X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21583

Well Details

Well ID: 34-067-21583
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Athens Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001606
Farm/Lease Name: VICTORIA E ATH HR
License Status: Producing
License Date: 2019-01-18
Spud Date: 2019-01-25
Spud Drilling Contractor:
Final Drill Date: 2019-06-11
Well Total Depth: 21295.00 ft
Configuration: Horizontal
Latitude: 40.200000
Longitude: -81.070000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2019-01-18 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:1/18/2019, Expired Date:1/17/2021 12:00:00 PM, Drilling unit acres:582.953, Proposed Well Type:OG, Proposed Well Class:POOL
Record Last Modified 2019-01-25
Construction Permit Expires 2021-01-17

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
21170 21118 0
9505 9635 0
9505 9635 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1036862099 2019-8-20 0:00: CT No Violations 1.50
-1059159533 2019-6-4 0:00:0 DD No Violations 1.00
-1388043166 2019-9-24 0:00: CT No Violations 1.00
-450870413 2019-9-5 0:00:0 CT No Violations 1.50
-86974269 2019-8-28 0:00: CT No Violations 1.20
1059159533 2019-06-04 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Akita 802 on location. 9.625 inch diameter casing previously set by Falcon rig at 7767 feet. 803 has drilled out the DV tool at 4105 feet with an 8.5 inch diameter bit. They are currently tripping in at 6566 feet and float collar is at 7679 feet. Mud weight is 10.5 ppg.
1454020905 2019-8-20 0:00: CT No Violations 1.00
1551669260 2019-03-03 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Falcon 39 drilled a 17.5 inch diameter open hole to a depth of 1381 feet. Previous casing set and cemented was 24 inch diameter conductor casing to a depth of 100 feet ground level. Wyoming casing ran 1374 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot, with 3 foot stick up. Casing was centralized with 11 centralizers. Shoe track is 46 feet long. Schlumberger was onsite with 1384 sacks of class A cement. Cement weighed with mudscale at 15.6 ppg and yield of 1.22. 50% excess ran in open hole. Cement displaced with 205 barrels of fresh water. 25 barrels of gel pumped ahead of cement. 120 barrels of cement returned to surface and floats held with 1 barrel back. All depths are based on rig KB. Rig KB is 14 feet.
1564261806 2019-11-7 0:00: PL No Violations 1.00
1663088752 2019-8-16 0:00: CT No Violations 1.00
614089501 2019-6-10 0:00: CS No Violations 1.00

For data sources see[4]

References