34-067-21126

Well Details

Well ID: 34-067-21126
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Athens Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-000604
Farm/Lease Name: WAGNER
License Status: Producing
License Date: 2013-03-13
Spud Date: 2013-02-08
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2013-07-22
Well Total Depth: 16265.00 ft
Configuration: Horizontal
Latitude: 40.170000
Longitude: -81.070000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-01-29 Proposed Formations:TRENTON, Issued Date:1/29/2013, Expired Date:1/29/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-03-13 Proposed Formations:POINT PLEASANT, Issued Date:3/13/2013, Expired Date:3/13/2015 12:00:00 PM, Drilling unit acres:901.685, Proposed Well Type:OG, Proposed Well Class:EOUT
Correction to Well 2013-06-28 UNIT SIZE CHANGED TO 912.254 ACRES.
Reached Total Depth 2013-07-22
Completion Report Received 2013-11-06
Correction to Well 2013-11-29 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Construction Permit Expires 2015-03-13
Record Last Modified 2017-10-24

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/16/2013 08/26/2013 8570 8,555,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh water Stingray Carrier Water 7732-18-5 100 81.4294 0
FR-403 Weatherford Friction Reducer Distillates, Petroleum, Hydrotreated Light 64742-47-8 20 0.0106 0
Sodium Chloride 7647-14-5 20 0.0106 0
Water 7732-18-5 60 0.0318 0
BioClear 5000 Weatherford Biocide Water 7732-18-5 95 0.02108 0
2,2-dibromo-3-nitril oprop ionam ide 10222-01-2 5 0.00111 0
Clean Gel Stingray Guar Gel Solvent naphtha, (petroleum) 64742-96-7 65 0.07373 0
heavy aliphatic NA 35 0.0397 0
Hydrochloric Acid 10 -15% Stingray Acid Hydrochloric Acid NA 15 0.06555 0
Water 7732-18-5 85 0.37145 0
OB-2 Stingray Breaker Ammonium persulfate 7727-54-0 75 0.0071 0
Silica, Crystalline-Quartz 14808-60-7 10 0.00095 0
Cured acrylic resin NA 16 0.00151 0
30/50 White Minerva/Cadiz Proppant Sand 14808-60-7 100 0 0
100 mesh Minerva/Cadiz Proppant Sand 14808-60-7 100 3.12753 0
Acid Inhibitor Stingray Corossion Inhibitor Water 7732-18-5 40 0.00049 0
Proprietary polycarboxylic acid mixture NA 60 0.00073 0
FRS 51 Weatherford Non-Emulsifier Water 7732-18-5 42.5 0.01549 0
N-dodecyl-2-pyrrolid one 2687-96-9 2.5 0.00091 0
Alcohols, C6-C12, ethoxylated 68439-45-2 15 0.00547 0
Methyl Alcohol 67-56-1 40 0.01458 0
40/70 White Minerva/Cadiz Proppant Sand 14808-60-7 100 14.7594 0
ScaleClear 112 Weatherford Scale Inhibitor Polymer Based NA 100 0.00099 0
Per Break Stingray Breaker Ammonium Persulfate 7727-54-0 99 0.00982 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-08-19 H2O 15 288078 Gal 530000 STINGRAY PRESSURE PUMPING LLC STAGE 11, 60 SHOTS
2013-08-22 H2O 15 300846 Gal 582400 STINGRAY PRESSURE PUMPING LLC STAGE 16, 60 SHOTS
2013-08-24 H2O 15 297066 Gal 585645 STINGRAY PRESSURE PUMPING LLC STAGE 21, 60 SHOTS
2013-08-18 H2O 15 284844 Gal 532000 STINGRAY PRESSURE PUMPING LLC STAGE 7, 60 SHOTS
2013-08-25 H2O 15 307230 Gal 551107 STINGRAY PRESSURE PUMPING LLC STAGE 25, 60 SHOTS
2013-08-24 H2O 15 216552 Gal 282000 STINGRAY PRESSURE PUMPING LLC STAGE 20, 60 SHOTS
2013-08-17 H2O 15 281610 Gal 520320 STINGRAY PRESSURE PUMPING LLC STAGE 2, 60 SHOTS
2013-08-20 H2O 15 298536 Gal 525884 STINGRAY PRESSURE PUMPING LLC STAGE 15, 60 SHOTS
2013-08-26 H2O 15 329700 Gal 713905 STINGRAY PRESSURE PUMPING LLC STAGE 28, 60 SHOTS
2013-08-24 H2O 15 402864 Gal 546000 STINGRAY PRESSURE PUMPING LLC STAGE 23, 60 SHOTS
2013-08-23 H2O 15 191814 Gal 286850 STINGRAY PRESSURE PUMPING LLC STAGE 19, 60 SHOTS
2013-08-25 H2O 15 326340 Gal 544000 STINGRAY PRESSURE PUMPING LLC STAGE 24, 60 SHOTS
2013-08-25 H2O 15 485016 Gal 1035315 STINGRAY PRESSURE PUMPING LLC STAGE 26, 60 SHOTS
2013-08-17 H2O 15 289590 Gal 550960 STINGRAY PRESSURE PUMPING LLC STAGE 1, 60 SHOTS
2013-08-23 H2O 15 264600 Gal 409400 STINGRAY PRESSURE PUMPING LLC STAGE 17, 60 SHOTS
2013-08-20 H2O 15 286104 Gal 533000 STINGRAY PRESSURE PUMPING LLC STAGE 14, 60 SHOTS
2013-08-17 H2O 15 289716 Gal 574204 STINGRAY PRESSURE PUMPING LLC STAGE 3, 60 SHOTS
2013-08-18 H2O 15 273672 Gal 542000 STINGRAY PRESSURE PUMPING LLC STAGE 8, 60 SHOTS
2013-08-24 H2O 15 327432 Gal 547812 STINGRAY PRESSURE PUMPING LLC STAGE 22, 60 SHOTS
2013-08-18 H2O 15 282996 Gal 534016 STINGRAY PRESSURE PUMPING LLC STAGE 9, 60 SHOTS
2013-08-19 H2O 15 285432 Gal 529000 STINGRAY PRESSURE PUMPING LLC STAGE 12, 60 SHOTS
2013-08-19 H2O 15 280896 Gal 531823 STINGRAY PRESSURE PUMPING LLC STAGE 13, 60 SHOTS
2013-08-17 H2O 15 283500 Gal 536179 STINGRAY PRESSURE PUMPING LLC STAGE 5, 60 SHOTS
2013-08-23 H2O 15 276192 Gal 522630 STINGRAY PRESSURE PUMPING LLC STAGE 18, 60 SHOTS
2013-08-25 H2O 15 465360 Gal 1036700 STINGRAY PRESSURE PUMPING LLC STAGE 27, 60 SHOTS
2013-08-18 H2O 15 283500 Gal 532000 STINGRAY PRESSURE PUMPING LLC STAGE 6, 60 SHOTS
2013-08-17 H2O 15 310590 Gal 536368 STINGRAY PRESSURE PUMPING LLC STAGE 4, 60 SHOTS
2013-08-18 H2O 15 305298 Gal 532840 STINGRAY PRESSURE PUMPING LLC STAGE 10, 60 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 GULFPORT ENERGY CORPORATION 803766 4983 88
2014 GULFPORT ENERGY CORPORATION 1350829 2806 323
2015 GULFPORT ENERGY CORPORATION 779149 1127 357
2016 GULFPORT ENERGY CORPORATION 622075 116 364
2017 GULFPORT ENERGY CORPORATION 443460 179 363
2018 GULFPORT ENERGY CORPORATION 328693 97 362
2019 GULFPORT ENERGY CORPORATION 68823 18 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 GULFPORT ENERGY CORPORATION Brine 20239 88
2014 GULFPORT ENERGY CORPORATION Brine 12768 323
2015 GULFPORT ENERGY CORPORATION Brine 1131 357
2016 GULFPORT ENERGY CORPORATION Brine 2361 364
2017 GULFPORT ENERGY CORPORATION Brine 2992 363
2018 GULFPORT ENERGY CORPORATION Brine 2354 362
2019 GULFPORT ENERGY CORPORATION Brine 504 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1221050576 2013-10-7 0:00: PW No Violations 1.50
-1258686648 2014-1-21 0:00: PL No Violations 0.50
-1521875306 2013-9-18 0:00: PW No Violations 2.00
-422109928 2013-8-21 0:00: PW No Violations 4.50
-466472862 2017-9-6 0:00:0 PW No Violations 1.00
-709254200 2013-6-20 0:00: CS No Violations 5.70
0188138094 2013-08-22 Production Wells No Violations I am on site today and met with Hal Miller to review the repairs to the containment pad and to check on a further leaks. I found that the containment is partly repaired and it has a vacuum line to remove the fluid before it runs over the containment berm. There is still fluid leaking out from under the containment pad which is also being contained with the vac. The old cuttings on site are going to be removed after the work over portion of the well is complete.
0245910050 2013-10-22 Production Wells No Violations On the day of my inspection I witnessed that the clean-up was completed of the contaminated area and per request seed and straw were in place for erosion control.
0422109928 2013-08-21 Production Wells Violations Noted I am on site today to check on the repairs to the containment liner. I found that all of the fluid running under the liner has not stopped but increased. I collected quantab samples and found chloride in 450 to 500 PPM range. I contacted Hal Miller of Gulfport Energy and he is in route to my location. I also contacted Deputy Chief Bob Worstall and he said for me to have Kyle Tharp help with samples. Bob is concerned that the well site is on Mine fill and could be leaking out and under the drilling pad. During my inspection I found that the soil samples which were to have been removed are still on site. The cuttings were buried on site two years ago after the drilling was complete on first well. The Division was not notified that the cuttings were on site and I was informed that they would be removed the same day I was notified. Hul and Associates to send Oil & Gas a copy of the maps, and all material results. Kyle Tharp collected samples and will transport them to the Cambridge lab for testing.
0466472862 2017-09-06 Production Wells No Violations On the day of my inspection I found the Wagner wellpad to contain three properly labeled texas style wellheads. 200 psi on surface casing and no pressure for intermediate casing. Production equipment includes four horizontal seperators, four 400 barrel steel tanks, a 50 barrel steel brine tank, and a combustor. Production records current in RBDMS.
0709254200 2013-06-20 Casing String Witnessed No Violations I am on site today to witness the running and the cementing of the 16 inch diameter casing string. Patterson Drilling Rig # 56 has drilled a 20 inch diameter hole to 315 ft and set 305 ft of casing. Universal Cementing Service c/w 500 sks of class A. Could not get casing to bottom and had to be pulled out and the wellbore conditioned. Returned the next morning after casing was ready to cement and did get 25 bbls of good cement returns.
0714257823 2013-09-16 Production Wells No Violations There is a service rig over the well today running tubing and pulling tubing. The containment appears to be in place and holding at this time. The cuttings which are buried on site are being removed today. The cuttings which are from the # 1 well are 50% removed at this time. Hull Associates on site to test to make sure all of the cuttings are removed. I will return next day to verify as well.
0788920601 2013-08-26 Production Wells No Violations I arrived today to check on the status of the leak coming out from under the containment and off the end of the containment. The leak area which was sampled has reduced some. The leak from off the end of the containment is on going. It has red dye in it and I tested it with for chlorides and found it at 160 PPM or below. I advised Hal Miller that the containment was still leaking and that there was red dye running down the road. The operation on this well is almost complete and we will be able soon to pull back the containment and see where the leaks began.
1221050576 2013-10-07 Production Wells No Violations Met with Hal Miller and Rick Triple on site to review the clean up of buried cutting which are being removed. The cuttings have been removed to a landfill and now the area which was below that area needs to be tested for chlorides. If the area tests are near normal then the entire area can be back filled and graded.
1258686648 2014-01-21 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to 1509.072A.
1316927101 2013-08-29 Production Wells No Violations I am on site today meeting with Hal Miller. Hal wanted to meet to go over the containment changes which they would like to make. At this time the containment is leaking in several places and needs pulled up. They want to move the tanks to flow back into to an area where the containment is good and complete the work on the wells. I advised that the tanks could be moved from the area where we know the containment needs repaired to another good area. After the work on the wells is complete in two days all of the containment is to be removed. I also advised that if the poor containment area was pulled up when I could not witness and document that somebody would need to collect photos and provide ODNR with those photos. Hal Miller advised that he would collect photos if I could no be on site to witness.
1375967765 2013-08-08 Production Wells No Violations I am on site today because I received a call from Gulfport to advise me that during the installation of the production line they found oil base mud around the tin horn. I am on site today to make sure all of the oil base is removed. I advised them to dig a trench then flush the area with freshwater and vacuum up any residue.
1521875306 2013-09-18 Production Wells No Violations I am on site today to check on the clean up of cuttings which are buried on site. I found that the well has a coil tubing unit working on the well with a wire line truck. I met Hal Miller of Gulfport on site to go over the clean up of the cuttings. Hull and Associates are on site as well to collect samples to make sure all of the cuttings have been removed. They are about 70% complete with the removal of the cuttings.
1523229284 2013-10-22 Production Wells No Violations I am on site today to check on the operation status of the well and to review the clean up of the spill which occurred 08/21/2013. I found that the well is in production and that the clean up of the site has been complete. The site also had some cutting buried on site which I had advised the operator to move. Those cuttings have been removed the area has been graded and seeded along with mulch for cover. The violation has been corrected.
188138094 2013-8-22 0:00: PW No Violations 2.00
245910050 2013-10-22 0:00 PW No Violations 1.00
714257823 2013-9-16 0:00: PW No Violations 1.50
788920601 2013-8-26 0:00: PW No Violations 2.00

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0422109928 US-OH-124497 2013-08-22 Well operation causing pollution and contamination

For data sources see[9]