If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21551 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.41,"lon":-80.92,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: German Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001533 | |
Farm/Lease Name: PICKENS 21-11-4 | |
License Status: Producing | |
License Date: 2018-03-29 | |
Spud Date: 2018-04-19 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-05-25 | |
Well Total Depth: 23312.00 ft | |
Configuration: Horizontal | |
Latitude: 40.410000 | |
Longitude: -80.920000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-03-29 | Proposed Formations:POINT PLEASANT, Issued Date:3/29/2018, Expired Date:3/28/2020 12:00:00 PM, Drilling unit acres:726.91, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-05-25 | |
Correction to Well | 2018-08-24 | TAKE TARGET AS-DRILLED |
Correction to Well | 2018-11-09 | TAKE POINT PER AS-DRILLED PLAT |
Completion Report Received | 2018-11-14 | |
Record Last Modified | 2018-11-19 | |
Construction Permit Expires | 2020-03-28 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-11-19 | 9449 | 9608 | 0 |
2018-11-19 | 23072 | 23172 | 0 |
23072 | 23172 | 0 | |
9449 | 9608 | 0 | |
9449 | 9608 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/11/2018 | 08/07/2018 | 8587.1 | 17,135,100.0 | 1,265,610.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | SC-30 | FOUNTAIN QUAIL | Scale Inhibitor | Sodium Hydroxide | 1310-73-2 | 0.02 | 0 | 0 |
HAI-OS | HALLIBURTON | Corrosion Inhibitor | Methanol (Methyl Alcohol) | 000067-56-1 | 0.6 | 0.00001000 | 0 | |
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 0.1 | 0 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 1 | 0.75083 | 0 | |
Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 0.01 | 0 | 0 | |
7.5%HCL HYDROCHLORIC ACID | HALLIBURTON | Acid | Water | 007732-18-5 | 0.93 | 0.00019 | 0 | |
Hydrochloric Acid | 007647-01-0 | 0.08 | 0.00002000 | 0 | ||||
OptiKleen-WF | HALLIBURTON | Breaker | Sodium perborate tetrahydrate | 010486-00-7 | 1 | 0.00002000 | 0 | |
Northern White Sand | HALLIBURTON | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 1 | 0.13414 | 0 | |
FDP-S1320-18, FE-2A, FightR EC-1, HAI-OS, OptiKleen-WF | HALLIBURTON | Breaker, Corrosion Inhibitor, Friction Reducer, Iron Control Agent | Enter Chemical Name... | Not Assigned | 0 | 0 | 0 | |
Non-MSDS Components Not Provided by Supplier | Not Assigned | 0 | 0 | 0 | ||||
Not Provided | Not Assigned | 1 | 0.00052 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 1 | 0.10163 | 0 | |
15% HCl Acid | HALLIBURTON | Acid | Hydrochloric Acid | 7647-01-0 | 0.3 | 0.0037 | 0 | |
FE-2A | HALLIBURTON | Iron Control Agent | Citric Acid | 000077-92-9 | 0.6 | 0.00004000 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-07-11 | H2O | 15 | 192916 Gal | 195200 | Halliburton | STAGE 1/70 |
2018-08-01 | H2O | 0 | 0 | 330000 | Halliburton | On the day of my inspection I was accompanied by DOGRM inspector Bob Roush. ID to company men Jacob Peiffley and Matt Wood. Halliburton frac crew is onsite and stimulating this well. Surface and intermediate annular pressures are 0 and 136 psi respectively. Stage 52/70 plug is set at 13182, bottom perforation at 13163, and top perforation at 13004. Perforated with 5 guns, 6 shots, on 40 foot spacing. This had a breakdown pressure of 6262 at 15 bpm. 330000 lbs of sand was pumped. 100000 lbs of 1 |
2018-08-06 | H2O | 15 | 210768 Gal | 305308 | Halliburton | STAGE 70/70
STAGES 2-69 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | CHESAPEAKE EXPLORATION LLC | 2613963 | 0 | 92 |
2019 | CHESAPEAKE EXPLORATION LLC | 1876487 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 29222 | 92 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 7534 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1091390537 | 2020-2-26 0:00: | PW | No Violations | 1.00 |
-1965185705 | 2018-5-16 0:00: | DD | No Violations | 1.00 |
-410312858 | 2018-7-26 0:00: | CT | No Violations | 1.00 |
-635913558 | 2018-5-21 0:00: | DD | No Violations | 1.00 |
-974872258 | 2018-6-20 0:00: | CT | No Violations | 1.00 |
0410312858 | 2018-07-26 | Completion Testing | No Violations | On the day of my inspection I witnessed a Halliburton frac crew was on location. No stimulation was occurring during this inspection as there was not sufficient water onsite for the job. Surface and intermediate annular pressures are both zero at this time. Stage 35 is next stage for stimulation on this well was perforated from 16520-16361. Plug set at 16539. 5 guns with 6 shots on 40 spacing used to perforate. |
0486463324 | 2018-08-09 | Completion Testing | No Violations | On the day of my inspection I witnessed that Halliburton has moved off of location. An aboveground storage tank and other miscellaneous tank remain. Badger Daylighting is on location cleaning tanks. Surface and intermediate annular pressures are zero. Wells have been stimulated but not had frac plugs drilled out. |
0591523099 | 2018-08-01 | Completion Testing | No Violations | On the day of my inspection I was accompanied by DOGRM inspector Bob Roush. ID to company men Jacob Peiffley and Matt Wood. Halliburton frac crew is onsite and stimulating this well. Surface and intermediate annular pressures are 0 and 136 psi respectively. Stage 52/70 plug is set at 13182, bottom perforation at 13163, and top perforation at 13004. Perforated with 5 guns, 6 shots, on 40 foot spacing. This had a breakdown pressure of 6262 at 15 bpm. 330000 lbs of sand was pumped. 100000 lbs of 100 mesh and 230000 lbs of 40/70 mesh. ISIP 5257, average rate 83 bpm, average pressure 9157. |
0635913558 | 2018-05-21 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 571 drilling their 8.5 inch diameter lateral section at 14003 feet. Intermittent flare burning during my inspection. Last well on pad. Walked around location and containment is functional. Outslopes of pad are stable and vegetated. |
0974872258 | 2018-06-20 | Completion Testing | No Violations | On the day of my inspection I found this pad contained 3 unlabeled wells that have been drilled and not stimulated. Wells do not have well heads or frac stacks installed yet, only night caps. Production equipment includes three 400 barrel steel tanks inside steel containment, three sand seperators, and four GPUs (two are mislabeled as schiappa trust). Pad is vegetated and stable. |
1089727358 | 2018-07-13 | Completion Testing | No Violations | On the day of my inspection I witnessed Halliburton frac crew on location. Surface annular pressure is 0 and intermediate annular pressure is 150. Stage 5 has been stimulated on this well. Wireline is coming out of the wellbore after shooting perforations from 22445 to 22286. Plug is at 24464. Perforated with 5 guns with 6 shots each on 40 foot spacing. |
1794101108 | 2018-12-31 | Preliminary Restoration | No Violations | On the day of my inspection I found this pad to contain 3 properly labeling producing wellheads. This well is producing out of the 5.5 inch diameter production casing using natural reservoir pressure, from both sides of the wellhead. Production equipment includes 6 GPUs, 6 sand seperators, 6 line heaters (not plumbed), and 3 400 barrel steel tanks in their own containment. Surface annular pressure is 0 intermediate annular pressure is 150. Site meets requirements of 1509.072A for preliminary restoration. |
1852502675 | 2018-07-18 | Completion Testing | No Violations | On the day of my inspection I witnessed Halliburton frac crew on location. Wireline being ran in this well to perforate for stage 17. Plug is at 20094, bottom perforation is at 20075, and top perforation is at 19916. 5 guns with 6 shots each are used to perforate on 40 foot spacing. Surface annular pressure is 0 and the intermediate annular pressure is 0. |
1965185705 | 2018-05-16 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 571 was tripping back into the well with a new bit. Hole is drilled to 7264 feet. Wal around location revealed no issues with containment. |
2018241304 | 2018-08-20 | Completion Testing | No Violations | On the day of my inspection I witnessed Stone Rig 15 on location. ID to company man Wallace Bossert. Rig was stood up over well during my time onsite but they did not start into the well while I was onsite. Surface and annular pressures are zero and 100 psi respectively. There are 72 frac stages on this well. Asked company man to clean up along the eastern berm on the inside of pad. There is orange stained limestone in places along the berm. |
338770658 | 2019-9-20 0:00: | PW | No Violations | 1.00 |
486463324 | 2018-8-9 0:00:0 | CT | No Violations | 1.00 |
591523099 | 2018-8-1 0:00:0 | CT | No Violations | 1.00 |
For data sources see[10]