If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21536 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.2,"lon":-81.12,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Moorefield Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001497 | |
Farm/Lease Name: SHERWOOD MRF HR | |
License Status: Producing | |
License Date: 2018-07-05 | |
Spud Date: 2017-07-11 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-09-19 | |
Well Total Depth: 22521.00 ft | |
Configuration: Horizontal | |
Latitude: 40.200000 | |
Longitude: -81.120000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-05-09 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:5/9/2017, Expired Date:5/9/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-08-25 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:8/25/2017, Expired Date:8/25/2019 12:00:00 PM, Drilling unit acres:521.525, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2018-07-05 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:7/5/2018, Expired Date:7/4/2020 12:00:00 PM, Drilling unit acres:521.525, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-09-19 | STATUS PER AS-DRILLED PLAT RCVD |
Correction to Well | 2018-12-21 | UPDATE TAKE/TARGET PER AS DRILLED PLAT |
Record Last Modified | 2019-01-02 | STATUS PER AS-DRILLED PLAT RCVD |
Construction Permit Expires | 2020-07-04 | STATUS PER AS-DRILLED PLAT RCVD |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
22295 | 22346 | 0 | |
8543 | 8674 | 0 | |
8543 | 8674 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2019-01-03 | H2O | 0 | 5753 Bbl | 250384 | Universal Well Services Inc. | On the day of my inspection I witnessed Universal frac crew stimulating stage 5/92. Plug set at 21811, with bottom perf at 20801 and top perf at 21711. They pumped 3027 gallons of 7.5% HCl, 5753 barrels of clean fluid, and 250384 lbs of sand. 100 mesh total was 59959 and 40/70 mesh total was 190425. Breakdown pressure was 7914. Initial Shut In Pressure (ISIP) was 5041 and 5 minute ISIP was 4598. Max rate was 80.9 barrels per minute (BPM) and max pressure was 10579. Average rate was 63.9 BPM and |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-21509810 | 2019-1-3 0:00:0 | CT | No Violations | 1.00 |
0021509810 | 2019-01-03 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal frac crew stimulating stage 5/92. Plug set at 21811, with bottom perf at 20801 and top perf at 21711. They pumped 3027 gallons of 7.5% HCl, 5753 barrels of clean fluid, and 250384 lbs of sand. 100 mesh total was 59959 and 40/70 mesh total was 190425. Breakdown pressure was 7914. Initial Shut In Pressure (ISIP) was 5041 and 5 minute ISIP was 4598. Max rate was 80.9 barrels per minute (BPM) and max pressure was 10579. Average rate was 63.9 BPM and average pressure was 9835. Surface annular pressure is 200 and intermediate annular pressure is 50. |
0070593214 | 2018-09-05 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed patterson 284 drilling a 12.25 inch diameter hole at 6033 feet. Identified myself to company man Mark Smith. He plans on reaching total depth of this section around 7500 feet tomorrow. He anticipates the ceent job will be Friday afternoon. |
0179587777 | 2019-03-28 | Completion Testing | No Violations | On the day of my inspection I witnessed CWS 7009 stand alone snubbing unit onsite. This unit was on the 9H well. Surface (13x9) annular pressure is 400 psi and the intermediate (9x5) annular pressure is 500 psi. |
0820417120 | 2018-07-18 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed the surface casing cement job. Falcon 26 drilled a 17.5 inch diameter open hole to a depth of 1015 feet. They encountered at sustained gas at 990 feet. Previous casing set and cemented was 30 inch diameter conductor casing to a depth of 150 feet. Wyoming Casing ran 973 feet of 13.375 inch diameter casing, j-55, 61 lbs/foot, with a 3 foot stickup. Shoe track is 46 feet long. CJ/Otex was onsite with 1585 sacks of class A cement. Plan is to pump only 1235 sacks. Additives include 3% salt, 1.5% cacl, and 0.2% X-air. Cement weighed with mudscale at 15.6 ppg and yield of 1.21. 50% excess ran in open hole, including the 45 feet below the casing shoe. Cement displaced with 17 barrels of fresh water and pressure up. 20 barrels of gel pumped ahead of cement. Calculated cement top of 120 feet from surface. Tagged cement down backside with fishing pole at 190 feet. Ascent ordered 500 sacks of neat cement for top out because they did not want to risk pumping the remaining 350 sacks of cement that they had on location. Mark believes the cement blend was the issue and was not salt resistant cement. They ran one inch tubing into 146 feet and pumped 94 barrels of cement, returning 10 barrels to surface. |
0898023520 | 2018-09-11 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 284 drilling an 8.5 inch diameter hole at 10182 feet. Mud weight is 10.9 ppg with no flare. Estimated total depth is 22500. Kick off point was 7582 and landing point was 8800. |
1670035094 | 2019-01-10 | Completion Testing | No Violations | On the day of my inspection I witnessed Universal frac crew on location. They are not stimulating any wells at this time due to equipment issues. Wireline has perfed stage 18. Plug is set at 19848, with top perf at 19718 and bottom perf at 19838. Surface annular pressure is 50 and intermediate annular pressure is 500. |
179587777 | 2019-3-28 0:00: | CT | No Violations | 1.00 |
1915505927 | 2019-01-23 | Completion Testing | No Violations | On the day of my inspection I witnessed a Universal frac crew on location tied into the 1h, 3h, and 9h wells. They just finished perforating stage 38/92 on this well. Plug was set at 16828, with bottom perfs at 16818 and top perfs at 16697. Stage 19 screened off on initiation and they end did not stimulate it. Plug was set at 19697, with bottom perfs at 19687 and top perfs at 19566. Surface annular pressure was 50 and intermediate annular pressure was 200. |
195904266 | 2019-10-30 0:00 | PL | No Violations | 1.00 |
2092942636 | 2020-9-29 0:00: | PW | No Violations | 0.50 |
70593214 | 2018-9-5 0:00:0 | DD | No Violations | 1.00 |
820417120 | 2018-7-18 0:00: | CS | No Violations | 5.00 |
898023520 | 2018-9-11 0:00: | DD | No Violations | 1.00 |
For data sources see[5]