Well Details

Well ID: 34-067-21431
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Archer Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001016
Farm/Lease Name: KLODT 29-11-5
License Status: Producing
License Date: 2014-12-18
Spud Date: 2014-12-22
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2015-03-06
Well Total Depth: 18057.00 ft
Configuration: Horizontal
Latitude: 40.360000
Longitude: -81.070000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-12-18 Proposed Formations:POINT PLEASANT, Issued Date:12/18/2014, Expired Date:12/17/2016 12:00:00 PM, Drilling unit acres:1245.1, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-03-06
Correction to Well 2015-09-04 CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2016-03-02
Construction Permit Expires 2016-12-17
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-03-04 8625 17926 0
8625 17926 0
8625 17926 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/12/2015 07/23/2015 8094 8,440,240.0 737119

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 82.5919 0
A264, B244, B317, J218, J475, J580,

J609, J610, L058, Acid, Hydrochloric 15pct, Acid, Hydrochloric 7.5pct, Northern White Sand, 100 Mesh Sand

SCHLUMBERGER Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00014 0
Sodium Erythorbate 006381-77-7 100 0.00046 0
Ethylene Glycol 000107-21-1 5 0.00024 0
Ammonium Sulfate 007783-20-2 30 0.00987 0
Hydrochloric Acid 007647-01-0 8 0.01679 0
Water 007732-18-5 85 0.5839 0
Ammonium Persulfate 007727-54-0 100 0.00271 0
Aliphatic acid NA 30 0.00043 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 15.7442 0
Carbohydrate polymer NA 100 0.08493 0
Methanol (Methyl Alcohol) 000067-56-1 40 0.00058 0
Trisodium Ortho Phosphate 007601-54-9 5 0.00024 0
Glutaraldehyde (Pentanediol) 000111-30-8 25 0.00202 0
Aliphatic polyol NA 30 0.01514 0
Ammonium Persulfate 007727-54-0 100 0.0006 0
Aliphatic alcohols, ethoxylated # 1 NA 30 0.00043 0
Hydrogen Chloride 007647-01-0 15 0.10304 0
Water 007732-18-5 93 0.2071 0
Potassium Hydroxide 001310-58-3 15 0.00757 0
Aliphatic amine polymer NA 30 0.00987 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 0.55251 0
Chlorine Dioxide TERRA SERVICES Anti-Bacterial Agent Chlorine Dioxide 010049-04-4 100 0.00521 0
TS-15 X CHEM Scale Inhibitor Proprietary Sodium Polycarboxylate TRADE SECRET 100 0.00895 0
Water 007732-18-5 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-07-12 H2O 0 4873 Bbl 280114 Schlumberger STAGE 1/42

25 SHOTS STAGES 2-41 SEE IMAGES

2015-07-23 H2O 0 4632 Bbl 341620 Schlumberger STAGE 42/42

25 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 CHESAPEAKE EXPLORATION LLC 171733 18294 63
2016 CHESAPEAKE EXPLORATION LLC 774398 50822 366
2017 CHESAPEAKE EXPLORATION LLC 398828 21474 365
2018 CHESAPEAKE EXPLORATION LLC 306492 15108 365
2019 CHESAPEAKE EXPLORATION LLC 62728 3113 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 CHESAPEAKE EXPLORATION LLC Brine 6333 63
2016 CHESAPEAKE EXPLORATION LLC Brine 10118 366
2017 CHESAPEAKE EXPLORATION LLC Brine 4283 365
2018 CHESAPEAKE EXPLORATION LLC Brine 7223 365
2019 CHESAPEAKE EXPLORATION LLC Brine 963 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-135091108 2015-2-23 0:00: DD No Violations 3.50
-560872771 2019-8-16 0:00: PW No Violations 0.50
0112957374 2015-02-21 Casing String Witnessed No Violations The rig ran 9-5/ Caing to 2506. Schlumberger cemented it with 907 sacks of Class A cement. Good cement was returned to the surface. A pressure test of the casing at the end of the job fell with in the parameters set forth in the law. See the Casing Ticket for the details.
0135091108 2015-02-23 Drill / Deepen / Reopen No Violations I was on location to check the drilling status of Nomac Rig #73. The rig mudded up at a depth of 7192 and is currently drilling the 8.5 curve at a total measured depth of 7423. 5.5 production casing is being delivered to the racks in front of the rig. It is new, 20lb/ft., P-110 casing. I met with the company men and discussed the issues they had during the surface casing cement job with O-Tex Pumping (see cement report). They will be using Schlumberger for the primary cement job. The location is in good condition and all drilling equipment is on containment. No violations.
0620976236 2016-01-11 Preliminary Restoration No Violations On the day of my inspection, I witnessed the well was equipped with a production tree. Production equipment for the well included a sand trap, a gas production unit and a line heater. Production equipment that was shared with permitted wells 34067212280000, 34067212290000, 34067212300000, 34067212310000, 34067212320000, 34067212330000, and 34067214320000 included a vapor recovery system, 5 gas compressors, a gas combustor and 12-400 bbl. tanks that where placed inside proper containment. The site passed preliminary restoration in accordance with ORC 1509.072 A.
112957374 2015-2-21 0:00: CS No Violations
1398110251 2016-02-18 Preliminary Restoration No Violations I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells are producing off of natural reservoir pressure. RBDMS production records indicate that the wells are in producing order.
The production equipment on the pad consists of the following:

12 400 bbl. Production tanks 8 Producing wells 8 Sand separators

2 Horizontal heater-treaters 1 combustor 1 Low pressure separator tower/Vapor recovery system unit. 5 compressors

There was approximately 2 to 3 inches of snow on location at the time of my inspection. The site passed preliminary restoration in accordance with ORC 1509.072 A.
1424303578 2015-02-18 Casing String Witnessed No Violations Nomac Rig 73 ran 14 joints of R-3 54.5 # casing to 517. O-tex Pumping cemented it with 490 sacks of Class H cement. Good cement was returned to the surface. See the casing ticket for the details.
1429624338 2015-03-06 Drill / Deepen / Reopen No Violations I was on location to inspect the drilling operations of Nomac Rig # 73. They have drilled the 8.5 lateral to a total measured depth of 18,057 and are currently circulating to clean up the borehole. They will begin tripping the drill pipe out of the hole this afternoon and rig up to run 5.5 production casing. I inspected the casing and it is new, 20lb/ft., Grade P-110 casing. All drilling equipment is on containment. No violations.
620976236 2016-1-11 0:00: PL No Violations 0.50