If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21431 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.36,"lon":-81.07,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Archer Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001016 | |
Farm/Lease Name: KLODT 29-11-5 | |
License Status: Producing | |
License Date: 2014-12-18 | |
Spud Date: 2014-12-22 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2015-03-06 | |
Well Total Depth: 18057.00 ft | |
Configuration: Horizontal | |
Latitude: 40.360000 | |
Longitude: -81.070000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-12-18 | Proposed Formations:POINT PLEASANT, Issued Date:12/18/2014, Expired Date:12/17/2016 12:00:00 PM, Drilling unit acres:1245.1, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-03-06 | |
Correction to Well | 2015-09-04 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-03-02 | |
Construction Permit Expires | 2016-12-17 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-03-04 | 8625 | 17926 | 0 |
8625 | 17926 | 0 | |
8625 | 17926 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/12/2015 | 07/23/2015 | 8094 | 8,440,240.0 | 737119 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 82.5919 | 0 |
A264, B244, B317, J218, J475, J580,
J609, J610, L058, Acid, Hydrochloric 15pct, Acid, Hydrochloric 7.5pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00014 | 0 | |
Sodium Erythorbate | 006381-77-7 | 100 | 0.00046 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 5 | 0.00024 | 0 | ||||
Ammonium Sulfate | 007783-20-2 | 30 | 0.00987 | 0 | ||||
Hydrochloric Acid | 007647-01-0 | 8 | 0.01679 | 0 | ||||
Water | 007732-18-5 | 85 | 0.5839 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00271 | 0 | ||||
Aliphatic acid | NA | 30 | 0.00043 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 15.7442 | 0 | ||||
Carbohydrate polymer | NA | 100 | 0.08493 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 40 | 0.00058 | 0 | ||||
Trisodium Ortho Phosphate | 007601-54-9 | 5 | 0.00024 | 0 | ||||
Glutaraldehyde (Pentanediol) | 000111-30-8 | 25 | 0.00202 | 0 | ||||
Aliphatic polyol | NA | 30 | 0.01514 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.0006 | 0 | ||||
Aliphatic alcohols, ethoxylated # 1 | NA | 30 | 0.00043 | 0 | ||||
Hydrogen Chloride | 007647-01-0 | 15 | 0.10304 | 0 | ||||
Water | 007732-18-5 | 93 | 0.2071 | 0 | ||||
Potassium Hydroxide | 001310-58-3 | 15 | 0.00757 | 0 | ||||
Aliphatic amine polymer | NA | 30 | 0.00987 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 0.55251 | 0 | ||||
Chlorine Dioxide | TERRA SERVICES | Anti-Bacterial Agent | Chlorine Dioxide | 010049-04-4 | 100 | 0.00521 | 0 | |
TS-15 | X CHEM | Scale Inhibitor | Proprietary Sodium Polycarboxylate | TRADE SECRET | 100 | 0.00895 | 0 | |
Water | 007732-18-5 | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-07-12 | H2O | 0 | 4873 Bbl | 280114 | Schlumberger | STAGE 1/42
25 SHOTS STAGES 2-41 SEE IMAGES |
2015-07-23 | H2O | 0 | 4632 Bbl | 341620 | Schlumberger | STAGE 42/42
25 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | 171733 | 18294 | 63 |
2016 | CHESAPEAKE EXPLORATION LLC | 774398 | 50822 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 398828 | 21474 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 306492 | 15108 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 62728 | 3113 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 6333 | 63 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 10118 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 4283 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 7223 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 963 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-135091108 | 2015-2-23 0:00: | DD | No Violations | 3.50 |
-560872771 | 2019-8-16 0:00: | PW | No Violations | 0.50 |
0112957374 | 2015-02-21 | Casing String Witnessed | No Violations | The rig ran 9-5/ Caing to 2506. Schlumberger cemented it with 907 sacks of Class A cement. Good cement was returned to the surface. A pressure test of the casing at the end of the job fell with in the parameters set forth in the law. See the Casing Ticket for the details. |
0135091108 | 2015-02-23 | Drill / Deepen / Reopen | No Violations | I was on location to check the drilling status of Nomac Rig #73. The rig mudded up at a depth of 7192 and is currently drilling the 8.5 curve at a total measured depth of 7423. 5.5 production casing is being delivered to the racks in front of the rig. It is new, 20lb/ft., P-110 casing. I met with the company men and discussed the issues they had during the surface casing cement job with O-Tex Pumping (see cement report). They will be using Schlumberger for the primary cement job. The location is in good condition and all drilling equipment is on containment. No violations. |
0620976236 | 2016-01-11 | Preliminary Restoration | No Violations | On the day of my inspection, I witnessed the well was equipped with a production tree. Production equipment for the well included a sand trap, a gas production unit and a line heater. Production equipment that was shared with permitted wells 34067212280000, 34067212290000, 34067212300000, 34067212310000, 34067212320000, 34067212330000, and 34067214320000 included a vapor recovery system, 5 gas compressors, a gas combustor and 12-400 bbl. tanks that where placed inside proper containment. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
112957374 | 2015-2-21 0:00: | CS | No Violations | |
1398110251 | 2016-02-18 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells are producing off of natural reservoir pressure. RBDMS production records indicate that the wells are in producing order.
The production equipment on the pad consists of the following: 12 400 bbl. Production tanks 8 Producing wells 8 Sand separators 2 Horizontal heater-treaters 1 combustor 1 Low pressure separator tower/Vapor recovery system unit. 5 compressors There was approximately 2 to 3 inches of snow on location at the time of my inspection. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
1424303578 | 2015-02-18 | Casing String Witnessed | No Violations | Nomac Rig 73 ran 14 joints of R-3 54.5 # casing to 517. O-tex Pumping cemented it with 490 sacks of Class H cement. Good cement was returned to the surface. See the casing ticket for the details. |
1429624338 | 2015-03-06 | Drill / Deepen / Reopen | No Violations | I was on location to inspect the drilling operations of Nomac Rig # 73. They have drilled the 8.5 lateral to a total measured depth of 18,057 and are currently circulating to clean up the borehole. They will begin tripping the drill pipe out of the hole this afternoon and rig up to run 5.5 production casing. I inspected the casing and it is new, 20lb/ft., Grade P-110 casing. All drilling equipment is on containment. No violations. |
620976236 | 2016-1-11 0:00: | PL | No Violations | 0.50 |
For data sources see[10]