34-067-21186

Well Details

Well ID: 34-067-21186
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Londonderry Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-000719
Farm/Lease Name: MILLIKEN
License Status: Producing
License Date: 2013-07-02
Spud Date: 2013-06-21
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2014-02-06
Well Total Depth: 15224.00 ft
Configuration: Horizontal
Latitude: 40.170000
Longitude: -81.230000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-17 Proposed Formations:POINT PLEASANT, Issued Date:5/17/2013, Expired Date:5/17/2015 12:00:00 PM, Drilling unit acres:640, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2013-05-30 Proposed Formations:POINT PLEASANT, Issued Date:5/30/2013, Expired Date:5/30/2015 12:00:00 PM, Drilling unit acres:640, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2013-06-07 CORRECTION TO TARGET FOOTAGE
APP 2013-07-02 Proposed Formations:POINT PLEASANT, Issued Date:7/2/2013, Expired Date:7/2/2015 12:00:00 PM, Drilling unit acres:830.103, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2014-02-06
Correction to Well 2015-01-16 UPDATE TO UNIT SIZE FROM NEW PLAT.
Construction Permit Expires 2015-07-02
Completion Report Received 2016-04-29
Record Last Modified 2017-10-24

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/10/2014 05/24/2014 7782 11,094,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 TCA 6038F X-Chem, LLC Corossion Inhibitor Water 7732-18-5 80 0.00177248 0
Methanol 67-56-1 20 0.000443119 0
BioClear 5000 Weatherford Biocide 2,2-dibromo-3-nitril oprop ionam ide 10222-01-2 5 0.0012547 0
Water 7732-18-5 95 0.0238394 0
Breaker 3l Weatherford Breaker Water 7732-18-5 45 0.00424189 0
Potassium Chloride 7447-40-7 10 0.000942641 0
Sodium Chloride 7647-14-5 40 0.00377056 0
Sodium Chlorite 7758-19-2 5 0.000471321 0
Muriatic Acid Axiall, LLC Acid Water 7732-18-5 60 0.193377 0
Hydrogen chloride 7647-01-0 40 0.128918 0
FRA 405 Weatherford Friction Reducer Water 7732-18-5 36 0.0446934 0
Sodium Chloride 7647-14-5 10 0.0124148 0
Ammonium chloride 12125-02-9 7 0.00869039 0
Petroleum Distillate 64742-47-8 40 0.0496594 0
Alcohol, C12-16, Ethoxilated 68551-12-2 7 0.00869039 0
Fresh water Stingray Carrier Water 7732-18-5 100 90.156 0
40/70 White Minerva/Cadiz Proppant Sand 14808-60-7 100 7.20346 0
30/50 White Minerva/Cadiz Proppant Sand 14808-60-7 100 2.14699 0
Scale Clear 112 Weatherford Scale Inhibitor Water 7732-18-5 60 0.00621055 0
Proprietary Proprietary 40 0.00414036 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-05-24 H2O 28 403788 Gal 405753 STINGRAY PRESSURE PUMPING LLC STAGE 27/27
2014-05-10 H2O 28 246498 Gal 1500 STINGRAY PRESSURE PUMPING LLC STAGE 1/27

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 GULFPORT ENERGY CORPORATION 251057 26723 194
2015 GULFPORT ENERGY CORPORATION 233131 20185 346
2016 GULFPORT ENERGY CORPORATION 166876 13271 364
2017 GULFPORT ENERGY CORPORATION 138296 9328 352
2018 GULFPORT ENERGY CORPORATION 105769 7390 357
2019 GULFPORT ENERGY CORPORATION 23629 1564 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 GULFPORT ENERGY CORPORATION Brine 23152 194
2015 GULFPORT ENERGY CORPORATION Brine 6371 346
2016 GULFPORT ENERGY CORPORATION Brine 3086 364
2017 GULFPORT ENERGY CORPORATION Brine 1927 352
2018 GULFPORT ENERGY CORPORATION Brine 1235 357
2019 GULFPORT ENERGY CORPORATION Brine 162 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1507108294 2016-3-8 0:00:0 PL No Violations 0.50
-258309218 2013-10-15 0:00 PL No Violations 0.50
-39334218 2014-1-21 0:00: DD No Violations 1.50
-731380994 2013-6-26 0:00: CS No Violations 6.70
0039334218 2014-01-21 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Sidewinder Drilling Rig #121 is completely rigged up, completed BOP testing and currently tripping in the hole to drill out the shoe track with an 8.75 inch diameter bit at 2140 feet. Site inspection revealed no violations.
0258309218 2013-10-15 Preliminary Restoration No Violations The site passed preliminary restoration according to 1509.072A.
0610382373 2014-01-16 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Sidewinder Drilling Rig #121 is in the process of moving and rigging up. The rig move from the Michael pad is 1/3 done with plans to re-spud later this weekend.
0731380994 2013-06-26 Casing String Witnessed No Violations I am on site today to witness the running and the cementing of the 10-3/4 inch diameter casing string. Yost Drilling Rig # 9 has drilled a 14-3/4 inch diameter hole to 2160 ft. and set casing at 2150 ft. Stingray Cementing Service c/w 1350 sks of Class A @ 15.6 lbs and a yield of 1.18 During the run up to cementing a delivery truck broke its diesel fuel tank while driving over the flare stack ramp. A vacuum truck was pulling on site and the fuel was picked up before it could soak into the lease road.
1389631742 2014-01-13 Drill / Deepen / Reopen No Violations On the day of my inspection the pad reconstruction is complete. Secondary containment is being constructed, cellars are lined and the drill mats in place. Rig will be moving in later this week. I discussed with Carter Layfield Gulfport Drilling Engineer about the flair stack and simultaneous operations. Carter said that there would be no production on the pad while drilling is going on. Flair stack has been removed, capped and barricaded.
1392042624 2014-02-10 Drill / Deepen / Reopen No Violations

-4H this afternoon to complete the vertical section and the lateral.

1507108294 2016-03-08 Preliminary Restoration No Violations I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells on site are producing off of a plunger lift sytem. Permitted well 34067211840000 has not been drilled. RBDMS indicated that the wells on site are in producing order.
The production equipment on the pad consists of the following:

8 400 bbl. Production tanks 3 Producing wells 3 Sand separators

3 Line heaters 1 Vapor recovery tower 1 combustor The site passed preliminary restoration in accordance with ORC 1509.072 A.

1662502015 2014-01-29 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Sidewinder Drilling Rig #121 had drilled an 8.75 inch diameter hole to the depth of 6804 feet and were tripping out of the hole to pick up directional tools to go back in and begin drilling their curve. Site inspection revealed no violations.
610382373 2014-1-16 0:00: DD No Violations 0.50
814928780 2019-11-6 0:00: PW No Violations 1.00

For data sources see[9]