X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21469

Well Details

Well ID: 34-067-21469
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: North Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001251
Farm/Lease Name: HARTLEY 2-13-6
License Status: Producing
License Date: 2017-07-10
Spud Date: 2017-07-27
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-09-01
Well Total Depth: 22470.00 ft
Configuration: Horizontal
Latitude: 40.410000
Longitude: -81.110000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-04-29 Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:4/29/2015, Expired Date:4/28/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-05-10 Proposed Formations:TRENTON BLACK RIVER, Issued Date:5/10/2017, Expired Date:5/10/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-07-06 Proposed Formations:POINT PLEASANT, Issued Date:7/6/2017, Expired Date:7/6/2019 12:00:00 PM, Drilling unit acres:371.57, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2017-07-10 Proposed Formations:POINT PLEASANT, Issued Date:7/10/2017, Expired Date:7/10/2019 12:00:00 PM, Drilling unit acres:371.57, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2017-07-28 CORRECTION TO TARGET FOOTAGE.
Reached Total Depth 2017-09-01
Correction to Well 2018-02-16 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-03-06
Record Last Modified 2018-03-20
Construction Permit Expires 2019-07-10

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-03-19 8425 8546 30
2018-03-19 22225 22346 30
22225 22346 30
8425 8546 30
8425 8546 30

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/25/2017 11/29/2017 7775 16,662,400.0 1,660,470.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FE-1A HALLIBURTON Iron Control Agent Acetic Anhydride 000108-24-7 100 0.00638 0
Acetic acid 000064-19-7 60 0.00383 0
BC-140 X2 HALLIBURTON Cross Linker Ethylene Glycol 000107-21-1 30 0.01396 0
Monoethanolamine borate 026038-87-9 60 0.02792 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 1 0.00016 0
FR-76 HALLIBURTON Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 30 0.01282 0
Proprietary Inorganic Salt Trade Secret 30 0.01282 0
BA-40L, BC-140 X2, FE-1A, FR-76,

HAI-OS, OPTIFLO-III DELAYED RELEASE, SP BREAKER, WG-36

HALLIBURTON Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, pH Adjusting Agent Polyacrylamide copolymer Trade Secret 30 0.01558 0
Non-MSDS Components Not Provided by Supplier Not Assigned 0 0 0
SP BREAKER HALLIBURTON Breaker Sodium Persulfate 007775-27-1 100 0.00066 0
HAI-OS HALLIBURTON Corrosion Inhibitor Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00021 0
Methanol (Methyl Alcohol) 000067-56-1 60 0.00126 0
WG-36 HALLIBURTON Gelling Agent Guar Gum 009000-30-0 100 0.08951 0
OPTIFLO-III DELAYED RELEASE HALLIBURTON Breaker Ammonium Persulfate 007727-54-0 100 0.00181 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 30 0.00054 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 14.1649 0
Northern White Sand HALLIBURTON Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 16.2247 0
BA-40L HALLIBURTON pH Adjusting Agent Potassium Carbonate 000584-08-7 60 0.00025 0
SC-30 FOUNTAIN QUAIL Scale Inhibitor Sodium Hydroxide 1310-73-2 2 0.00021 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 66.6859 0
7.5%HCL HYDROCHLORIC ACID HALLIBURTON Acid Water 007732-18-5 93 1.14119 0
Hydrochloric Acid 007647-01-0 8 0.09253 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-10-25 H2O 10 4840 Bbl 332027 Halliburton STAGE 1/93

STAGES 2-92 SEE IMAGES

2017-11-29 H2O 10 4467 Bbl 321175 Halliburton STAGE 93/93

STAGES 2-92 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 CHESAPEAKE EXPLORATION LLC 878263 106261 353
2019 CHESAPEAKE EXPLORATION LLC 132794 13839 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 CHESAPEAKE EXPLORATION LLC Brine 78017 353
2019 CHESAPEAKE EXPLORATION LLC Brine 2699 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1100193719 2018-11-6 0:00: PL No Violations 1.00
-1853214778 2017-7-28 0:00: CS No Violations 3.00
-2093081083 2020-6-22 0:00: PW No Violations 1.00
-248184242 2018-4-10 0:00: PL No Violations 1.00
-735381699 2016-2-23 0:00: ND No Violations 0.50
0248184242 2018-04-10 Preliminary Restoration No Violations On the day of my inspection I found this pad containing 3 properly labeled well that are producing on natural reservoir pressure. All wells have christmas tree style wellheads. Pressure gauges read as follows: Surface 0 psi, Intermediate 2.5 psi, Production 1091 psi, and Tubing 420 psi. Intermediate annulus is plumbed to buried flowline with dump valve. Blind side of casing hanger is also plumbed into a buried flow line but is currently shut in. Production equipment includes ten 400 barrel steel tanks within their own steel containment, two compressors, two line heaters, three sand separators, three GPUs, two heater treaters, a vapor recovery stack, and a combustor. Site is stable and vegetated. Site meets preliminary restoration requirements of 1509.072A.
0735381699 2016-02-23 Not Drilled No Violations On the day of my inspection accompanied by inspector Mark Moreland, I witnessed the well location has been constructed but the permitted wells have not been drilled and no conductor or tin horn has been set. The pad is fenced and all man doors were locked. The lease road was in adequate condition.
1100193719 2018-11-06 Preliminary Restoration No Violations On the day of my inspection I witnessed this pad containing 3 producing wells. This well is producing off of natural reservoir pressure through tubing. Surface annular pressure is 0 and intermediate annular is 433. Intermediate annular is plumbed into flowline. Production equipment includes 3 GPUs, 3 sand seperators, 2 compressors, a combustor, and 10 400 barrel steel tanks in their own containment. Six tanks are condensate and four are produced water. Site meets requirements of OAC 1509.072A for preliminary restoration.
1503591638 2017-08-24 Drill / Deepen / Reopen No Violations On the day of my inspection Patterson 580 has drilled 7288 feet and Baker Hughes is currently logging the hole. Company man Chris Richardson said they have been having trouble with holes in containment and areas that have been patched were noted. No holes were noted in containment during my inspection. Pad drains are shut in have little water in the basin.
1662572944 2017-08-31 Drill / Deepen / Reopen No Violations On the day of my inspection I found Patterson 580 rig tripping back into the hole. Rig had bit troubles yesterday at 20999 feet and had to trip out and change bits. They were tripping in at 9191 feet during my inspection. Walk around of pad drains and containment revealed no deficiencies.
173420964 2019-10-23 0:00 PW No Violations 1.00
1853214778 2017-07-28 Casing String Witnessed No Violations On the day of my inspection I witnessed Express energy services had augured a 26 inch diameter hole to 110 feet. Hole had standing water approx 40 feet down. 110 feet of 20 inch diameter conductor casing was run. Express energy services was onsite with 210 sacks of class A cement. Additives include 2% CaCl and .5 lb./sack floseal. Cement weighed with mudscale at 15.6 ppg and yield of 1.18. 50% percent excess ran. Cement was displaced with 35.5 barrels of fresh water. 14 barrels of cement returned to surface.

For data sources see[10]

References