785, M-J OIL COMPANY INC.
Change of Owner 2008-11-21 Operator changed from 5785, M-J OIL COMPANY INC. to 8453, SAMURAI OPERATING COMPANY
Record Last Modified 2017-02-15 R.I. & RL 12-24-81, LOG TYPE=NAT. ,SPECTROSCOPY.MTB-updated deepfm

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2002-08-30 4783 4788 17
4783 4788 17
4783 4788 17

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
Not Treated 0 0 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 AMTEX OIL & GAS INC 7750.00 12.00 365
1986 AMTEX OIL & GAS INC 2056.00 546.00 0
1987 AMTEX OIL & GAS INC 1346.00 447.00 0
1988 AMTEX OIL & GAS INC 1158.00 278.00 365
1989 AMTEX OIL & GAS INC 971.00 381.00 0
1990 AMTEX OIL & GAS INC 1350.00 467.00 365
1991 AMTEX OIL & GAS INC 1184.00 312.00 365
1992 AMTEX OIL & GAS INC 1049.00 193.00 365
1993 AMTEX OIL & GAS INC 1168.00 275.00 245
1994 AMTEX OIL & GAS INC 1152.00 420.00 365
1995 AMTEX OIL & GAS INC 1137.00 104.00 365
1996 AMTEX OIL & GAS INC 1109.00 0.00 365
1997 AMTEX OIL & GAS INC 1027.00 184.00 365
1998 AMTEX OIL & GAS INC 989.00 123.00 365
1999 AMTEX OIL & GAS INC 964.00 137.00 365
2000 AMTEX OIL & GAS INC 1267.00 157.00 365
2001 M-J OIL COMPANY INC. 2323.00 142.00 179
2002 M-J OIL COMPANY INC. 1285.00 102.00 365
2003 M-J OIL COMPANY INC. 2306.00 145.00 365
2004 AMTEX OIL & GAS INC 2017.00 21.00 365
2005 M-J OIL COMPANY INC. 2143.00 69.00 365
2006 M-J OIL COMPANY INC. 1838.00 0.00 365
2007 M-J OIL COMPANY INC. 1425.00 37.00 365
2008 M-J OIL COMPANY INC. 691.00 36.00 140
2009 SAMURAI OPERATING COMPANY 2246.00 73.00 365
2010 SAMURAI OPERATING COMPANY 1280.00 50.00 365
2011 SAMURAI OPERATING COMPANY 1402.00 42.00 365
2012 SAMURAI OPERATING COMPANY 1752.00 0.00 366
2013 SAMURAI OPERATING COMPANY 1103.00 68.00 365
2014 SAMURAI OPERATING COMPANY 1255.00 13.00 365
2015 SAMURAI OPERATING COMPANY 1258.00 0.00 365
2016 SAMURAI OPERATING COMPANY 464.00 24.00 365
2017 SAMURAI OPERATING COMPANY 274.00 0.00 365
2018 SAMURAI OPERATING COMPANY 60.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 AMTEX OIL & GAS INC Brine 12 365
1986 AMTEX OIL & GAS INC Brine 0 0
1987 AMTEX OIL & GAS INC Brine 0 0
1988 AMTEX OIL & GAS INC Brine 0 365
1989 AMTEX OIL & GAS INC Brine 100 0
1990 AMTEX OIL & GAS INC Brine 60 365
1991 AMTEX OIL & GAS INC Brine 0 365
1992 AMTEX OIL & GAS INC Brine 0 365
1993 AMTEX OIL & GAS INC Brine 60 245
1994 AMTEX OIL & GAS INC Brine 0 365
1995 AMTEX OIL & GAS INC Brine 0 365
1996 AMTEX OIL & GAS INC Brine 0 365
1997 AMTEX OIL & GAS INC Brine 0 365
1998 AMTEX OIL & GAS INC Brine 0 365
1999 AMTEX OIL & GAS INC Brine 0 365
2000 AMTEX OIL & GAS INC Brine 0 365
2001 M-J OIL COMPANY INC. Brine 0 179
2002 M-J OIL COMPANY INC. Brine 95 365
2003 M-J OIL COMPANY INC. Brine 45 365
2004 AMTEX OIL & GAS INC Brine 0 365
2005 M-J OIL COMPANY INC. Brine 0 365
2006 M-J OIL COMPANY INC. Brine 18 365
2007 M-J OIL COMPANY INC. Brine 35 365
2008 M-J OIL COMPANY INC. Brine 35 140
2009 SAMURAI OPERATING COMPANY Brine 0 365
2010 SAMURAI OPERATING COMPANY Brine 0 365
2011 SAMURAI OPERATING COMPANY Brine 58 365
2012 SAMURAI OPERATING COMPANY Brine 58 366
2013 SAMURAI OPERATING COMPANY Brine 91 365
2014 SAMURAI OPERATING COMPANY Brine 0 365
2015 SAMURAI OPERATING COMPANY Brine 0 365
2016 SAMURAI OPERATING COMPANY Brine 0 365
2017 SAMURAI OPERATING COMPANY Brine 0 365
2018 SAMURAI OPERATING COMPANY Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1244639629 2013-5-16 0:00: AM No Violations 1.00
-1312037076 2002-10-31 0:00 PW No Violations 0.50
-1395083434 2017-6-5 0:00:0 PW No Violations 0.80
-168797763 2017-8-28 0:00: PW No Violations 0.50
-1887662915 2014-5-5 0:00:0 PW No Violations 2.50
-195437873 2019-9-9 0:00:0 PW No Violations 1.00
-47393203 2018-5-15 0:00: PW No Violations 1.00
-846015902 2017-10-12 0:00 PW No Violations 0.50
0047393203 2018-05-15 Production Wells No Violations On the day of my inspection I found this well equipped with a walking beam pumping unit. Well is equipped with 4.5 inch diameter casing, 1.9 inch diameter tubing, and rods. Gas can be heard escaping from the polishing rod. Jim Posey was contacted and he was onsite within the hour to investigate and repair. I had him suck water out of containment. Production equipment includes poly tank and horizontal seperator. Water inside containment tested 850 ppm chlorides.
0168797763 2017-08-28 Production Wells No Violations Today I am onsite to test the bottom of the excavated area outside of the production berm. Jim Posey with Samurai Corporation removed the top 8 inches of soil that had been contaminated with brine. I placed soil in a clean container then added some deionized water to create a slurry. After 5 minutes I placed a Quantab into the solution. The water tested for 56 parts per million chlorides. Jim plans to backfill the area with clean dirt. He is still working on a solution for the area inside the berm.
0534833306 2016-09-14 Production Wells No Violations On the date of my inspection I found a tank battery to include two properly identified 100 barrel tanks, a horizontal separator, a drip, and a production meter box with a current chart within an earthen dike. The well is equipped with a pumping unit, rods, 1.5 inch tubing and 4.5 inch casing. The tubing and casing valves are in the open position. The production records are only current through 2014.
0715960882 2007-06-19 Production Wells No Violations Routine inspection revealed no violations at this time .
0846015902 2017-10-12 Production Wells No Violations Today I am onsite to follow up on clean-up efforts related to a release that occurred on 8/22/17. Samurai has placed new gravel within the dike and the newly seeded areas are going healthy grass. A 38.75 barrel poly brine tank has been placed within the dike but has not been plumbed into the system yet. Both 100 barrel tanks have been hauled off site. Clean up efforts for this location are now complete.
0886267916 2013-01-31 Production Wells No Violations The tank battery containing two 100 barrel production tanks and a horizontal separator has had a new SPCC dike built around it. There are no violations at this time.
1244639629 2013-05-16 Administrative Inspection No Violations I was in contact will the pumper for Samurai regarding the 2 compliance notices that were issued for some issues at their wells. This well had a brine filled hole that has currently been pumped out but has not been filled currently but does have a fence surrounding it. A contractor will be onsite today to see how to fill the holes. Signage for the wells has also been ordered and will be installed next week. I will conduct a status check to determine if the wells are brought into compliance.
1312037076 2002-10-31 Production Wells No Violations Routine inspection revealed no violations at this time .
1354829241 2012-12-06 Production Wells No Violations Inspection of the tank battery contained two 100 barrel production tanks and a horizontal separator. Note: the top of the buried cement brine storage tank is broke along the east edge . The tank is not being used at this time . It appears that the tank has not been used for quite sometime . The well has a pumpjack on it and is located in the backyard of several houses away from the tank battery. The well is surrounded by a fence. There are no violations at this time.
1366915472 2013-04-24 Production Wells Violations Noted I was conducting a status check of this well. The pumpjack well is fenced in behind several houses. The tank battery is located on an adjacent road and contains 2 production tanks and a horizontal separator. The well is contained within a dike but there is a hole filled with brine and oil where a former brine vault was placed. The well is also lacking legible signage. The hole needs pumped out and filled in to limit the chance of someone falling in and the well needs proper signage.
1369840952 2013-05-28 Production Wells No Violations I was on location to check the status of some work done to fulfill the requirements of a compliance notice issued for this this well. I was in contact with the Samurai well tender and he stated that the well has been brought into compliance. A new dike surrounding the tank battery has been installed as well as new properly labeled signage. The hole in the tank battery filled with brine has been filled can covered. The well is in full compliance and there are no violations at this time. The compliance notice can be closed out.
1395083434 2017-06-05 Production Wells No Violations On the date of my inspection I found the production equipment to include two properly identified 100 barrel tanks, a horizontal separator, a drip, and a production meter box with an orifice plate and a current chart within an earthen dike. The well is equipped with a pumping unit, rods, 1.5 inch tubing and 4.5 inch casing. A 2.375 inch production line links the tubing and casing. The tubing and casing valves are in the open position. I found gas actively leaking from a 90 degree elbow in the production line coming from the wellhead into the separator. I called Jim Posey with Samurai Corporation who came out to assess the leak while I was on site. He indicated that both compressors for the wells in the area stopped working today so all of the lines have higher than normal pressure. He said that he would fix the gas leak as soon as he could relieve the pressure on the lines. The production records are current.
1503502571 2017-08-23 Production Wells No Violations
1504618909 2017-09-05 Production Wells No Violations Today I am following up on cleanup efforts following a spill from the production tanks for this well. Samurai Corp has steamed the two 100 barrel tanks and removed them from the diked area. They have backfilled the excavated area outside the dike and re-seeded the area. They have started to scrape the surface of the diked area to remove the oil saturated soil and will be taking the soil to a landfill.
1505759393 2017-09-18 Production Wells No Violations Today I am onsite to follow up on clean-up efforts related to a release that occurred on 8/22/17. Samurai has scraped up more of the contaminated soil from within the diked area into a pile. Jim said that he would remove the soil pile this week and take it to a disposal facility. He also said that the two 100 barrel tanks that were steamed and placed nearby would be gone this week as well. Grass has already begun to grow on the area outside that dike that was excavated, backfilled with clean fill, and seeded.
1506343609 2017-09-25 Production Wells No Violations Today I am onsite to check on the progress of cleanup efforts following a spill. Samurai has removed the contaminated soil from within the diked area and has replaced it with lime and new gravel. The two 100 barrel tanks are still onsite waiting to be hauled off. The area outside that dike that was reseeded is now covered with healthy grass. The flowline from the horizontal separator to where the tanks used to be is leaking gas. I left a message for Jim Posey regarding the leak and advised him to either shut in the separator or plug the line.
1695167835 2016-12-09 Production Wells No Violations On the date of my inspection I found a tank battery to include two properly identified 100 barrel tanks, a horizontal separator, a drip, and a production meter box with an orifice plate and a current chart within an earthen dike. The well is equipped with a pumping unit, rods, 1.5 inch tubing and 4.5 inch casing. A 2.375 inch production line links the tubing and casing. The tubing and casing valves are in the open position. The production records are only current through 2014.
1801377072 2006-02-15 Production Wells No Violations Inspection of the tank battery revealed no violations . Didnt inspect the wellhead at this time . Note: the top of the buried cement brine storage tank is broke along the east edge . The tank is not being used at this time . It appears that the tank has not been used for quite sometime . No violations at this time .
1887662915 2014-05-05 Production Wells No Violations I was on location with Inspector Dylan Pendleton to perform a status check of this well. During my inspection I found the tank battery to contain two 100 barrel production tanks and a horizontal separator has had a new dike built around it. A condensate flow line for the well has been dug up near the road and is exposed in the drainage ditch. The landowner performed some landscaping and dug up the ditch and the line. Jim, the well pumper, was on location and I instructed him to rebury the line so that it is no longer sitting exposed in the ditch within the week.
2053059673 2002-10-31 Production Wells No Violations Routine inspection revealed no violations at this time .
534833306 2016-9-14 0:00: PW No Violations 0.50
715960882 2007-6-19 0:00: PW No Violations 0.50
886267916 2013-1-31 0:00: PW No Violations 1.00

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1366915472 US-OH-110811 2013-05-29 General Safety
1366915472 US-OH-110812 2013-05-29 Failure to legibly identify well

For data sources see[9]

References