X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21100

Well Details

Well ID: 34-067-21100
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: North Township
Operator Name: GEOPETRO LLC
Well Pad ID: US-OH-000558
Farm/Lease Name: REESE/CRAMBLETT
License Status: Producing
License Date: 2013-03-12
Spud Date: 2012-09-26
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2013-03-06
Well Total Depth: 14393.00 ft
Configuration: Horizontal
Latitude: 40.400000
Longitude: -81.120000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-09-24 Proposed Formations:POINT PLEASANT, Issued Date:9/24/2012, Expired Date:9/24/2014 12:00:00 PM, Drilling unit acres:533.1316, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-03-06 MOST RECENT PLAT BELIEVED TO BE PROPOSED LOCATION-LATERALS EXTENDED. CHANGED STATUS OF PLAT TO PROPOSED LOCATION-ALE 04/14/17 UPDATED PLAT RCVD 5-10-17 ALE.
APP 2013-03-12 Proposed Formations:POINT PLEASANT, Issued Date:3/12/2013, Expired Date:3/12/2015 12:00:00 PM, Drilling unit acres:547.6282, Proposed Well Type:OG, Proposed Well Class:
Correction to Well 2013-03-15 CHANGE IN SURFACE INFORMATION: FOOTAGE AND CHANGE IN TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY PLAT. NO CHANGE IN UNIT SIZE.
Construction Permit Expires 2015-03-12 MOST RECENT PLAT BELIEVED TO BE PROPOSED LOCATION-LATERALS EXTENDED. CHANGED STATUS OF PLAT TO PROPOSED LOCATION-ALE 04/14/17 UPDATED PLAT RCVD 5-10-17 ALE.
Completion Report Received 2016-01-15 MOST RECENT PLAT BELIEVED TO BE PROPOSED LOCATION-LATERALS EXTENDED. CHANGED STATUS OF PLAT TO PROPOSED LOCATION-ALE 04/14/17 UPDATED PLAT RCVD 5-10-17 ALE.
Correction to Well 2017-05-19 UPDATE TARGET/TAKEPOINT/ACREAGE PER AS-DRILLED PLAT RCVD 5-10-17 ALE.
Record Last Modified 2017-10-23 MOST RECENT PLAT BELIEVED TO BE PROPOSED LOCATION-LATERALS EXTENDED. CHANGED STATUS OF PLAT TO PROPOSED LOCATION-ALE 04/14/17 UPDATED PLAT RCVD 5-10-17 ALE.

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/01/2013 05/26/2013 7771 2,747,430.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCL Acid (12.6%-18.0%) U.S. Well Services Bulk Acid Water 7732-18-5 87.5 1.2202 287832
Hydrogen Chloride 7647-01-0 18 0.29147 68753.6
EZ-Encap L U.S. Well Services Gel Breakers Crystalline Silica, quartz 14808-60-7 15 0.00023 54
Hemicellulase 9025-56-3 2.5 0.00004000 9
Glycerine 56-81-5 2.5 0.00004000 9
LGC-15 U.S. Well Services Gelling Agents Guar Gum 9000-30-0 50 0.09762 23027.9
Suspending agent (solid) 14808-60-7 3 0.01493 3521.92
Petroleum Distillates 64742-47-8 60 0.09245 21808.8
Surfactant 68439-51-0 3 0.00586 1381.67
Sand U.S. Well Services Proppant Crystalline Silica, quartz 14808-60-7 100 1.04311 246058
XL-101 U.S. Well Services Crosslinker Sodium tetraborate pentahydrate 12179-04-3 20 0.00972 2292
Potassium Hydroxide 1310-58-3 15 0.00048 113.25
Glycerine 56-81-5 40 0.01345 3173.54
Water Atlas Energy Carrier/Base Fluid Water 7732-18-5 100 97.1371 22,913,600.0
AI-300 U.S. Well Services Acid Corrosion Inhibitors 2-Butoxyethanol 111-76-2 15 0.00082 193.87
Cinnamaldehyde 104-55-2 15 0.00094 222.488
N,N-Dimethylformamide 68-12-2 20 0.00108 253.616
1-Octanol 111-87-5 3 0.00015 35.7186
1-Decanol 112-30-1 5 0.00025 59.5309
Poly(oxy-1,2-ethanediyl), alpha-(4-nolylphenyl)-omega-hydroxy,

branched

127087-87-0 5 0.00032 75.3102
Ethylene Glycol 107-21-1 40 0.00348 820.523
Isopropyl Alcohol 67-63-0 2.5 0.00012 28.3668
Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 15 0.00093 219.475
AP One U.S. Well Services Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00148 350
WFRA-405 U.S. Well Services Friction Reducer Water 7732-18-5 60 0.03337 7871.29
Hydrated light distillate (petroleum) 64742-47-8 30 0.01368 3227.23
2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.01668 3935.65

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 ATLAS NOBLE LLC 24667 10069 113
2014 ATLAS NOBLE LLC 116236 18790 365
2015 ATLAS NOBLE LLC 61394 10529 363
2016 ATLAS NOBLE LLC 49974 8390 365
2017 ATLAS NOBLE LLC 41961 5748 362
2018 ATLAS NOBLE LLC 58847 7036 363
2019 ATLAS NOBLE LLC 13915 1471 92

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 ATLAS NOBLE LLC Brine 5315 113
2014 ATLAS NOBLE LLC Brine 7487 365
2015 ATLAS NOBLE LLC Brine 1892 363
2016 ATLAS NOBLE LLC Brine 1855 365
2017 ATLAS NOBLE LLC Brine 1867 362
2018 ATLAS NOBLE LLC Brine 3207 363
2019 ATLAS NOBLE LLC Brine 432 92

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1997245029 2017-8-24 0:00: PL No Violations 1.00
-2031076724 2019-6-26 0:00: PW No Violations 2.00
-917751553 2020-7-20 0:00: PW No Violations 1.00
1203896083 2020-4-22 0:00: PW No Violations 1.00
1351597318 2012-10-29 Drill / Deepen / Reopen No Violations I am on site this morning to witness the running and cementing of the 18 5 /8 Surface Casing string. I was advised that they would be ready at 8:00 am today. During my inspection this moring it was determined that casing would be cemented later today around 2 pm. I did return around 3 pm and found that the job was still running behind and would now be after 5 pm. Around 6 pm I received a phone from H&P 285 asking if they could set the minimum casing of 300 ft. I advised that they could. I was then advised that the cementers would be hooked up shortly and would begin cementing A.S.A.P. I returned to the site to witness the cementing and remained on site for several more hours. When I left they were not hooked up to cement the well and they felt it would be only a few more hours.
1406286192 2020-4-15 0:00: PW No Violations 1.50
1786919112 2012-10-06 Drill / Deepen / Reopen No Violations I am on site today to witness the running and cementing of the conductor string. Lightning Well Service set 100 ft of 24 inch conductor. Petroset Cementing used 80 sks of Class A to cement casing. Had good returns
1943278237 2019-6-25 0:00: PW No Violations 2.00
1997245029 2017-08-24 Preliminary Restoration No Violations
427206204 2019-6-24 0:00: PW No Violations 1.00
625808129 2020-6-1 0:00:0 PW No Violations 1.00
793949120 2019-7-18 0:00: PW No Violations 1.00

For data sources see[8]

References