Well Details

Well ID: 34-067-21315
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Moorefield Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-000902
Farm/Lease Name: RH HAMILTON S MRF HR
License Status: Producing
License Date: 2014-03-18
Spud Date: 2014-08-12
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date:
Well Total Depth: 15208.00 ft
Configuration: Horizontal
Latitude: 40.220000
Longitude: -81.170000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-03-18 Proposed Formations:POINT PLEASANT, Issued Date:3/18/2014, Expired Date:3/17/2016 12:00:00 PM, Drilling unit acres:757.561, Proposed Well Type:OG, Proposed Well Class:EOUT
Correction to Well 2015-01-16 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE UPDATED.
Change of Owner 2015-08-19 Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 9520, ASCENT RESOURCES UTICA LLC
Construction Permit Expires 2016-03-17
Completion Report Received 2016-05-19
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-05-19 8336 15019 0
8336 15019 0
8336 15019 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/27/2015 10/05/2015 8161 7,045,710.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FRW-900 FTSI Friction Reducer Sorbitan, mono-(9Z)-9-octadecenoate 1338-43-8 5 0.00275878 1850.65
Anionic polymer 25085-02-3 40 0.0220702 14805.2
Oxyalkylated alcohol A Proprietary 5 0.00275878 1850.65
Sodium Hydroxide 1310-73-2 23 0.0126904 8513.01
Water 7732-18-5 40 0.0220702 14805.2
Alkyl Alcohol Proprietary 10 0.00551756 3701.31
Water 7732-18-5 55 0.0303466 20357.2
Sodium chloride (NaCl) 7647-14-5 5 0.00275878 1850.65
Hydrotreated Light Distillate 64742-47-8 30 0.0165527 11103.9
Water Operator Carrier Water 7732-18-5 100 96.1089 64,472,100.0
Hydrochloric Acid (HCl) FTSI Acid Water 7732-18-5 63 0.973723 653196
Hydrogen Chloride 7647-01-0 37 0.571869 383623
ICI-3240 FTSI Biocide Sodium Hydroxide 1310-73-2 23 0.00554437 3719.29
Dazomet (Tetrahydro-3, 5-dimethyl-2H-1,

3, 5-thiadiazine-2-thione.

533-74-4 24 0.00578543 3881
Water 7732-18-5 55 0.0132583 8893.96
HVG-1 4.0 FTSI Water gelling agent Quartz 14808-60-7 4 0.000190467 127.77
Guar gum 9000-30-0 50 0.00238084 1597.12
Raffinates, Sorption Process 64741-85-1 55 0.00261892 1756.83
Isotridecanol, ethoxylated 9043-30-5 2 0.00009523 63.88
LTB-1 FTSI Breaker Ammonium Persulfate 7727-54-0 84 0.00009016 60.48
Cured acrylic resin 25085-19-2 22 0.00002361 15.84
Talc 14807-96-6 0.6 0.00000064 0.43
FE-200L FTSI Iron Control Sodium Hydroxide 1310-73-2 2 0.000180004 120.75
Sodium formate 141-53-7 0.6 0.00005400 36.23
Trisodium Nitrilotriacetic acid 5064-31-3 2 0.000180004 120.75
Tetrasodium EDTA 64-02-8 41 0.00369009 2475.4
Iminodiacetate disodium salt 17593-73-6 0.2 0.00001800 12.08
Water 7732-18-5 60 0.00540013 3622.54
Ethylenediaminetriaceticacid, trisodium salt 19019-43-3 0.8 0.00007200 48.3
Sodium glycolate 2836-32-0 1.5 0.000135003 90.56
CI-150 FTSI Acid Corrosion Inhibitor Fatty Acid Salt Proprietary 0.1 0.00000137 0.92
Aliphatic alcohol Proprietary 0.1 0.00000137 0.92
Organic amine resin salt Proprietary 30 0.000410719 275.52
Aromatic aldehyde Proprietary 10 0.000136906 91.84
Diethylene glycol 111-46-6 1 0.00001369 9.18
Alkylene Oxide Block Polymer Proprietary 10 0.000136906 91.84
Fatty Acid Proprietary 0.1 0.00000137 0.92
Ethylene Glycol 107-21-1 30 0.000410719 275.52
Dimethylformamide 68-12-2 10 0.000136906 91.84
Quaternary ammonium compound Proprietary 10 0.000136906 91.84
Isopropanol 67-63-0 30 0.000410719 275.52
Water 7732-18-5 5 0.00006845 45.92
30/50 White FTSI proppant Silica, Quartz 14808-60-7 100 8.85785 5,942,060.0
100 Mesh Sand FTSI proppant Silica, Quartz 14808-60-7 100 1.8693 1,253,970.0
CS-250 SI FTSI Scale Inhibitor Water 7732-18-5 81 0.029938 20083.1
Sodium Polyacrylate 9003-04-7 10 0.00369605 2479.4
Sodium chloride 7647-14-5 6 0.00221763 1487.64
Ethylene glycol 107-21-1 10 0.00369605 2479.4
APB-1 FTSI Gel breaker Ammonium Persulfate 7727-54-0 100 0.000107331 72

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-10-05 H2O 0 4351 Bbl 199522 STAGE 39/39

30 SHOTS

2020-07-21 H2O 0 4974 Bbl 200669 STAGE 1/39

30 SHOTS STAGES 2-38 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 ASCENT RESOURCES UTICA LLC 38341 5531 19
2016 ASCENT RESOURCES UTICA LLC 509066 41337 341
2017 ASCENT RESOURCES UTICA LLC 267519 15420 365
2018 ASCENT RESOURCES UTICA LLC 194793 8145 365
2019 ASCENT RESOURCES UTICA LLC 41147 1436 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ASCENT RESOURCES UTICA LLC Brine 4444 19
2016 ASCENT RESOURCES UTICA LLC Brine 19860 341
2017 ASCENT RESOURCES UTICA LLC Brine 7768 365
2018 ASCENT RESOURCES UTICA LLC Brine 4152 365
2019 ASCENT RESOURCES UTICA LLC Brine 871 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1471312704 2014-8-18 0:00: DD No Violations 0.50
-1668095511 2016-1-5 0:00:0 PW No Violations 0.50
-506209707 2014-8-21 0:00: DD No Violations 1.50
-979420332 2014-8-23 0:00: CS No Violations 5.50
0301211061 2018-12-13 Production Wells No Violations On the day of my inspection I was accompanied by Deputy Chief Bob Worstall and Inspector John Fleming. This pad contains nine properly labeled producing wellheads utilizing a plunger lift system. Production equipment includes eight 500 barrel steel tanks in their own polymer lined steel containment, nine GPUs, nine sand seperators, three horizontal dehydrators, a compressor, and a vapor recovery unit. Surface annular pressure is 0 and intermediate annular pressure is 150. Production records are current in RBDMS.
0385299059 2014-08-22 Casing String Witnessed No Violations On the date of inspection I was informed by the company man on site, Cecil Lovel, that the Patterson 256 drilled a 12.25 inch diameter hole was drilled to a depth of 7,121 feet. 9.625 inch casing weighing 40.0 lbs/ft was set on bottom. O-Tex Pumping, LLC pumped a lead cement of 640 sks low density cement at 12.0ppg, 2.15 yield, 5% Gypsum, 1% C-15, 0.6% C-20, 0.4% C-41P, 0.1% C-51. O-Tex then pumped a tail cement consisting of 210 sks Premium Class H with a weight of 15.3ppg, yield of 1.27, 5% KCl, 0.6% C-12, 0.4% C-41P, 0.1% C-51, 0.1% C-35. The total displacement was 535.6bbl of KCl water. The plug was not bumped. Held pressure for 5 minutes, floats held. Weatherford then opened the diversion tools at 3800 feet and began to circulate.
0499837988 2014-08-20 Drill / Deepen / Reopen No Violations I am on site today with Inspector Brandon Trigg and while waiting for a conductor cement job on this location we found chlorides in the 400 to 500 PPM range near the chemical containment area. The duck pond containment was broken down on 2 sides and rain had floated the chemicals in the open bags out to the secondary area of containment. One of the rig hands was pumping the rain water out of this area when we stopped him and had them pump the fluids into the holding tanks because of the chlorides. I met with Cecil the company man and had him make repairs to the chemical duck pond and to some to the main containment near the front of the rig where it has been torn.
0506209707 2014-08-21 Drill / Deepen / Reopen No Violations I am on site today with Supervisor Rocky King. We found that Patterson Drilling Rig # 256 is at 7000 ft. on the 12-1/4 inch diameter section of the well. They should be ready later tonight to run 9-5/8inch diameter casing and cement with a two stage DV Tool.
0979420332 2014-08-23 Casing String Witnessed No Violations
1391990567 2016-01-05 Preliminary Restoration No Violations On the day of my inspection accompanied by Inspector Doug Bennett, I witness the well head is equipped with a production tree with valves in the open position. The production equipment included a sand trap and a GP unit. Also present were 3 stabilizer units, 2 line heaters, 2 compressor units, 3 NGL tanks, 2 combustors, 8- 500bbl condensate tanks and 4-500bbl brine tanks all within proper containment. This equipment is shared with the 7H, 5H, 3H, 1H, 2H, 4H, 6H and 8H. The site passed preliminary restoration in accordance with ORC 1509.072 A.
1407967630 2014-08-13 Casing String Witnessed No Violations I am on site today to witness the running and the cementing of the 13-3/8 inch diameter casing string. Patterson Drilling Rig # 256 drilled a 17.5 inch diameter hole to 933 ft. and set 933 ft. of casing. O-Tex Cementing Service cemented with 990 sacks of class H cement at 15.6 lbs. and a yield of 1.20 and had 39 bbls of cement returns to surface.
1408626654 2014-08-12 Drill / Deepen / Reopen No Violations Met today with Stan Cherry per his request to make changes to the permit which was issued. They want to revise the casing program to be able to set the surface casing to 1000 ft and the intermediate casing to 7200 ft. which they have done on the last two wells.
1443715087 2015-10-01 Production Wells No Violations I received a call from Assistant Chief Scott Kell to advised me that a seismic event has taken place on the Hamilton Pad. Scott ask me to find out exactly what was taking place on that pad around 10 A.M. I arrived on the Hamilton Pad and found that there is a frack operation set up and ongoing. I met with Company Man Eric Boone who is in charge of the frack operation Mr. Boone advised me that they have just finished the frack on stage 20 of the # 10 well. I advised him of the event and he was unaware that a seismic event had occurred. He told me that Matt Warner is in charge of any information pertaining to seismicity and that Matt was in Oklahoma City. Eric said that he will contact Matt to advise him. He is to contact Assistant Chief Scott Kell to bring both groups information into synchronicity.
1451595710 2016-03-01 Preliminary Restoration No Violations This well is in production and meets the requirements for the preliminary restoration. This is one of 9 wells in operation on this pad and has proper identification. To see a list of the production equipment see report # 1366
1471312704 2014-08-18 Drill / Deepen / Reopen No Violations On the date of inspection I accompanied ODNR Inspector Mark Moreland to check the status of when the two stage intermediate casing string would be cemented. Refer to Mark Morelands report for further details.
1668095511 2016-01-05 Production Wells No Violations On the day of my inspection I accompanied ODNR Inspector Joe Zollars please refer to his report for details.
1700640355 2020-2-4 0:00:0 PW No Violations 1.00
301211061 2018-12-13 0:00 PW No Violations 1.00
385299059 2014-8-22 0:00: CS No Violations 7.50
499837988 2014-8-20 0:00: DD No Violations 3.00

For data sources see[10]