If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21233 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.36,"lon":-81.07,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Archer Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001016 | |
Farm/Lease Name: KLODT 29-11-5 | |
License Status: Producing | |
License Date: 2014-12-18 | |
Spud Date: 2014-12-20 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2015-02-13 | |
Well Total Depth: 17780.00 ft | |
Configuration: Horizontal | |
Latitude: 40.360000 | |
Longitude: -81.070000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-08-23 | Proposed Formations:TRENTON /BLACK RIVER, Issued Date:8/23/2013, Expired Date:8/23/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2014-12-18 | Proposed Formations:POINT PLEASANT, Issued Date:12/18/2014, Expired Date:12/17/2016 12:00:00 PM, Drilling unit acres:1245.1, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-02-13 | |
Correction to Well | 2015-09-04 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-02-11 | |
Construction Permit Expires | 2016-12-17 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-02-12 | 8398 | 17580 | 0 |
8398 | 17580 | 0 | |
8398 | 17580 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/12/2015 | 07/22/2015 | 8092 | 8,202,350.0 | 721909 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | TS-30 | X CHEM | Scale Inhibitor | Proprietary Sodium Polycarboxylate | TRADE SECRET | 100 | 0.00877 | 0 |
Water | 007732-18-5 | 0 | 0.01049 | 0 | ||||
A264, B244, B317, J218, J475, J580,
J609, J610, L058, Acid, Hydrochloric 7.5pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 15.8281 | 0 | |
Aliphatic alcohols, ethoxylated # 1 | NA | 30 | 0.00043 | 0 | ||||
Trisodium Ortho Phosphate | 007601-54-9 | 5 | 0.00028 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.0027 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 5 | 0.00028 | 0 | ||||
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00014 | 0 | ||||
Ammonium Sulfate | 007783-20-2 | 30 | 0.00978 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00055 | 0 | ||||
Sodium Erythorbate | 006381-77-7 | 100 | 0.00048 | 0 | ||||
Glutaraldehyde (Pentanediol) | 000111-30-8 | 25 | 0.00234 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 0.55464 | 0 | ||||
Aliphatic acid | NA | 30 | 0.00043 | 0 | ||||
Aliphatic amine polymer | NA | 30 | 0.00978 | 0 | ||||
Water | 007732-18-5 | 93 | 0.84187 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 40 | 0.00058 | 0 | ||||
Carbohydrate polymer | NA | 100 | 0.0814 | 0 | ||||
Hydrochloric Acid | 007647-01-0 | 8 | 0.06826 | 0 | ||||
Potassium Hydroxide | 001310-58-3 | 15 | 0.00704 | 0 | ||||
Aliphatic polyol | NA | 30 | 0.01408 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 0.07419 | 0 | |
Chlorine Dioxide | TERRA SERVICES | Anti-Bacterial Agent | Chlorine Dioxide | 010049-04-4 | 100 | 0.00377 | 0 | |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 82.4393 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-07-12 | H2O | 0 | 5000 Bbl | 333300 | Schlumberger | STAGE 1/41
40 SHOTS STAGES 2-40 SEE IMAGES |
2015-07-22 | H2O | 0 | 4339 Bbl | 329240 | Schlumberger | STAGE 41/41
40 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | 190924 | 20774 | 69 |
2016 | CHESAPEAKE EXPLORATION LLC | 716500 | 45957 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 367234 | 15842 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 208698 | 7243 | 320 |
2019 | CHESAPEAKE EXPLORATION LLC | 58184 | 2206 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 6919 | 69 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 14066 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 9135 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 5067 | 320 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 1435 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1861336807 | 2014-12-20 0:00 | CS | No Violations | |
-499942247 | 2015-2-10 0:00: | DD | No Violations | 3.00 |
-757790406 | 2019-8-16 0:00: | PW | No Violations | 0.50 |
-846893003 | 2015-2-13 0:00: | DD | No Violations | 1.00 |
0499942247 | 2015-02-10 | Drill / Deepen / Reopen | No Violations | I was on location to check the drilling status of Nomac Rig #73. They have reached the landing point of 8,586 and are currently drilling the 8.5 lateral at a total measured depth of 9,421. They mudded up at 7,245 and expected total measured depth is 17,824. All drilling equipment is on containment and the location is in good condition. No violations. |
0846893003 | 2015-02-13 | Drill / Deepen / Reopen | No Violations | I was on location to check the drilling status of Nomac Rig #73. The rig is currently drilling the 8.5 lateral at a total measured depth of 16,978 and should reach total depth tomorrow (2/14/15). All equipment is on containment and the location is in good condition and icy. No violations. |
1533892403 | 2015-02-01 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the 13.375 surface casing. Nomac Rig #73 spudded the surface hole on 02/01/15, drilled a 17.5 hole to a depth of 531, and Wyoming Casing ran surface casing to a depth of 521. O-Tex rigged up, tested the lines, and pumped 30 barrels of gel and 10 barrels of water ahead of the slurry. They then mixed and pumped 102 barrels of cement slurry, dropped the plug, and displaced the plug to the collar with 74 barrels of water. The plug landed at 250psi and the pressure was increased to 750psi and held for 5 minutes. The pressure was released, and the floats held with 0.5 barrels flowing back to the truck. 14 barrels of cement circulated to surface and weighed 15.5lbs/gal on the pressurized scales. See casing ticket for more details on this job. No violations. |
1794594137 | 2016-02-18 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells are producing off of natural reservoir pressure. RBDMS production records indicate that the wells are in producing order.
The production equipment on the pad consists of the following: 12 400 bbl. Production tanks 8 Producing wells 8 Sand separators 2 Horizontal heater-treaters 1 combustor 1 Low pressure separator tower/Vapor recovery system unit. 5 compressors There was approximately 2 to 3 inches of snow on location at the time of my inspection. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
1821323255 | 2016-01-11 | Preliminary Restoration | No Violations | On the day of my inspection, I witnessed the well was equipped with a production tree. Production equipment for the well included a sand trap, a gas production unit and a line heater. Production equipment that was shared with permitted wells 34067212280000, 34067212290000, 34067212300000, 34067212310000, 34067212320000, 34067214310000, and 34067214320000 included a vapor recovery system, 5 gas compressors, a gas combustor and 12-400 bbl. tanks that where placed inside proper containment. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
1861336807 | 2014-12-20 | Casing String Witnessed | No Violations | The Express rig drilled 120 of 26 hole this date and ran 120 of 20 casing. Express cementing cwemented it with 230 sacks of Class A cement. See the casing ticket for the details. |
For data sources see[10]