34-067-21261

Well Details

Well ID: 34-067-21261
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Moorefield Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-000825
Farm/Lease Name: MICHAEL
License Status: Producing
License Date: 2013-11-06
Spud Date: 2013-11-24
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2014-01-08
Well Total Depth: 17701.00 ft
Configuration: Horizontal
Latitude: 40.190000
Longitude: -81.170000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-11-06 Proposed Formations:POINT PLEASANT, Issued Date:11/6/2013, Expired Date:11/6/2015 12:00:00 PM, Drilling unit acres:524.362, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-01-08
Completion Report Received 2014-12-02
Construction Permit Expires 2015-11-06
Record Last Modified 2017-10-24

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/30/2014 02/07/2014 8311 10,854,900.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 IC-250 Stingray Corossion Inhibitor Water 7732-18-5 80 0 0
Proprietary polycarboxylic acid mixture Not Available 20 0 0
Entegrate SC8060 WB U.S. Water Scale Inhibitor Aminotrimethylene Phosphonic Acid 6419-19-8 10 0.00095 0
Water 7732-18-5 59 0.00561 0
Methyl Alcohol 67-56-1 20 0.0019 0
2-propenoic acid, sodium salt, polymer 37350-42-8 10 0.00095 0
Phosphoric Acid 7664-38-2 1 0.0001 0
100 mesh Minerva/Cadiz Proppant Sand 14808-60-7 100 0.4728 0
Entegrate NE 1100 U.S. Water Demulsifier Ethylene/Propylene Oxide Polymer Not Available 40 0.01923 0
Water 7732-18-5 60 0.02885 0
BioClear 5000 Weatherford Biocide Water 7732-18-5 95 0.02338 0
2,2-dibromo-3-nitril oprop ionam ide 10222-01-2 5 0.00123 0
FRA-405 Weatherford Friction Reducer Ammonium chloride 12125-02-9 7 0.00499 0
Alcohol, C12-16, Ethoxilated 68551-12-2 7 0.00499 0
Sodium Chloride 7647-14-5 10 0.00712 0
Petroleum Distillate 64742-47-8 40 0.02849 0
Water 7732-18-5 36 0.02564 0
PROCLEAN 200 U.S. Water Corossion Inhibitor Water 7732-18-5 48 0.00073 0
Citric Acid, Food Grade 77-92-9 52 0.00079 0
30/50 White Minerva/Cadiz Proppant Sand 14808-60-7 100 0 0
Entecide QG40 U.S. Water Breaker ETHANOL 64-17-5 2.8 0 0
GLUTARALDEHYDE 111-30-8 27 0 0
DIDECYL DIMETHYL AMMONIUM CHLORIDE 7173-51-5 8.3 0 0
Water 7732-18-5 56.4 0 0
n-ALKYL DIMETHYL BENZYL AMMONIUM CHLORIDE 68424-85-1 5.5 0 0
Clean Gel Stingray Guar Gel heavy aliphatic Not Available 35 0 0
Solvent naphtha, (petroleum) 64742-96-7 65 0 0
Entegrate FR 7170 U.S. Water Friction Reducer Petroleum distillate hydrotreated light 64742-47-8 28 0.00615 0
C12-C14 Alcohol ethoxylated 68439-50-9 3.1 0.00068 0
Ammonium chloride 12125-02-9 15 0.00329 0
Water 7732-18-5 48 0.01054 0
Alcohols (C10-16), ethoxylated 68002-97-1 3.1 0.00068 0
Alcohols (C12-16), ethoxylated 68551-12-2 3.1 0.00068 0
X-linker Stingray Guar Gel Ethylene Glycol Not Available 30 0 0
Water 7732-18-5 70 0 0
40/70 White Minerva/Cadiz Proppant Sand 14808-60-7 100 11.2199 0
Citric Acid 50% Pace International Acid Water 7732-18-5 50 0.13606 0
citric acid 77-92-9 50 0.13606 0
Fresh water Stingray Carrier Water 7732-18-5 100 88.089 0
Per Break Stingray Breaker Ammonium Persulfate 7727-54-0 99 0 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-01-30 H2O 0 0 Gal 0 STINGRAY PRESSURE PUMPING LLC STAGE 1/31

45 SHOTS STAGES 2-30 SEE IMAGES

H2O 15 0 Gal 0 STINGRAY PRESSURE PUMPING LLC STAGE 31/31

45 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 GULFPORT ENERGY CORPORATION 1606933 91677 299
2015 GULFPORT ENERGY CORPORATION 1171640 27203 348
2016 GULFPORT ENERGY CORPORATION 785959 15424 365
2017 GULFPORT ENERGY CORPORATION 501837 9612 363
2018 GULFPORT ENERGY CORPORATION 390432 6998 359
2019 GULFPORT ENERGY CORPORATION 81946 1229 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 GULFPORT ENERGY CORPORATION Brine 14315 299
2015 GULFPORT ENERGY CORPORATION Brine 4518 348
2016 GULFPORT ENERGY CORPORATION Brine 2557 365
2017 GULFPORT ENERGY CORPORATION Brine 2034 363
2018 GULFPORT ENERGY CORPORATION Brine 1416 359
2019 GULFPORT ENERGY CORPORATION Brine 270 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-126178709 2013-11-27 0:00 DD No Violations 4.00
-1359994553 2014-1-6 0:00:0 DD No Violations 1.50
-146333269 2014-1-13 0:00: DD No Violations 1.00
-1657015770 2013-12-2 0:00: DD No Violations 1.00
-1687065834 2013-12-16 0:00 DD No Violations 1.50
-2048172036 2015-7-7 0:00:0 PW No Violations 4.00
-251440307 2013-12-2 0:00: DD No Violations 1.50
-415459161 2014-1-13 0:00: DD No Violations 3.50
-484790533 2013-12-10 0:00 DD No Violations 1.50
-531715855 2013-12-13 0:00 DD No Violations 2.00
-533536183 2019-12-9 0:00: PW No Violations 1.00
-837081175 2014-1-21 0:00: PL No Violations 1.50
0126178709 2013-11-27 Drill / Deepen / Reopen No Violations Auger Drilling rig is on site and they are broke down at this time. Return after they were able to get casing in the well at 110 ft and now wait on cement trucks. Trucks did not arrive as scheduled and after a few hours I did not stay because I did not know how long it would be before the trucks arrived.
0146333269 2014-01-13 Drill / Deepen / Reopen No Violations I received a call Sunday evening from Chris Anderson who advised me that an oil sheen was witnessed in the left corner sump in the 12 inch casing. He said that they did not know what or how and that it was only a trace floating on the top of the water in the sump. I contacted Doug Bennett and relayed that information and I am on site today to check how much is floating on the surface. I found that it was not solid and only a trace was observe red. I contacted Doug and advised him what I had found . He said that he is going to collect a sample to check for chlorides and see if a sample for the lab is needed.
0190813857 2013-12-24 Drill / Deepen / Reopen No Violations On the day of my inspection Sidewinder Drilling Rig #121 was mist drilling with an 8.75 inch diameter bit at 6133 feet continuing to their lateral KOP of 7300 feet. Site inspection revealed that rain water has been removed and containments were in good shape with no violations.
0251440307 2013-12-02 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that conductor pipe has been set and secondary containment was in place with berms being built upon arrival. Site inspection revealed that the pad liner had been torn during snow removal and request was made to containment crew to repair liner once berms were built and before rig was moved to site.
0415459161 2014-01-13 Drill / Deepen / Reopen No Violations On the day of my inspection Sidewinder Drilling rig #121 has begun to rig down with moving to take place to the Milliken Pad on Wednesday. Wyoming casing crew set 17701 feet of 5.5 inch production casing and CalFrac cemented the casing with 112 sacks of scavenger 50/50 cement, 1256 sacks of 50/50 cement and 2268 sacks of Class H cement. During displacement lost circulation at 285bbls of 374bbls. I discussed the job with Company Man Dean Cook and Drilling Engineer Carter Layfield and expressed concerns for top of cement, Carter stated that a cement bond log would be run before completing the well. I took a water sample out of the northeast sump on request from ALL Consulting due to oil sheen on the top. Upon testing sample chlorides were normal and PH was 6. Also took an absorbent pad and retrieved no noticeable oil on the pad. Upon further site inspection revealed no violations.
0484790533 2013-12-10 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that the rig move from the Gustina Bear Pad is complete with final rig up underway. Met and discussed upcoming casing program with Gulfport Company Man Dean Cook. Rig should spud tomorrow with surface casing to follow. Site inspection revealed no violations.
0531715855 2013-12-13 Drill / Deepen / Reopen No Violations I am on site today to check on the drilling status of the Nabors Drilling Rig # X07 and found them rigging down for repairs to the sub soil below the drilling rig. Conference with Blake Arthur and Ron Trivisonno about the repairs which would need submitted to the Division. Chevron has 3 Soil Engineers which will review the soil information and submit a remedial repair plan to Ron Trivisonno to review and approve before drilling continues.
0645574738 2013-11-22 Drill / Deepen / Reopen No Violations The drilling rig has not arrived on site but there is equipment moving in along with trucks.
0837081175 2014-01-21 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to 1509.072A. Gulfport plans to do a cement bond log on well due to losing returns on production casing job then frac well later this week.
1038373750 2015-07-28 Production Wells No Violations I am on site today to review a condensate spill which occurred on July 6 -2015. The inspection date was on July 7- 2015. The excavated material which was stored in 3 roll off containers from that date has been removed to a landfill. The area has been back filled and graded. The clean up of this site is complete and the wells are back in operation.
1237703165 2017-09-06 Production Wells No Violations On the day of my inspection I found this was the only well on the pad. Well is not showing any pressure on surface or intermediate casing. Production equipment includes five 400 steel condensate tanks, one 500 barrel steel condensate tank, three 400 barrel steel brine tanks, one 50 barrel steel brine tank, gas production unit, vertical heater treater, and vapor recovery system, and combustor. All tanks are enclosed in an steel dike. Production is current in RBDMS.
1359994553 2014-01-06 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Sidewinder Drilling Rig #121 was at 16127 feet and had lost circulation. The second LCM pill had just been released and being displaced trying to locate and heal the thieving formation. When circulation is regained will continue drilling to an estimated TD of 17700 feet with 5.5 inch production casing to follow.
1385386434 2013-11-25 Drill / Deepen / Reopen No Violations I am on site today to check on the drilling status. Redstone Drilling is drilling the conductor hole and should be ready today to cement the conductor today.
1385477027 2013-11-25 Drill / Deepen / Reopen No Violations I returned to check on the drilling status of Redstone Drilling. During my inspection in the morning I discovered that they had encountered a void at 30 to 34 ft which was not known as to what it was. They thought that it may just be a bolder or fill space in an old mine site. They used 7 yards of grout cement to try and fill and stabilize the void. It did not fill it up and another 7 yards of grout cement was ordered. I was on site during the grout job and it did not fill the void in. I contacted our Columbus office and found that the location is 1000 ft from an old coal mine. I think that the void is an auger hole not a mine shaft. I advised Nick Beresman that he could place a 30inch diameter joint of casing in the well and cement it up the back side of the casing. Then they could drill and set the conductor as normal and cement it to surface. Nick said that he would try one more load of cement grout to fill it in. Nick called me later and informed me that the grout had filled in the void and he would core drill the cement in the void and contact me when he was ready to set conductor.
1385488424 2013-11-26 Drill / Deepen / Reopen No Violations I arrived today to check on the drilling status of the conductor hole. I found that Redstone Drilling is at 38 ft drilling what they said is new material and what looked like cement to me. They could set casing later today or tonight. The weather is going to be a problem as the snow continues to fall. Nick Beresman is to call when they get ready to cement casing.
1387029810 2013-12-14 Casing String Witnessed No Violations

-55 casing. Stingray Cementing LLC was on site and gained circulation 10bbls of fresh water, 25bbls of gel, 10bbls of fresh water and cement casing with 554 sacks of Class A, 15.6lbs/gal., 1.19cu.ft/sk., 5.2gal/sk. Had good returns of 3bbls and plug landed and pressured up to 697psi and held for 5 minutes.

1388441220 2013-12-30 Drill / Deepen / Reopen No Violations On the day of my inspection Sidewinder Drilling Rig #121 was drilling with an 8.5 inch diameter bit at 9904 feet in their lateral with and estimated td of 17700 feet. Site inspection revealed no violations.
1426506422 2015-03-03 Production Wells No Violations My inspection of this facility revealed no leaks or spills. The production tanks are inside a lined dike that appears to be liquid tight. The well has a tree in place and production continues through line heaters and separators with a flare stack. There are also solar panels in place to operate the well using telemetry.
1436360647 2015-07-06 Production Wells No Violations I received a call from Brad Burwell around 3:15 PM on Monday 7/06/2015 to inform me that a 20 gallon condensate spill had occurred. The seal on the sight glass tube developed a leak and allowed condensate to mist under pressure around the Vertical Heater Treater. It placed a mist around the Heater Treater in a 20 ft. circle with more going toward the north due to wind. Brad told me that he had equipment mobilized to respond to the spill and that if they could they would begin before dark. He advised that the spill was mostly mist and in the middle of the pad with no chance of it to get off site. They also had vacuum trucks rolling toward the site and would be able to vacuum any liquids before they could move off site. I contacted Supervisor Brent Bear to advise.
1443184761 2015-09-24 Production Wells No Violations At 1:30 PM Brad Burwell of Gulfport Energy called me to advise me that a fire had occurred on the Michaels Pad and that the fire was out. The fire occurred on the emergency flare stack. He said that the fire dept. had not been called because they were able to close the valves on the system which stopped the fire. I notified Region Supervisor Brent Bear and Scott King about the fire. Next I responded to the fire site and found that the fire was out and everything had been contained on site. The fire was caused after the compressor had been serviced. The hydraulic oil had been changed and drained into the low pressure vapor recovery system. That system has a dump line which was where the oil was intended to go. There is a check valve on the low pressure vapor recovery separator that failed. It allowed the oil to be sent to the vapor recovery flare stack instead of the dump side. The hydraulic oil mixed with low levels of condensate and was ignited by the flare. It cascaded down the flare stack to the ground and continued to burn until the valves on the system were closed. The fire then burned itself out. There is about 1/2 gallons of hydraulic oil on the ground which needs cleaned up and removed. The fire did not do any damage to the flare and after the lines have been cleared of fluid can be placed back in operation. There has been another check valve added to this system as a back up to keep it from happening again. Also the valve which failed should be replaced. The field people on site for Gulfport were James Noyes and Andy Baker along with Brad Burwell.
1478036294 2015-09-25 Production Wells No Violations I returned to this site to follow up on the fire and clean up which occurred on 9/24/2015 I met on site with Andy Baker Gulfports pumper for this well. I found that the hydraulic oil has been cleaned up and removed to a roll off container on site. The check valve which failed has been replaced and the line from the low pressure separator to the flare has been vacuumed clear of fluid. The wells are scheduled to be back on line by noon today. All of the clean up and repairs have been completed.
1623479940 2013-11-21 Drill / Deepen / Reopen No Violations I am on site today to check on the drilling rig which was to move in today. The rig has not arrived and there are only a few people on site. I spoke with those people on site and found out the rig has had some moving problems with the permit and will move after they are corrected.
1657015770 2013-12-02 Drill / Deepen / Reopen No Violations Containment and mat are being placed on the pad prior to drilling. There is not a drilling rig on site at this time but the site could have a rig move in after the containment is set up.
1687065834 2013-12-16 Drill / Deepen / Reopen No Violations
1842039087 2014-03-08 Completion Testing No Violations On the day of my inspection I witnessed that flow back operations are completed and production equipment construction is finalized with plans to go online later today. Completed walk around with Company Man Dan Heady.
1907650173 2013-12-04 Drill / Deepen / Reopen No Violations Sidewinder Drilling Rig # 121 is moving in today. The containment is down and there is plastic on top of the liners.
190813857 2013-12-24 0:00 DD No Violations 1.50
2048172036 2015-07-07 Production Wells No Violations I arrived on site today to find that a clean up crew has removed 3 roll off containers full of contaminated rock and soil. The roll off containers are 15 cubic yards each for a total of 45 yards of material. The containers are covered and the condensate contaminated material will remain on site until the samples of the contaminate are confirmed. The area around the Vertical Heater Treater has be excavated and clean fill along with new limestone put back and graded. The repairs to the sight tube and valves have been made and the well will be back on line this evening. Hal Miller is on site for Gulfport and has used a new PID meter to screen the soils and excavated material. The clean up is complete at this time and Hal and myself used the meter in and around a large area to confirm the condensate has been removed.
645574738 2013-11-22 0:00 DD No Violations 1.00

For data sources see[9]

References