Well ID: 34-067-21385 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.28,"lon":-81.32,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Washington Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: US-OH-001138 | |
Farm/Lease Name: GOODING | |
License Status: Producing | |
License Date: 2014-09-30 | |
Spud Date: 2014-12-17 | |
Spud Drilling Contractor: NABORS DRILLING | |
Final Drill Date: 2015-02-05 | |
Well Total Depth: 15674.00 ft | |
Configuration: Horizontal | |
Latitude: 40.280000 | |
Longitude: -81.320000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-09-30 | Proposed Formations:POINT PLEASANT, Issued Date:9/30/2014, Expired Date:9/29/2016 12:00:00 PM, Drilling unit acres:196.22, Proposed Well Type:OG, Proposed Well Class:EOUT |
Plugged Back | 2015-01-05 | |
Reached Total Depth | 2015-02-05 | |
Correction to Well | 2015-04-24 | CHANGE IN TARGET FOOTAGE FROM AS DRILLED SURVEY PLAT. |
Correction to Well | 2015-11-06 | UPDATE TO TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE INCREASED. |
Correction to Well | 2016-01-01 | Change in target per as-drilled plat-ALE |
Completion Report Received | 2016-02-08 | |
Construction Permit Expires | 2016-09-29 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-07-18 | H2O | 8 | 167265 Gal | 77678 | Schlumberger | STAGE 1/35
40 SHOTS STAGES 2/34 |
2015-08-04 | H2O | 8 | 409315 Gal | 451524 | Schlumberger | STAGE 35/35
45 SHOTS |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | CHEVRON APPALACHIA LLC | 319853 | 61075 | 344 |
2017 | CHEVRON APPALACHIA LLC | 191248 | 25164 | 365 |
2018 | CHEVRON APPALACHIA LLC | 144650 | 16525 | 365 |
2019 | CHEVRON APPALACHIA LLC | 32086 | 3541 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | CHEVRON APPALACHIA LLC | Brine | 19460 | 344 |
2017 | CHEVRON APPALACHIA LLC | Brine | 3571 | 365 |
2018 | CHEVRON APPALACHIA LLC | Brine | 1999 | 365 |
2019 | CHEVRON APPALACHIA LLC | Brine | 414 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1725050351 | 2016-3-29 0:00: | PL | No Violations | 1.00 |
-568840210 | 2017-10-17 0:00 | PL | No Violations | 1.00 |
0568840210 | 2017-10-17 | Preliminary Restoration | No Violations | On the day of my inspection I found the pad two contain two plunger lift wells. No pressure or surface or intermediate casings. Production equipment includes two gpss, condensate heater, seven 400 barrel steel production tanks, and a vapor recovery system. Tanks are in steel containment. Site passes preliminary restoration per ORC 1509.072A. |
1277969275 | 2014-12-05 | Casing String Witnessed | No Violations | On the day of my inspection I found that Highlands Drilling rig 14 had drilled a 17.5 hole to a depth of 375, where they ran new 13.375 casing. Baker Hughes attempted to cement the casing to surface with 686 sacks of cement. Good circulation was established and maintained throughout the job. Cement was not circulated to surface. Chevron was ordered to have a cement bond log ran on the well and grout the casing to surface. |
1417528039 | 2014-12-02 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Highland Drilling is moving equipment on location and are preparing to start drilling operations. They hope to be completed with rig up and start spudding on Thursday 12/4/2014 |
1417759210 | 2014-12-03 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found the crew continuing to move in equipment and rigging up to start drilling. |
1418950871 | 2014-12-18 | Casing String Witnessed | No Violations | On the day of my inspection I found Highland Rig 14 installing 550 feet of 13 3/8 inch casing. Baker-Hughs will be doing the cementing. Established circulation but did not see cement returns to surface. Ran a tempture log to determine the cement top. |
1419348412 | 2014-12-23 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that the rig had installed 2490 feet ot 9 5/8 inch casing and cemented the casing back to surface. Established circulation and circulated 24 bbls of good cement back to surface. They are shutting down today until January 2015. company personal will be on location the entire time, until they resume operations. |
1423150513 | 2015-02-04 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Nabors Rig X07 has reached a depth of 13932 feet. I completed a site inspection and found no issues or violations. |
1423494759 | 2015-02-09 | Drill / Deepen / Reopen | No Violations | Upon arrival on location I found that the well has been TD to the depth of 15699 feet. 5.5 inch casing has been run an cemented by Baker-Hughes. Crew will be walking the rig to the well 34-067-2-1414. |
1725050351 | 2016-03-29 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted well is producing off of natural reservoir pressure. RBDMS indicated that the well is in producing order.
The production equipment on the pad consists of the following: 9 400 bbl. Production tanks 2 Producing wells 2 Sand separators 1 Low Pressure Separator 1 Combustor 1 Line Heater The site passed preliminary restoration in accordance with ORC 1509.072 A. |
2117290743 | 2020-3-17 0:00: | PW | No Violations | 1.00 |
For data sources see[8]