If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21480 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.42,"lon":-81.16,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Monroe Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000880 | |
Farm/Lease Name: BOWERSTON 21-13-6 | |
License Status: Producing | |
License Date: 2015-06-12 | |
Spud Date: 2015-06-12 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2015-08-14 | |
Well Total Depth: 17967.00 ft | |
Configuration: Horizontal | |
Latitude: 40.420000 | |
Longitude: -81.160000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-06-12 | Proposed Formations:POINT PLEASANT, Issued Date:6/12/2015, Expired Date:6/11/2017 12:00:00 PM, Drilling unit acres:1014.23, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-08-14 | |
Correction to Well | 2015-11-20 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Construction Permit Expires | 2017-06-11 | |
Correction to Well | 2017-06-30 | UPDATE TAKE PER AS-COMP PLAT RCVD 6-13-2017 ALE |
Completion Report Received | 2017-07-24 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-08-03 | 7915 | 8037 | 30 |
2017-08-03 | 17721 | 17843 | 30 |
17721 | 17843 | 30 | |
7915 | 8037 | 30 | |
7915 | 8037 | 30 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/31/2017 | 03/31/2017 | 7670 | 11,036,400.0 | 1,103,620.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | GBW-5 | BJ SERVICES | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00297 | 0 |
ENZYME G-NE | BJ SERVICES | Breaker | No Hazardous Components | Not Assigned | 0 | 0 | 0 | |
Chlorine Dioxide | FOUNTAIN QUAIL | Anti-Bacterial Agent | Chlorine Dioxide | 10049-04-4 | 1 | 0.0001 | 0 | |
SC30 | X CHEM | Scale Inhibitor | Sodium Polyacrylate | 009003-04-7 | 100 | 0.00825 | 0 | |
Northern White Sand | BJ SERVICES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 18.7176 | 0 | |
BF-9L, CI-14, ENZYME G-NE, FERROTROL 300L | BJ SERVICES | Breaker, Corrosion Inhibitor, Iron Control Agent, pH Adjusting Agent | Proprietary Copolymer | Trade Secret | 0 | 0.0013 | 0 | |
Proprietary Surfactant | Trade Secret | 0 | 0.0013 | 0 | ||||
Hemicellulase Enzyme Concentrate | 009025-56-3 | 0 | 0.04074 | 0 | ||||
Water | 007732-18-5 | 0 | 0.14197 | 0 | ||||
Proprietary Biocide | Trade Secret | 0 | 0.0013 | 0 | ||||
Proprietary Acid | Trade Secret | 0 | 0.0013 | 0 | ||||
Proprietary Polymer | Trade Secret | 0 | 0.0013 | 0 | ||||
FERROTROL 300L | BJ SERVICES | Iron Control Agent | Citric Acid | 000077-92-9 | 50 | 0.00216 | 0 | |
HCL 5.1 - 7.5 | BJ SERVICES | Acid | Water | 007732-18-5 | 93 | 0.55077 | 0 | |
Hydrochloric Acid | 007647-01-0 | 8 | 0.04466 | 0 | ||||
CI-14 | BJ SERVICES | Corrosion Inhibitor | Propargyl Alcohol (2-Propynol) | 000107-19-7 | 5 | 0.00005000 | 0 | |
Methanol (Methyl Alcohol) | 000067-56-1 | 68 | 0.00071 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 5.22324 | 0 | |
MAXPERM 30 | BJ SERVICES | Friction Reducer | Distillates (petroleum), Hydrotreated Light | 64742-47-8 | 20 | 0.00823 | 0 | |
Oxyalkylated alcohol | Trade Secret | 5 | 0.00206 | 0 | ||||
Acrylamide modified polymer | Trade Secret | 50 | 0.02057 | 0 | ||||
XLW-32 | BJ SERVICES | Cross Linker | Boric Acid | 010043-35-3 | 20 | 0.00911 | 0 | |
Methanol (Methyl Alcohol) | 000067-56-1 | 90 | 0.04098 | 0 | ||||
GW-3 | BJ SERVICES | Gelling Agent | Guar Gum | 009000-30-0 | 100 | 0.09557 | 0 | |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 74.2246 | 0 | |
BF-9L | BJ SERVICES | pH Adjusting Agent | Potassium Hydroxide | 001310-58-3 | 15 | 0.0114 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-04-14 | H2O | 7 | 3642 Bbl | 365232 | BAKER-HUGHES | STAGE 66/66
STAGES 2-65 SEE IMAGES |
2017-03-14 | H2O | 8 | 4727 Bbl | 328920 | BAKER-HUGHES | STAGE 1/66
STAGES 2-65 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CHESAPEAKE EXPLORATION LLC | 382152 | 87935 | 211 |
2018 | CHESAPEAKE EXPLORATION LLC | 415577 | 66871 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 76436 | 10978 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 47609 | 211 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 8798 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 1545 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1710563108 | 2018-4-10 0:00: | PL | No Violations | 1.50 |
-916919503 | 2019-11-25 0:00 | PW | No Violations | 1.00 |
0806321526 | 2016-02-26 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. I found that all the wells have been drilled and night caps are placed on the wells bores. A gas sales line has been ran to the location but was not connected. No production equipment was present on the day of my inspection. |
1023968990 | 2020-6-30 0:00: | PW | No Violations | 1.00 |
1376688007 | 2019-7-19 0:00: | PW | No Violations | 1.00 |
1434381798 | 2015-06-13 | Casing String Witnessed | No Violations | I am on site today to witness the running and the cementing of the 20 inch diameter casing string. Express Energy Service drilled a 26 inch diameter hole to 120 ft. and set 120 ft. of 94 lb. casing. Express Energy Service cemented with 230 sacks of class A cement at 15.6 lb. and a yield of 1.18 Had good cement returns to surface- 15 bbl.. |
1438849251 | 2015-08-06 | Casing String Witnessed | No Violations | Upon arrival on location I found the rig crew had run 498 feet of 13 3/8 inch casing in the wellbore. Schlumberger will cement. Established circulation and circulated 30 bbl of good cement to surface. Floats held, when the pressure was released, 1/2 bbl flowed back. |
1439471184 | 2015-08-13 | Drill / Deepen / Reopen | No Violations | Upon arrival I found the rig crew drilling ahead at a depth of 16114 feet. Will TD well tonight. There are no issues with operations or drilling at this time. |
1710563108 | 2018-04-10 | Preliminary Restoration | No Violations | On the day of my inspection I found this pad containing 8 properly labeled wells that are producing. This well has a plunger lift system wellhead. Pressure gauges read as follows: Surface 3 psi, Intermediate 365 psi, Production 641 psi, and Tubing 334 psi. Casing hanger is plumbed into buried flow line. Production equipment includes fifteen 400 barrel steel tanks within their own steel containment, three compressors, three line heaters, eight sand separators, eight GPUs, a vapor recovery stack, and two combustors. One heater treater onsite. Site is stable and vegetated. Site meets preliminary restoration requirements of 1509.072A. |
1895841894 | 2019-7-19 0:00: | PW | No Violations | 1.00 |
251116187 | 2019-10-23 0:00 | PW | No Violations | 1.50 |
558372242 | 2019-7-8 0:00:0 | PW | No Violations | 2.00 |
806321526 | 2016-2-26 0:00: | PL | No Violations | 0.50 |
For data sources see[10]