X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21187

Well Details

Well ID: 34-067-21187
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Londonderry Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-000719
Farm/Lease Name: MILLIKEN
License Status: Producing
License Date: 2013-07-02
Spud Date: 2013-06-21
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2014-03-19
Well Total Depth: 18447.00 ft
Configuration: Horizontal
Latitude: 40.170000
Longitude: -81.230000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-17 Proposed Formations:POINT PLEASANT, Issued Date:5/17/2013, Expired Date:5/17/2015 12:00:00 PM, Drilling unit acres:640, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2013-05-30 Proposed Formations:POINT PLEASANT, Issued Date:5/30/2013, Expired Date:5/30/2015 12:00:00 PM, Drilling unit acres:640, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2013-07-02 Proposed Formations:POINT PLEASANT, Issued Date:7/2/2013, Expired Date:7/2/2015 12:00:00 PM, Drilling unit acres:830.103, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-03-19
Completion Report Received 2014-12-02
Correction to Well 2015-01-16 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UPDATE TO UNIT SIZE.
Construction Permit Expires 2015-07-02
Record Last Modified 2017-10-24

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/10/2014 05/27/2014 7812 16,006,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BioClear 5000 Weatherford Biocide Water 7732-18-5 95 0.0234021 0
2,2-dibromo-3-nitril oprop ionam ide 10222-01-2 5 0.00123169 0
Breaker 3l Weatherford Breaker Sodium Chlorite 7758-19-2 5 0.000466347 0
Potassium Chloride 7447-40-7 10 0.000932694 0
Sodium Chloride 7647-14-5 40 0.00373078 0
Water 7732-18-5 45 0.00419712 0
Fresh water Stingray Carrier Water 7732-18-5 100 89.6157 0
Scale Clear 112 Weatherford Scale Inhibitor Water 7732-18-5 60 0.00610468 0
Proprietary Proprietary 40 0.00406979 0
Muriatic Acid Axiall, LLC Acid Water 7732-18-5 60 0.203489 0
Hydrogen chloride 7647-01-0 40 0.135659 0
TCA 6038F X-Chem, LLC Corossion Inhibitor Water 7732-18-5 80 0.00187107 0
Methanol 67-56-1 20 0.000467768 0
40/70 White Minerva/Cadiz Proppant Sand 14808-60-7 100 9.87811 0
FRA 405 Weatherford Friction Reducer Ammonium chloride 12125-02-9 7 0.00843968 0
Petroleum Distillate 64742-47-8 40 0.0482268 0
Alcohol, C12-16, Ethoxilated 68551-12-2 7 0.00843968 0
Sodium Chloride 7647-14-5 10 0.0120567 0
Water 7732-18-5 36 0.0434041 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-05-27 H2O 15 352228 Gal 410100 STINGRAY PRESSURE PUMPING LLC STAGE 41/41
2014-05-09 H2O 15 293664 Gal 221000 STINGRAY PRESSURE PUMPING LLC STAGE 1/41

40 SHOTS STAGES 2-40 SEE IMAGES

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 GULFPORT ENERGY CORPORATION 346620 32410 195
2015 GULFPORT ENERGY CORPORATION 312797 16628 351
2016 GULFPORT ENERGY CORPORATION 226602 9195 361
2017 GULFPORT ENERGY CORPORATION 177833 6312 355
2018 GULFPORT ENERGY CORPORATION 139168 4976 360
2019 GULFPORT ENERGY CORPORATION 30930 1046 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 GULFPORT ENERGY CORPORATION Brine 30724 195
2015 GULFPORT ENERGY CORPORATION Brine 6455 351
2016 GULFPORT ENERGY CORPORATION Brine 2647 361
2017 GULFPORT ENERGY CORPORATION Brine 1426 355
2018 GULFPORT ENERGY CORPORATION Brine 1313 360
2019 GULFPORT ENERGY CORPORATION Brine 185 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1416477917 2014-4-28 0:00: PL No Violations 1.00
-1621751031 2013-9-18 0:00: PW No Violations 1.00
-1858332860 2014-3-8 0:00:0 DD No Violations 6.00
-937401603 2014-4-18 0:00: DD No Violations 2.50
0028448084 2014-03-03 Drill / Deepen / Reopen No Violations
0181004073 2014-03-24 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Sidewinder Drilling Rig #121 was preparing for Great White to arrive on location and rig up their coil tubing unit and begin to drill out cement. Great White will drill out cement with a 4.5 inch diameter bit and if successful in reaching BOC, Sidewinder Drilling Rig #121 will try to break circulation and begin new cement job. If Great White does not reach BOC a completion rig will be brought in to finish job with new cement job to follow.
0355399731 2016-03-08 Preliminary Restoration No Violations I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells on site are producing off of a plunger lift sytem. Permitted well 34067211840000 has not been drilled. RBDMS indicated that the wells on site are in producing order.
The production equipment on the pad consists of the following:

8 400 bbl. Production tanks 3 Producing wells 3 Sand separators

3 Line heaters 1 Vapor recovery tower 1 combustor The site passed preliminary restoration in accordance with ORC 1509.072 A.

0937401603 2014-04-18 Drill / Deepen / Reopen No Violations Sidewinder Drilling Rig #121 completed scrapper runs and gained circulation on 5.5 inch production string. Ran and set packer at 7268 and successfully cemented 5.5 inch production casing. Sidewinder Drilling Rig #121 is currently tripping inside casing with scrapper tool. Upon completion will lay down drill pipe and begin to rig down.
1393879626 2014-03-03 Drill / Deepen / Reopen No Violations I accompanied Doug Bennett to site for status update inspection. Refer to Doug Bennetts inspection for further details.
1395582152 2014-03-23 Drill / Deepen / Reopen No Violations At 8:10AM I received a phone call from Sidewinder Drilling Rig #121 Company Man Greg Armstead and he stated during the production string cement job the crossover fitting between the casing and the cement head failed and the cement job went bad. No one was injured and that it was estimated that BOC was at 15400 feet and TOC was at 4200 feet all inside casing. A decision was being made at this time whether Sidewinder Drilling Rig #121 was going to drill out cement and try to break circulation and cement casing again or to rig down and bring in a completion rig. He would notify me later today on their decision.
1396273529 2014-03-31 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Sidewinder Drilling Rig #121 was drilling cement inside 5.5 inch production casing with 2.875 inch drill pipe and a 4.5 inch bear claw bit at 8115 feet. Top of cement was found at 4273 feet and estimating bottom of cement at 15400 feet. Site inspection revealed no violations.
1397739793 2014-04-17 Drill / Deepen / Reopen No Violations Sidewinder Drilling Rig #121 completed scrapper runs inside 5.5 inch production casing and gained circulation. TIH to set packer and upon completion will begin new production casing cement job later today.
1416477917 2014-04-28 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to 1509.072A.
1621751031 2013-09-18 Production Wells No Violations There is a service rig over the well today running tubing in the well. The containment liner for this operation appears to be in place and I did not discover any leaks during my inspection.
1664996512 2014-02-21 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Sidewinder Drilling Rig #121 had drilled a 9.875 inch diameter hole to the depth of 6940 feet and ran 6891 feet of 7.625 inch 29.7#/ft. L-80 2nd intermediate casing. Stingray completed a two-stage cementing job on the casing. Sidewinder Drilling Rig #121 is in the process of cleaning their pits and hauling off their water based mud for disposal. Once the water based mud has been removed from site they will bring in oil based mud and drill out their shoe and start building the curve.
181004073 2014-3-24 0:00: DD No Violations 2.00
1858332860 2014-03-08 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Sidewinder Drilling Rig #121 was drilling ahead on 11lb oil based mud with a 6.75 inch diameter bi at a depth of 13069 feet with a projected td of 18507 feet. Completed walk around with Company Man Dean Cook.
2073537431 2019-11-6 0:00: PW No Violations 1.00
28448084 2014-3-3 0:00:0 DD No Violations 3.00
355399731 2016-3-8 0:00:0 PL No Violations 0.50
48482229 2019-11-29 0:00 PW No Violations 1.00

For data sources see[9]

References