X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-075-25587

Well Details

Well ID: 34-075-25587
Loading map...
Country: United States
State: Ohio
County: Holmes
Municipality: Walnut Creek Township
Operator Name: BELDEN BRICK CO LLC, THE
Well Pad ID:
Farm/Lease Name: HOCHSTETLER-MAST
License Status: Producing
License Date: 2012-02-27
Spud Date: 2012-03-23
Spud Drilling Contractor: MARIC DRILLING CO.
Final Drill Date: 2012-04-05
Well Total Depth: 6538.00 ft
Configuration: Vertical
Latitude: 40.530000
Longitude: -81.700000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-02-27 Proposed Formations:UTICA THRU ROSE RUN, Issued Date:2/27/2012, Expired Date:2/26/2014 12:00:00 PM, Drilling unit acres:97.78, Proposed Well Type:OG, Proposed Well Class:EOUT
Plugged Back 2012-04-05 PB TO CLINTON SS.
Reached Total Depth 2012-04-05 PB TO CLINTON SS.
Completion Report Received 2013-03-14 PB TO CLINTON SS.
Construction Permit Expires 2014-02-26 PB TO CLINTON SS.
Record Last Modified 2017-02-15 PB TO CLINTON SS.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-03-15 4094 4174 12
4094 4174 12
4094 4174 12

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-07-10 H2O 0 71371 Gal 40000 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 BELDEN BRICK CO LLC, THE 280.00 0.00 121
2013 BELDEN BRICK CO LLC, THE 486.00 0.00 306
2014 BELDEN BRICK CO LLC, THE 421.00 0.00 306
2015 BELDEN BRICK CO LLC, THE 732.00 0.00 306
2016 BELDEN BRICK CO LLC, THE 463.00 0.00 306
2017 BELDEN BRICK CO LLC, THE 577.00 0.00 365
2018 BELDEN BRICK CO LLC, THE 774.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 BELDEN BRICK CO LLC, THE Brine 0 121
2013 BELDEN BRICK CO LLC, THE Brine 64 306
2014 BELDEN BRICK CO LLC, THE Brine 89 306
2015 BELDEN BRICK CO LLC, THE Brine 136 306
2016 BELDEN BRICK CO LLC, THE Brine 0 306
2017 BELDEN BRICK CO LLC, THE Brine 35 365
2018 BELDEN BRICK CO LLC, THE Brine 27 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1011445580 2012-8-16 0:00: PL No Violations
-1131455215 2012-3-26 0:00: DD No Violations
-1338919666 2012-4-3 0:00:0 DD No Violations
-1345223610 2015-12-4 0:00: PW No Violations
-1562397817 2012-3-14 0:00: DD No Violations
-1565543399 2012-3-25 0:00: DD No Violations
-1895123038 2012-9-17 0:00: PL No Violations
-1988756690 2019-4-30 0:00: PW No Violations 0.30
-2110581464 2013-4-18 0:00: PL No Violations
-364474151 2014-12-3 0:00: PW No Violations
-512450809 2012-4-2 0:00:0 DD No Violations
-929795623 2012-7-26 0:00: PL No Violations
-984470435 2012-11-19 0:00 PL No Violations
0090535216 2012-04-04 Drill / Deepen / Reopen No Violations Drilling ahead at 6275, in the Black River Formation.
0153185692 2014-04-03 Production Wells No Violations This is a producing plunger lift well. There were no problems noted at the time of the inspection.
0364474151 2014-12-03 Production Wells No Violations This is a producing plunger lift well. There were no problems noted at the time of the inspection.
0512450809 2012-04-02 Drill / Deepen / Reopen No Violations Drilling ahead at 5425 and soaping.
0579177756 2013-06-11 Preliminary Restoration No Violations All preliminary restoration has been completed. The plunger lift well is producing and there were no problems noted at the time of the inspection.
0676320776 2012-08-03 Preliminary Restoration No Violations Reclamation continues. They are also getting the tank battery ready for the separator and tank.
0838709536 2012-03-06 Drill / Deepen / Reopen No Violations The lease road has been installed. The location is to be started on Thursday 3/8/12.
0929795623 2012-07-26 Preliminary Restoration No Violations The location has been returned to the original contour and the top soil is being spread.
0984470435 2012-11-19 Preliminary Restoration No Violations Back to final grade, seeded and there is good growth. PR passed.
1011445580 2012-08-16 Preliminary Restoration No Violations The pipeline contractor is installing the gas sales line.
1071171615 2012-03-16 Drill / Deepen / Reopen No Violations Cutting Location.
1125156045 2019-10-2 0:00: PW No Violations 0.30
1131455215 2012-03-26 Drill / Deepen / Reopen No Violations 1450 and drilling ahead and dusting.
1181006135 2012-03-22 Drill / Deepen / Reopen No Violations Reserve pit dug and location finished.
1273015939 2020-4-10 0:00: PW No Violations 0.30
1331228667 2012-03-05 Drill / Deepen / Reopen No Violations The lease road has been put in, but the location has not yet been built.
1331637491 2012-03-12 Drill / Deepen / Reopen No Violations I checked the erosion control put in to protect the creek. Location to be cut on 3/13/12 weather permitting.
1332240108 2012-03-19 Drill / Deepen / Reopen No Violations
1333555833 2012-03-28 Drill / Deepen / Reopen No Violations Drilling ahead at 3275
1334254452 2012-04-05 Drill / Deepen / Reopen No Violations Reached total depth of 6538. Deemed a dry hole. Belden Brick received a spacing variance from Columbus to plug back to the Clinton Sand. Petroset spotted cement plugs from 6506-6206 and from 5845 to 5695. Ran 100 jts of 4-1/2 10.5# casing to 4376 and set at 4386.
1338919666 2012-04-03 Drill / Deepen / Reopen No Violations Drilling ahead at 5771 and soaping.
1341843429 2012-07-09 Completion Testing No Violations Appalachian Well Surveys is on location to run a cement bond log and to perforate. Total depth per the logger is 4288. They ran a cement bond log and found the cement top at 3750. There is a good bond from total depth to the cement top. They perforated in 4 runs from 4090 to 4174 with 12 shots.
1342003223 2012-07-10 Completion Testing No Violations Producers Service is on location to fracture this well using 1800 barrels of water and 40,000 pounds of sand. See the stimulation report for details.
1342089321 2012-07-11 Completion Testing No Violations They are sand pumping the well this morning and will start swabbing this afternoon.
1342180380 2012-07-12 Completion Testing No Violations Swabbing today. Swabbed to the perfs and shut in for the night.
1342434867 2012-07-13 Completion Testing No Violations The well had 770 pounds of pressure on it this morning. They are running tubing in the well.
1342526006 2012-07-16 Completion Testing No Violations There was 1000 pounds on the casing and 60 pounds on the tubing. Swabbed the tubing, rigged down and moved off. The tubing is set at 4074.
1343126530 2012-07-23 Preliminary Restoration No Violations The working pit is closed. They are reclaiming the location.
1343214157 2012-07-24 Preliminary Restoration No Violations They are continuing to reclaim this location.
1343731475 2012-07-30 Preliminary Restoration No Violations They are putting in the dike for the separator and tank.
1345223610 2015-12-04 Production Wells No Violations This is a producing plunger lift well. There were no problelms noted at the time of the inspection.
1347291458 2016-11-29 Production Wells No Violations This is a producing plunger lift well. There were no problems noted at the time of the inspection.
1449829043 2012-03-23 Drill / Deepen / Reopen No Violations Moved on and rigged up.
1457152335 2012-03-29 Drill / Deepen / Reopen No Violations Drilling ahead at 3965
153185692 2014-4-3 0:00:0 PW No Violations
1562397817 2012-03-14 Drill / Deepen / Reopen No Violations Started cutting location.
1565543399 2012-03-25 Drill / Deepen / Reopen No Violations Cemented surface this date. 15 bbls of cement returned to surface. See Surface ticket for details.
1589306017 2012-03-08 Drill / Deepen / Reopen No Violations Dozer has been moved on but no activity due to heavy rain.
1610840880 2012-03-30 Drill / Deepen / Reopen No Violations drilling ahead at 4500 and soaping.
1712141100 2012-08-20 Preliminary Restoration No Violations The sales line is in and the well and production unit are plumbed in. Tank to arrive tomorrrow.
1745143594 2012-04-16 Drill / Deepen / Reopen No Violations The reserve pit is completely reclaimed. The working pit is empty and will be closed after the well is fractured.
1823173496 2012-03-24 Drill / Deepen / Reopen No Violations Spud.
1895123038 2012-09-17 Preliminary Restoration No Violations Graded and limed.
1984970159 2012-05-23 Preliminary Restoration No Violations Completion is set for 6/6/12. The working pit is empty.
1988756690 2019-04-30 Production Wells No Violations On the day of my inspection I found 8 5/8-inch diameter casing, a 4 1/2-inch diameter casing, and 1 1/2-inch diameter tubing. The well is well is operated by a plunger lift system. The production equipment is made up of one 140 bbl. steel tank, a horizontal separator, and a recording gauge. The tank is properly identified, and the production reporting is up to date.
2110581464 2013-04-18 Preliminary Restoration No Violations All fences are back in and there is good growth over 95% of the location. One area has eroded and the operator will be contacted to make repairs.
579177756 2013-6-11 0:00: PL No Violations
676320776 2012-8-3 0:00:0 PL No Violations
838709536 2012-3-6 0:00:0 DD No Violations
90535216 2012-4-4 0:00:0 DD No Violations

For data sources see[9]

References