X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21547

Well Details

Well ID: 34-067-21547
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Nottingham Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001548
Farm/Lease Name: RH SPARGER W NTG HR
License Status: Producing
License Date: 2018-03-22
Spud Date:
Spud Drilling Contractor:
Final Drill Date: 2018-09-19
Well Total Depth: 22126.00 ft
Configuration: Horizontal
Latitude: 40.250000
Longitude: -81.130000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-03-22 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/22/2018, Expired Date:3/21/2020 12:00:00 PM, Drilling unit acres:550.02, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2018-04-12
Reached Total Depth 2018-09-19
Correction to Well 2018-12-21 UPDATE TAKE/TARGET
Record Last Modified 2019-06-11
Construction Permit Expires 2020-03-21

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
21841 21947 0
8255 8386 0
8255 8386 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/01/2018 12/27/2018 7935 21,351,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Unihib G UPP Acid inhibitor Thiourea 62-56-6 1 0.00000743 15.056
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000371427 752.802
Formaldehyde 50-00-0 1 0.00000743 15.056
Methanol 67-56-1 5 0.00003714 75.28
Butyl diglycol 112-34-5 75 0.000557141 1129.2
Other Chemical(s) Listed Above See Trade Name(s) List Thiourea 62-56-6 1 0.00000743 15.056
Ethylene glycol 107-21-1 40 0.0110999 22497.1
Polyethylene glycol 7732-18-5 50 0.00453816 9197.86
Water 7732-18-5 55 0.0311045 63042
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00169661 3438.65
Methanol 67-56-1 5 0.00003714 75.28
Formaldehyde 50-00-0 1 0.00000743 15.056
Polyoxyethylene Sorbitan Monoleate 9005-65-6 1 0.000565536 1146.22
Alcohols, C10-16, ethoxylated 68002-97-1 50 0.000371427 752.802
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0141384 28655.4
Water 7732-18-5 44.3 0.00402081 8149.3
Hydroxyacetic acid 79-14-1 5 0.000239705 485.829
Oleic Acid Diethanolamide 93-83-4 3 0.00169661 3438.65
Ammonium Chloride 12125-02-9 2 0.00113107 2292.44
Ethylene glycol 107-21-1 20 0.000958819 1943.32
Sodium Chloride 7647-14-5 15 0.00848304 17193.3
HCL Acid (7.5%) UPP Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0695416 140946
FR-11 UPP Friction reducer Water 7732-18-5 55 0.0311045 63042
Oleic Acid Diethanolamide 93-83-4 3 0.00169661 3438.65
Alcohol Ethoxylate Surfactants 68551-12-2 3 0.00169661 3438.65
Polyoxyethylene Sorbitan Monoleate 9005-65-6 1 0.000565536 1146.22
Hydrotreated Petroleum Distillate 64742-47-8 25 0.0141384 28655.4
CHEMPLEX-Polymer_00019 Trade Secret 25 0.0141384 28655.4
Sodium Chloride 7647-14-5 15 0.00848304 17193.3
Ammonium Chloride 12125-02-9 2 0.00113107 2292.44
K-Bac 1005 UPP Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 5.8 0.000522796 1059.59
Polyethylene glycol 7732-18-5 50 0.00453816 9197.86
Water 7732-18-5 44.3 0.00402081 8149.3
I-7L UPP Iron Control Ammonium glycolate 35249-89-9 20 0.000958819 1943.32
Ethylene glycol 107-21-1 20 0.000958819 1943.32
Hydroxyacetic acid 79-14-1 5 0.000239705 485.829
Water Ascent Carrier/Base Fluid Water 7732-18-5 100 87.9133 178,181,000.0
Scale Hib PE-18 UPP Scale Inhibitor Ethylene glycol 107-21-1 40 0.0110999 22497.1
Proprietary Scale Inhibitor Proprietary 30 0.00832492 16872.8
Sand UPP Proppant Crystalline Silica in the form of Quartz 14808-60-7 99.9 11.0495 22,395,000.0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2019 ASCENT RESOURCES UTICA LLC 104200 20417 33

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2019 ASCENT RESOURCES UTICA LLC Brine 4705 33

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1163901235 2018-11-16 0:00 CT No Violations 1.00
-212533388 2020-1-28 0:00: PL No Violations 1.00
-25361349 2018-9-11 0:00: DD No Violations 1.00
-413623402 2018-12-4 0:00: CT No Violations 1.00
-79743129 2018-9-5 0:00:0 CS No Violations 1.00
0025361349 2018-09-11 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Xtreme 803 has drilled an 8.5 inch diameter hole to 12605 feet. They are tripping out of the hole for MWD failure. Rig drilled an 8.75 inch diameter hole to 11539 feet and then switched to 8.5 inch diameter. Kick off point was 7238 and landing point was 8522 for the curve. Company man Matt Miller estimates they will reached total depth of 22156 on Friday. Mud weight is 10.5 with no flare during my inspection.
0079743129 2018-09-05 Casing String Witnessed No Violations On the day of my inspection I witnessed Xtreme 803 drilled a 12.25 inch diameter hole to 7228 feet. Wyoming casing ran to 7220 feet. Schlumberger pumped 40 barrels of 11 ppg mudpush and 10 barrels of water in front on the 180.7 barrels of lead cement. Lead cement weighed 12 ppg with a 1.79 yield. 35% excess on first stage. 81.4 barrels of tail cement was puped weighing 15.6 with a 1.19 yield. I witnessed 31 barrels of cement to surface on first stage. DV tool set at 3836 feet. Second stage will have 40 barrel of 11 ppg mudpush and 262.2 barrels of 15.6 tail cement pumped. Left before second stage started to catch a surface job. Identified myself to Company an Matt Miller.
0263739783 2018-11-27 Completion Testing No Violations On the day of my inspection I witnessed Universal frac crew on location. Identified myself to company man Malcolm Trahan and Bill Pugh. They will start stimulating this well tomorrow. Surface and Intermediate annular pressure was 0.
0413623402 2018-12-04 Completion Testing No Violations On the day of my inspection I witnessed a Universal frac crew on location. Identified myself to company men Malcolm Trahan and Bill Pugh. I witnessed the stimulate stage 10/91 on this well. Plug was set at 20617, with bottom perforation at 20607 and top perforation at 20486. They pumped 3000 gallons of 7.5% HCl acid, 5197 clean fluid, and 250206 lbs of sand (39962 lbs of 100 mesh sand and 210244 lbs of 40/70 mesh sand). Breakdown pressure was 7732 at 14 barrels per minute (BPM). Maximum rate was 86 BPM and average rate was 70 BPM. Maximum pressure was 10812 and average pressure was 9780. Initial shut in pressure (ISIP) was 5297 and 5 minute ISIP was 4980. Surface annular pressure is 100 and intermediate pressure is 0.
1091114423 2019-01-14 Completion Testing No Violations On the day of my inspection I witnessed Fortis Rig 1069 on location. They have not started drill out on this well yet. Surface annular pressure is 450 and intermediate is 0.
1163901235 2018-11-16 Completion Testing No Violations On the day of my inspection I found a Universal frac crew on location. They are zipper fracking the 1 and 5 wells. They are not tied in on this well. Surface annular pressure is 50 and intermediate annular pressure is 100.
1522348395 2018-03-28 Casing String Witnessed No Violations On the day of my inspection I witnessed Express had augered a 36 inch diameter hole to 100 feet and set 100 feet of 30 inch diameter conductor casing, 118 pounds per foot. CJ/otex was onsite with 330 sacks of Class A cement. Cement weighed 15.6 with pressurized mudscale and a yield of 1.2. 50% excess ran in open hole. Cement displaced with 71 barrels of fresh water to 85 feet. Cement returned to surface then fell back. On 3/29, cement had dropped to 60 feet. A topout is necessary. Cement supervisor was Kris Casas (Chili) and Ascent company men Tony Shepard and Sean Fox were onsite. Company man Tony Shepard was advised to pump top out through 1 inch diameter tubing.
1844390888 2018-12-20 Completion Testing No Violations On the day of my inspection I was accompanied by Geologist Tammy Richards. Universal frac crew is on location. Operations are down for maintenance and the company men could not be located during my inspection. Surface annular pressure is 500 psi and intermediate is 0 psi.
263739783 2018-11-27 0:00 CT No Violations 1.00

For data sources see[9]

References