X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21557

Well Details

Well ID: 34-067-21557
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Monroe Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001416
Farm/Lease Name: OUR LAND CO 20-13-6
License Status: Producing
License Date: 2018-08-31
Spud Date: 2018-09-28
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-11-02
Well Total Depth: 15396.00 ft
Configuration: Horizontal
Latitude: 40.400000
Longitude: -81.170000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-08-31 Proposed Formations:POINT PLEASANT, Issued Date:8/31/2018, Expired Date:8/30/2020 12:00:00 PM, Drilling unit acres:592.83, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-11-02
Record Last Modified 2018-12-18
Construction Permit Expires 2020-08-30

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
14791 14884 0
7782 7902 0
7782 7902 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/14/2019 03/28/2019 7692 20,780,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 ProFE 105 ProFrac Iron Control Citric Acid 77-92-9 100 0.00226816 4542.35
BIOC11139A Nalco Biocide Ethanol 64-17-5 5 0.000860345 1722.98
Glutaraldehyde 111-30-8 10 0.00172069 3445.95
Benzyl-(C12-C16 Alkyl)-Dimethyl-Ammonium Chloride 68424-85-1 30 0.00516207 10337.9
Hydrochloric Acid (7.5%) FSTI Acidizing Water 7732-18-5 85 0.528908 1,059,220.0
Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 37 0.23023 461073
ProHib 100 ProFrac Acid Inhibitor 2-Propyn-1-ol compound w/ methyloxirane 38172-91-7 15 0.00028352 567.794
ProCheck 100 Nalco Scale Inhibitor Sodium Phosphate 7601-54-9 5 0.000950274 1903.07
Ethlene Glycol 107-21-1 5 0.000950274 1903.07
Amine Triphosphate PROPRIETARY 30 0.00570164 11418.4
Water Range Resources Carrier/Base Fluid Water 7732-18-5 100 86.5893 173,409,000.0
Sand (100 Mesh Proppant) ProFrac Proppant Silica Substrate 14808-60-7 100 4.78307 9,578,850.0
Sand (40/70 White Proppant) ProFrac Proppant Silica Substrate 14808-60-7 100 7.91906 15,859,200.0
ProSlick 710 Nalco Friction Reducer Substituted alkylamine PROPRIETARY 1 0.000459141 919.502
Hydrotreated Light Petroleum Disitilate 64742-47-8 30 0.0137742 27585.1
Inorganic salt PROPRIETARY 10 0.00459141 9195.02
Oxyalkylated alcohol PROPRIETARY 5 0.0022957 4597.51
Other Chemical(s) Listed Above See Trade Name(s) List Ethlene Glycol 107-21-1 5 0.000950274 1903.07
Sodium Phosphate 7601-54-9 5 0.000950274 1903.07
Oxyalkylated alcohol PROPRIETARY 5 0.0022957 4597.51
Water 7732-18-5 85 0.528908 1,059,220.0
Inorganic salt PROPRIETARY 10 0.00459141 9195.02
Ethanol 64-17-5 5 0.000860345 1722.98
Substituted alkylamine PROPRIETARY 1 0.000459141 919.502
Glutaraldehyde 111-30-8 10 0.00172069 3445.95

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1021280150 2019-4-8 0:00:0 CT No Violations 1.00
-1506602641 2019-8-30 0:00: PL No Violations 1.00
0471448050 2018-10-26 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Patteron 580 drilled a 17.5 inch diameter open hole to a depth of 632 feet. Previous casing set and cemented was 20 inch diameter conductor casing to a depth of 120 feet. Wyoming casing ran 617 feet of 13.375 inch diameter casing, j-55, 54.5 lbs/foot w 5 foot stick up. Casing was centralized. Shoe track is 43 feet long. Halliburton was onsite with 625 sacks of class H neocem cement. Cement weighed with mudscale at 17 ppg and yield of 1.07. 50% excess ran in open hole. Cement displaced with 89 barrels of fresh water. 30 barrels of gel pumped ahead of cement. 31 barrels of cement returned to surface, and floats held with 1 barrel back.
1021280150 2019-04-08 Completion Testing No Violations On the day of my inspection I met with company men Willard Scott, Wallace Bossert, and Bub Ruckert. Stone rig #15 is onsite. They have finished drilling out the 49 frac plugs in this well and are preparing to run 2.375 inch diameter production tubing to approximately 8100 feet. Annular pressures on the 13.375 x 9.625 and the 9.625 x 5.5 are both zero psi.
471448050 2018-10-26 0:00 CS No Violations 4.00

For data sources see[5]

References