X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21480

Well Details

Well ID: 34-067-21480
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Monroe Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000880
Farm/Lease Name: BOWERSTON 21-13-6
License Status: Producing
License Date: 2015-06-12
Spud Date: 2015-06-12
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2015-08-14
Well Total Depth: 17967.00 ft
Configuration: Horizontal
Latitude: 40.420000
Longitude: -81.160000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-06-12 Proposed Formations:POINT PLEASANT, Issued Date:6/12/2015, Expired Date:6/11/2017 12:00:00 PM, Drilling unit acres:1014.23, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-08-14
Correction to Well 2015-11-20 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Construction Permit Expires 2017-06-11
Correction to Well 2017-06-30 UPDATE TAKE PER AS-COMP PLAT RCVD 6-13-2017 ALE
Completion Report Received 2017-07-24
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-08-03 7915 8037 30
2017-08-03 17721 17843 30
17721 17843 30
7915 8037 30
7915 8037 30

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/31/2017 03/31/2017 7670 11,036,400.0 1,103,620.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 GBW-5 BJ SERVICES Breaker Ammonium Persulfate 007727-54-0 100 0.00297 0
ENZYME G-NE BJ SERVICES Breaker No Hazardous Components Not Assigned 0 0 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 1 0.0001 0
SC30 X CHEM Scale Inhibitor Sodium Polyacrylate 009003-04-7 100 0.00825 0
Northern White Sand BJ SERVICES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 18.7176 0
BF-9L, CI-14, ENZYME G-NE, FERROTROL 300L BJ SERVICES Breaker, Corrosion Inhibitor, Iron Control Agent, pH Adjusting Agent Proprietary Copolymer Trade Secret 0 0.0013 0
Proprietary Surfactant Trade Secret 0 0.0013 0
Hemicellulase Enzyme Concentrate 009025-56-3 0 0.04074 0
Water 007732-18-5 0 0.14197 0
Proprietary Biocide Trade Secret 0 0.0013 0
Proprietary Acid Trade Secret 0 0.0013 0
Proprietary Polymer Trade Secret 0 0.0013 0
FERROTROL 300L BJ SERVICES Iron Control Agent Citric Acid 000077-92-9 50 0.00216 0
HCL 5.1 - 7.5 BJ SERVICES Acid Water 007732-18-5 93 0.55077 0
Hydrochloric Acid 007647-01-0 8 0.04466 0
CI-14 BJ SERVICES Corrosion Inhibitor Propargyl Alcohol (2-Propynol) 000107-19-7 5 0.00005000 0
Methanol (Methyl Alcohol) 000067-56-1 68 0.00071 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 5.22324 0
MAXPERM 30 BJ SERVICES Friction Reducer Distillates (petroleum), Hydrotreated Light 64742-47-8 20 0.00823 0
Oxyalkylated alcohol Trade Secret 5 0.00206 0
Acrylamide modified polymer Trade Secret 50 0.02057 0
XLW-32 BJ SERVICES Cross Linker Boric Acid 010043-35-3 20 0.00911 0
Methanol (Methyl Alcohol) 000067-56-1 90 0.04098 0
GW-3 BJ SERVICES Gelling Agent Guar Gum 009000-30-0 100 0.09557 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 74.2246 0
BF-9L BJ SERVICES pH Adjusting Agent Potassium Hydroxide 001310-58-3 15 0.0114 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-04-14 H2O 7 3642 Bbl 365232 BAKER-HUGHES STAGE 66/66

STAGES 2-65 SEE IMAGES

2017-03-14 H2O 8 4727 Bbl 328920 BAKER-HUGHES STAGE 1/66

STAGES 2-65 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC 382152 87935 211
2018 CHESAPEAKE EXPLORATION LLC 415577 66871 365
2019 CHESAPEAKE EXPLORATION LLC 76436 10978 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 CHESAPEAKE EXPLORATION LLC Brine 47609 211
2018 CHESAPEAKE EXPLORATION LLC Brine 8798 365
2019 CHESAPEAKE EXPLORATION LLC Brine 1545 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1710563108 2018-4-10 0:00: PL No Violations 1.50
-916919503 2019-11-25 0:00 PW No Violations 1.00
0806321526 2016-02-26 Preliminary Restoration No Violations I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. I found that all the wells have been drilled and night caps are placed on the wells bores. A gas sales line has been ran to the location but was not connected. No production equipment was present on the day of my inspection.
1023968990 2020-6-30 0:00: PW No Violations 1.00
1376688007 2019-7-19 0:00: PW No Violations 1.00
1434381798 2015-06-13 Casing String Witnessed No Violations I am on site today to witness the running and the cementing of the 20 inch diameter casing string. Express Energy Service drilled a 26 inch diameter hole to 120 ft. and set 120 ft. of 94 lb. casing. Express Energy Service cemented with 230 sacks of class A cement at 15.6 lb. and a yield of 1.18 Had good cement returns to surface- 15 bbl..
1438849251 2015-08-06 Casing String Witnessed No Violations Upon arrival on location I found the rig crew had run 498 feet of 13 3/8 inch casing in the wellbore. Schlumberger will cement. Established circulation and circulated 30 bbl of good cement to surface. Floats held, when the pressure was released, 1/2 bbl flowed back.
1439471184 2015-08-13 Drill / Deepen / Reopen No Violations Upon arrival I found the rig crew drilling ahead at a depth of 16114 feet. Will TD well tonight. There are no issues with operations or drilling at this time.
1710563108 2018-04-10 Preliminary Restoration No Violations On the day of my inspection I found this pad containing 8 properly labeled wells that are producing. This well has a plunger lift system wellhead. Pressure gauges read as follows: Surface 3 psi, Intermediate 365 psi, Production 641 psi, and Tubing 334 psi. Casing hanger is plumbed into buried flow line. Production equipment includes fifteen 400 barrel steel tanks within their own steel containment, three compressors, three line heaters, eight sand separators, eight GPUs, a vapor recovery stack, and two combustors. One heater treater onsite. Site is stable and vegetated. Site meets preliminary restoration requirements of 1509.072A.
1895841894 2019-7-19 0:00: PW No Violations 1.00
251116187 2019-10-23 0:00 PW No Violations 1.50
558372242 2019-7-8 0:00:0 PW No Violations 2.00
806321526 2016-2-26 0:00: PL No Violations 0.50

For data sources see[10]

References