X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21125

Well Details

Well ID: 34-067-21125
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Moorefield Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-000513
Farm/Lease Name: RYSER
License Status: Producing
License Date: 2013-02-11
Spud Date: 2013-03-08
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2013-05-28
Well Total Depth: 14336.00 ft
Configuration: Horizontal
Latitude: 40.210000
Longitude: -81.200000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-01-11 Proposed Formations:POINT PLEASANT, Issued Date:1/11/2013, Expired Date:1/11/2015 12:00:00 PM, Drilling unit acres:511.058, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2013-02-11 Proposed Formations:POINT PLEASANT, Issued Date:2/11/2013, Expired Date:2/11/2015 12:00:00 PM, Drilling unit acres:511.058, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-05-28
Completion Report Received 2014-02-06
Correction to Well 2014-03-27 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. CHANGE IN TARGET ELEVATION AND UNIT SIZE INCREASED TO 1107.017 ACRES.
Construction Permit Expires 2015-02-11
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-02-06 8888 0
8888 0
8888 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/18/2013 09/18/2013 7909 13,933,100.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid 10 -15% Stingray Acid Water 7732-18-5 85 0.30924 0
Hydrochloric Acid NA 15 0.05457 0
BioClear 5000 Weatherford Biocide Water 7732-18-5 95 0.02345 0
2,2-dibromo-3-nitril oprop ionam ide 10222-01-2 5 0.00123 0
Acid Inhibitor Stingray Corossion Inhibitor Water 7732-18-5 40 0.00081 0
Proprietary polycarboxylic acid mixture NA 60 0.00122 0
FR-403 Weatherford Friction Reducer Distillates, Petroleum, Hydrotreated Light 64742-47-8 20 0.0189 0
Water 7732-18-5 60 0.05669 0
Sodium Chloride 7647-14-5 20 0.0189 0
30/50 White Minerva/Cadiz Proppant Sand 14808-60-7 100 0 0
OB-2 Stingray Encapsulated Breaker Cured acrylic resin Trade Secret 16 0.00049 0
Ammonium persulfate 7727-54-0 75 0.0023 0
Silica, Crystalline-Quartz 14808-60-7 10 0.00031 0
Fresh water Stingray Carrier Water 7732-18-5 100 88.0479 0
Clean Gel Stingray Guar Gel heavy aliphatic NA 35 0.01068 0
Solvent naphtha, (petroleum) 64742-96-7 65 0.01984 0
FRS 51 Weatherford Non-Emulsifier Water 7732-18-5 42.5 0.01649 0
N-dodecyl-2-pyrrolid one 2687-96-9 2.5 0.00097 0
Alcohols, C6-C12, ethoxylated 68439-45-2 15 0.00582 0
Methyl Alcohol 67-56-1 40 0.01552 0
100 mesh Minerva/Cadiz Proppant Sand 14808-60-7 100 0.11558 0
Per Break Stingray Persulfate Breaker Ammonium Persulfate 7727-54-0 99 0.00351 0
40/70 White Minerva/Cadiz Proppant Sand 14808-60-7 100 11.2745 0
ScaleClear 112 Weatherford Scale Inhibitor Polymer Based NA 100 0.00107 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-10-04 H2O 28 306016 Gal 309790 STINGRAY PRESSURE PUMPING LLC STAGE 40, 60 SHOTS
2013-09-19 H2O 28 280728 Gal 424000 STINGRAY PRESSURE PUMPING LLC STAGE 2, 60 SHOTS
2013-10-03 H2O 28 395745 Gal 338378 STINGRAY PRESSURE PUMPING LLC STAGE 34, 60 SHOTS
2013-09-30 H2O 28 392393 Gal 457472 STINGRAY PRESSURE PUMPING LLC STAGE 19 AND 20, 60 SHOTS
2013-10-02 H2O 28 340259 Gal 370298 STINGRAY PRESSURE PUMPING LLC STAGE 30, 60 SHOTS
2013-09-20 H2O 28 313555 Gal 426000 STINGRAY PRESSURE PUMPING LLC STAGE 7, 60 SHOTS
2013-10-05 H2O 28 316764 Gal 375000 STINGRAY PRESSURE PUMPING LLC STAGE 42, 60 SHOTS
2013-10-02 H2O 28 333694 Gal 314688 STINGRAY PRESSURE PUMPING LLC STAGE 29, 60 SHOTS
2013-09-19 H2O 28 731388 Gal 425104 STINGRAY PRESSURE PUMPING LLC STAGE 1, 60 SHOTS
2013-09-28 H2O 28 264449 Gal 72160 STINGRAY PRESSURE PUMPING LLC STAGE 13, 60 SHOTS
2013-10-06 H2O 28 319166 Gal 375634 STINGRAY PRESSURE PUMPING LLC STAGE 44, 60 SHOTS
2013-10-03 H2O 28 275020 Gal 278320 STINGRAY PRESSURE PUMPING LLC STAGE 33, 60 SHOTS
2013-10-01 H2O 28 273218 Gal 323942 STINGRAY PRESSURE PUMPING LLC STAGE 22, 60 SHOTS
2013-10-04 H2O 28 316747 Gal 377710 STINGRAY PRESSURE PUMPING LLC STAGE 38, 60 SHOTS
2013-09-27 H2O 28 219408 Gal 162000 STINGRAY PRESSURE PUMPING LLC STAGE 11, 60 SHOTS
2013-10-02 H2O 28 22146 Gal 170520 STINGRAY PRESSURE PUMPING LLC STAGE 28, 60 SHOTS
2013-10-03 H2O 28 245692 Gal 241280 STINGRAY PRESSURE PUMPING LLC STAGE 32, 60 SHOTS
2013-10-05 H2O 28 308797 Gal 377000 STINGRAY PRESSURE PUMPING LLC STAGE 43, 60 SHOTS
2013-10-04 H2O 28 330183 Gal 377580 STINGRAY PRESSURE PUMPING LLC STAGE 41, 60 SHOTS
2013-10-01 H2O 28 281156 Gal 313450 STINGRAY PRESSURE PUMPING LLC STAGE 25, 60 SHOTS
2013-09-20 H2O 28 341477 Gal 412500 STINGRAY PRESSURE PUMPING LLC STAGE 6, 60 SHOTS
2013-10-01 H2O 28 327020 Gal 334870 STINGRAY PRESSURE PUMPING LLC STAGE 24, 60 SHOTS
2013-09-29 H2O 28 306159 Gal 448161 STINGRAY PRESSURE PUMPING LLC STAGE 15 AND 16, 60 SHOTS
2013-10-02 H2O 28 304277 Gal 385402 STINGRAY PRESSURE PUMPING LLC STAGE 31, 60 SHOTS
2013-10-01 H2O 28 272752 Gal 217281 STINGRAY PRESSURE PUMPING LLC STAGE 26, 60 SHOTS
2013-10-04 H2O 28 283324 Gal 393000 STINGRAY PRESSURE PUMPING LLC STAGE 37, 60 SHOTS
2013-09-29 H2O 28 294991 Gal 187000 STINGRAY PRESSURE PUMPING LLC STAGE 14, 60 SHOTS
2013-10-04 H2O 28 323522 Gal 389502 STINGRAY PRESSURE PUMPING LLC STAGE 39, 60 SHOTS
2013-09-28 H2O 28 237649 Gal 276190 STINGRAY PRESSURE PUMPING LLC STAGE 12, 60 SHOTS
2013-09-20 H2O 28 291148 Gal 407624 STINGRAY PRESSURE PUMPING LLC STAGE 8, 60 SHOTS
2013-09-19 H2O 28 332858 Gal 425068 STINGRAY PRESSURE PUMPING LLC STAGE 5, 60 SHOTS
2013-09-21 H2O 28 297696 Gal 423682 STINGRAY PRESSURE PUMPING LLC STAGE 10, 60 SHOTS
2013-09-20 H2O 28 279199 Gal 428400 STINGRAY PRESSURE PUMPING LLC STAGE 9, 60 SHOTS
2013-10-03 H2O 28 282274 Gal 264146 STINGRAY PRESSURE PUMPING LLC STAGE 35, 60 SHOTS
2013-10-06 H2O 28 309124 Gal 369000 STINGRAY PRESSURE PUMPING LLC STAGE 47, 60 SHOTS
2013-10-04 H2O 28 262370 Gal 196188 STINGRAY PRESSURE PUMPING LLC STAGE 36, 60 SHOTS
2013-10-02 H2O 28 334324 Gal 377500 STINGRAY PRESSURE PUMPING LLC STAGE 27, 60 SHOTS
2013-10-06 H2O 28 332783 Gal 374740 STINGRAY PRESSURE PUMPING LLC STAGE 45, 60 SHOTS
2013-09-19 H2O 28 317675 Gal 424000 STINGRAY PRESSURE PUMPING LLC STAGE 3, 60 SHOTS
2013-10-01 H2O 28 270253 Gal 334870 STINGRAY PRESSURE PUMPING LLC STAGE 23, 60 SHOTS
2013-09-30 H2O 28 505697 Gal 441000 STINGRAY PRESSURE PUMPING LLC STAGE 17 AND 18, 60 SHOTS
2013-09-30 H2O 28 247363 Gal 203512 STINGRAY PRESSURE PUMPING LLC STAGE 21, 60 SHOTS
2013-09-19 H2O 28 360570 Gal 429995 STINGRAY PRESSURE PUMPING LLC STAGE 4, 60 SHOTS
2013-10-06 H2O 28 322778 Gal 368590 STINGRAY PRESSURE PUMPING LLC STAGE 46, 60 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 GULFPORT ENERGY CORPORATION 120303 25755 59
2014 GULFPORT ENERGY CORPORATION 730313 91851 349
2015 GULFPORT ENERGY CORPORATION 242377 16606 336
2016 GULFPORT ENERGY CORPORATION 211584 14913 364
2017 GULFPORT ENERGY CORPORATION 155234 9061 356
2018 GULFPORT ENERGY CORPORATION 148893 6362 357
2019 GULFPORT ENERGY CORPORATION 33333 1608 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 GULFPORT ENERGY CORPORATION Brine 14504 59
2014 GULFPORT ENERGY CORPORATION Brine 32705 349
2015 GULFPORT ENERGY CORPORATION Brine 15481 336
2016 GULFPORT ENERGY CORPORATION Brine 3895 364
2017 GULFPORT ENERGY CORPORATION Brine 3959 356
2018 GULFPORT ENERGY CORPORATION Brine 3542 357
2019 GULFPORT ENERGY CORPORATION Brine 824 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1193883210 2013-12-10 0:00 PL No Violations 1.00
-2119952976 2017-8-22 0:00: PW No Violations 1.00
-226106071 2018-12-13 0:00 PW No Violations 1.00
-290735820 2020-3-6 0:00:0 PW No Violations 1.00
-613294482 2019-12-10 0:00 PW No Violations 1.00
0019359868 2013-03-14 Drill / Deepen / Reopen No Violations I am on site today to see if the well has been drilled out and a cement bond log completed to locate the top of the cement on the back side of the casing. During my inspection I found that they are at 1000 ft drilling out cement.
0226106071 2018-12-13 Production Wells No Violations On the day of my inspection I was accompanied by Deputy Chief Bob Worstall and Inspector John Fleming. This pad contains four properly labeled producing wellheads. Production equipment includes twelve 400 barrel steel tanks in their own polymer lined steel containment, one 50 barrel steel tank, four GPUs, four sand seperators, and a combustor. Surface annular pressure is 0 and intermediate annular pressure is 0. Production records are current in RBDMS.
1193883210 2013-12-10 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to 1509.072A.
1322042829 2013-03-15 Drill / Deepen / Reopen No Violations I am on site today to conduct a remedial cement job on the 10-3/4 inch diameter casing. On the last job - 03/13/2013 Yost Drilling Rig # 3 set 1724 ft of casing and Stingray Cement Service c/w 1080 sks of Class A cement. The cement job was not complete because the cement could not be circulated to surface. The cement was drilled out and a cement bond log found the top of the cement in the annular space at 980 ft. 1-1/4 inch diameter tubing was installed t to 960 ft and Stingray Cementing Service circulated cement to surface. The number of sacks used to fill the annular space was 680 sks.
1363171489 2013-03-13 Drill / Deepen / Reopen No Violations I am on site today to witness the running and the cementing of the 10-3/4 inch diameter casing string. Yost Drilling Rig # 3 drilled a 14-3/4 inch diameter hole to 1730 ft and set 1724 ft of casing. Stingray Cementing Service c/w 1080 sks of class A - 15.6 lb cement. The casing is being cemented without a cement head and the swedge will need removed and a wiper plug inserted. After that was done Stingray could not get any circualation because the cement had set up. Yost Drilling did try to move casing up and down and found out it has been cemented in place. Next they will need to drill out the cement and log the well. After the find out the top of the cement in the annulus tubing will be installed to fill it back to surface.
1365612163 2013-04-10 Drill / Deepen / Reopen No Violations I am on site today to check on the drilling status of Yost Drilling # 7 During my inspection I discovered that they have drilled to 6103 ft and are now stuck in the hole. They have backed off one joint above the drill collars at 5785 ft. The drill collars and the 9-7/8 inch diameter drilling bit remain in the well bore. The plan is to run in with a fish grapple and grab the drill pipe. Then while connected with tension run inside and perf holes in the drill collars and try and establish circulation. They will have to jar loose almost 100 ft of fill on the back side. I am worried that the depth and weight for that rig will brake the drilling line when the jars go off multiples of times. The rig is next to two high pressure wells which are in production. If the drilling line comes apart and the blocks fall down it could impact the two wells. I contacted Chad Shoffner and advised him of my concerns. Chad said that he would contact their office and get the approval to shut the wells in while the jars are in use.
1541356625 2013-09-18 Production Wells No Violations The well is set up to frac. I am here to check on the containment and did not find any leaks at this time.
19359868 2013-3-14 0:00: DD No Violations 1.50
2119952976 2017-08-22 Production Wells No Violations On the day of my inspection I found this pad to have four producing wells, twelve 400 barrel steel tanks, four gas production units and four sand seperators. Surface and intermediate annulas has no pressure.

For data sources see[10]

References