X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21068

Well Details

Well ID: 34-067-21068
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Stock Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000335
Farm/Lease Name: HENDERSON SOUTH 10-12-6
License Status: Producing
License Date: 2012-03-19
Spud Date: 2012-11-04
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2012-11-19
Well Total Depth: 13867.00 ft
Configuration: Horizontal
Latitude: 40.350000
Longitude: -81.130000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-03-19 Proposed Formations:POINT PLEASANT, Issued Date:3/19/2012, Expired Date:3/19/2014 12:00:00 PM, Drilling unit acres:153.24, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2012-03-23 CORRECTION TO TARGET X COORDINATE.
Reached Total Depth 2012-11-19
Correction to Well 2013-04-12 CORRECTION TO TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 140.99 ACRES.
Completion Report Received 2013-09-25
Construction Permit Expires 2014-03-19
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-09-30 8417 13667 504
8417 13667 504
8417 13667 504

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/13/2013 01/13/2013 7934.00 3,861,396.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Carrier/Base Fluid Water 7732-18-5 100.00 77.67
Recycled Produced Water Carrier/Base Fluid Water 7732-18-5 100.00 4.87
Acid, Hydrochloric 15pct, A264,

B244, B317, J218, J475, J580, J609, J610, L058, L071, S001, W054, 100 Mesh Sand, Northern White Sand

Schlumberger Acid, Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, KCl Substitute, Non-Emulsifier, Scale Inhibitor, Proppant - Natural Alkenes, C>10 .alpha.- 64743-02-8 0.00034000 0.00006000
Calcium chloride 10043-52-4 0.03 0.00574000
Talc 14807-96-6 0.00008000 0.00001000
Octamethylcyclotetrasiloxane 556-67-2 0.00001000 0.00001000
Guar gum 9000-30-0 0.41 0.07
Vinylidene chloride/methylacrylate copolymer 25038-72-6 0.00161000 0.00028000
Ammonium sulfate 7783-20-2 0.04 0.00836000
Thiourea polymer 68527-49-1 0.00167000 0.00028000
Dodecamethylcyclohexasiloxane 540-97-6 0.00001000 0.00001000
Ethylenediaminetetraacetic acid tetrasodium salt hydrate 64-02-8 0.00011000 0.00002000
Peroxydisulfuric acid, diammonium salt 7727-54-0 0.01 0.00310000
Silica, amorphous 7631-86-9 0.00163000 0.00028000
Dimethyl polysiloxane 63148-62-9 0.00005000 0.00001000
Quartz 14808-60-7 97.60 16.66
Boric acid, dipotassium salt 1332-77-0 0.06 0.01
Oxyalkylated nonyl phenolic resin 30846-35-6 0.02 0.00510000
Sodium chloride 7647-14-5 0.00060000 0.00010000
2-Propenoic acid, 2-methyl-, polymer

with sodium 2-methyl-2-((1-oxo-2- propen-1-yl)amino)-1-propanesulfonate (1:1)

136793-29-8 0.00555000 0.00095000
Acrylamide-sodium-2-acrylamido-2-methlypropane

sulfonate copolymer

38193-60-1 0.05 0.00885000
Solvent naphtha, petroleum, heavy arom. 64742-94-5 0.02 0.00345000
Alcohols, C7-9-iso-, C8-rich, ethoxylated 78330-19-5 0.04 0.00683000
Propargyl alcohol 107-19-7 0.00052000 0.00009000
Glutaraldehyde 111-30-8 0.03 0.00548000
Water 7732-18-5 2.19 0.38
Hydrochloric acid 7647-01-0 0.88 0.15
Potassium hydroxide 1310-58-3 0.02 0.00387000
Ethoxylated C14-15 alcohols 68951-67-7 0.00077000 0.00013000
Methanol 67-56-1 0.22 0.03
Decamethylcyclopentasiloxane 541-02-6 0.00001000 0.00001000
Urea 57-13-6 0.00341000 0.00058000
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 0.01 0.00338000
Alcohols, C9-11-iso-, C10-rich, ethoxylated 78330-20-8 0.04 0.00683000
Sodium erythorbate 6381-77-7 0.00399000 0.00068000
Sodium sulfate 7757-82-6 0.02 0.00361000
Quaternary ammonium compounds,

benzyl-C10-16-

68989-00-4 0.01 0.00338000
Silica, amorphous precipitated 67762-90-7 0.00001000 0.00001000
Trisodium phosphate 7601-54-9 0.00386000 0.00066000
Potassium chloride 7447-40-7 0.00198000 0.00034000
Choline chloride 67-48-1 0.39 0.06
Sodium hydroxide 1310-73-2 0.00001000 0.00001000
Polyethylene glycol 25322-68-3 0.00889000 0.00152000
Ethylene glycol 107-21-1 0.00110000 0.00019000
Naphthalene 91-20-3 0.00404000 0.00069000
Fatty acids, tall-oil 61790-12-3 0.00202000 0.00035000

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-01-19 H2O 15 6382 Bbl 452901 Schlumberger stage 14, 36 shots
2013-01-14 H2O 15 5841 Bbl 451220 Schlumberger stage 3, 36 shots
2013-01-17 H2O 15 7644 Bbl 447681 Schlumberger stage 8, 36 shots
2013-01-14 H2O 15 5924 Bbl 451693 Schlumberger stage 2, 36 shots
2013-01-19 H2O 15 6017 Bbl 457681 Schlumberger stage 13, 36 shots
2013-01-18 H2O 15 5494 Bbl 449301 Schlumberger stage 12, 36 shots
2013-01-17 H2O 15 6202 Bbl 447681 Schlumberger stage 9, 36 shots
2013-01-18 H2O 15 5082 Bbl 445861 Schlumberger stage 11, 36 shots
2013-01-15 H2O 15 6224 Bbl 456590 Schlumberger stage 5, 36 shots
2013-01-17 H2O 15 6256 Bbl 452941 Schlumberger stage 10, 36 shots
2013-01-13 H2O 15 6624 Bbl 454559 Schlumberger stage 1, 36 shots
2013-01-16 H2O 15 5835 Bbl 457120 Schlumberger stage 7, 36 shots
2013-01-14 H2O 15 6042 Bbl 451001 Schlumberger stage 4, 36 shots
2013-01-16 H2O 15 5645 Bbl 452000 Schlumberger stage 6, 36 shots

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC 214413 38609 187
2014 CHESAPEAKE EXPLORATION LLC 159723 23683 277
2015 CHESAPEAKE EXPLORATION LLC 122162 16560 344
2016 CHESAPEAKE EXPLORATION LLC 93878 11271 366
2017 CHESAPEAKE EXPLORATION LLC 74864 7940 333
2018 CHESAPEAKE EXPLORATION LLC 71379 7635 365
2019 CHESAPEAKE EXPLORATION LLC 24608 1541 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 CHESAPEAKE EXPLORATION LLC Brine 9733 187
2014 CHESAPEAKE EXPLORATION LLC Brine 3192 277
2015 CHESAPEAKE EXPLORATION LLC Brine 2249 344
2016 CHESAPEAKE EXPLORATION LLC Brine 2893 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1779 333
2018 CHESAPEAKE EXPLORATION LLC Brine 1327 365
2019 CHESAPEAKE EXPLORATION LLC Brine 416 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1068370986 2013-9-26 0:00: PL No Violations 0.50
0780628708 2017-10-12 Production Wells No Violations On the day of my inspection I found the pad to contain two plunger lift wells. Production equipment includes eight 400 barrel production tanks, two vertical seperators, two GPUs, one combustor, one compressor and a vapor recovery system. .
1068370986 2013-09-26 Preliminary Restoration No Violations On the Day of my inspection the site passed preliminary restoration according to 1509.072A.
1076251250 2020-2-12 0:00: PW No Violations 1.00
1352147766 2012-11-05 Drill / Deepen / Reopen No Violations I am on site today to witness the running and cementing of the 13 3/8 surface casing string. Nomac Rig # 39 ran 592 ft of casing in a 17.5 inch well. Halliburton is on site to cement the casing. Halliburton circulated 30 barrels of good cement returns back to surface and into the 1/2 tanks.
1858048456 2016-02-22 Preliminary Restoration No Violations I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted are utilizing a plunger lift system. RBDMS production records indicate that the wells are in production.
The production equipment on the pad consists of the following:

8 400 bbl. Production tanks 2 Producing wells 2 Sand separators

2 Horizontal heater-treaters 1 combustor 1 compressor 1 Low pressure separator tower/Vapor recovery system unit. The site passed preliminary restoration in accordance with ORC 1509.072 A.

585617186 2019-11-4 0:00: PW No Violations 1.00
780628708 2017-10-12 0:00 PW No Violations 1.00

For data sources see[10]

References