Well Details

Well ID: 34-067-21061
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Monroe Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: MENDENHALL
License Status: Producing
License Date: 2011-08-12
Spud Date: 2011-12-01
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2011-12-09
Well Total Depth: 5572.00 ft
Configuration: Vertical
Latitude: 40.390000
Longitude: -81.260000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-08-12 Proposed Formations:CLINTON/MEDINA, Issued Date:8/12/2011, Expired Date:8/11/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2011-12-09
Completion Report Received 2012-04-06
Construction Permit Expires 2013-08-11
Change of Owner 2017-10-17 Operator changed from 6866, ATLAS NOBLE LLC to 8685, M & R INVESTMENTS OHIO LLC
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-04-13 5370 5380 60
5370 5380 60
5370 5380 60

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-02-15 H2O 8 217576 Gal 100000 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 ATLAS NOBLE LLC 5428.00 5926.00 303
2013 ATLAS NOBLE LLC 8806.00 3531.00 365
2014 ATLAS NOBLE LLC 5445.00 3154.00 365
2015 ATLAS NOBLE LLC 8444.00 3154.00 365
2016 ATLAS NOBLE LLC 8120.00 3463.00 366
2017 ATLAS NOBLE LLC 3603.00 1706.00 182
2018 M & R INVESTMENTS OHIO LLC 3767.00 2383.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 ATLAS NOBLE LLC Brine 4066 303
2013 ATLAS NOBLE LLC Brine 867 365
2014 ATLAS NOBLE LLC Brine 1011 365
2015 ATLAS NOBLE LLC Brine 743 365
2016 ATLAS NOBLE LLC Brine 331 366
2017 ATLAS NOBLE LLC Brine 282 182
2018 M & R INVESTMENTS OHIO LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1204311871 2019-12-23 0:00 PW No Violations 1.00
-2021530608 2016-7-7 0:00:0 PW No Violations 1.00
-600241612 2013-7-24 0:00: PL No Violations 1.00
0084327255 2016-08-29 Production Wells No Violations On the day of my inspection I witnessed the well is utilizing a pump-jack for means of production. The well bore consist of 8.625 inch diameter surface casing, 4.5 inch diameter production casing, 2.375 inch diameter production tubing and pump assembly components. A prime mover is in place and the well was pumping at the time of my inspection. Production equipment for the well bore consists of a 210 barrel production tank, a 30 barrel brine tank and a horizontal separator with a 2 inch diameter meter run. The meter chart indicated the well was in producing order. All production equipment is placed in a dike that measures approximately 40*50 feet at an average height of 3 foot around the perimeter. Also placed in the dike is the production equipment for permitted well number 3406720969. RBDMS records indicate the well is in production and no violations were noticed with the conduction of my inspection.
0600241612 2013-07-24 Preliminary Restoration No Violations Everything passed according to 1509.072A.
1453483716 2016-01-22 Production Wells No Violations

-up process was in place. Atlas used the mini excavator to build a dike around the area of the spill and dig a 3 foot deep by 2 foot wide by 5 foot long pit to contain the oil. After witnessing the spill I then place a call back to Terry White to conform the information Chris had given me. Terry stated that Atlas would need to provide a manifest sheet and to use lime/ fertilizer after the clean-up process was completed to neutralize the impacted area. After speaking to Terry I then forwarded the information to Chris. While on site I witnessed the clean-up process which included, a tanker truck used to vacuum the oil from the pit and then placed the oil inside a production tank that was already present on location, Atlas employees steam cleaning all contaminated production equipment and the use of a d

1453825330 2016-01-25 Production Wells No Violations On the day of my inspection following up on a release that occurred 1/25/2016, I witnessed the remediation of the spill has been fully accessed. I could not see any visual signs of pollution or contamination. All production equipment was cleaned and peat-sorb was placed in the areas affected by the spill after the clean-up was conducted.
2021530608 2016-07-07 Production Wells No Violations The well is being produced into a 210 bbl. Production tank, 50 bbl. brine storage tank along with a horizontal separator inside a dike. The well is operating using a pump jack rods and 2 3/8 inch diameter tubing.
84327255 2016-8-29 0:00: PW No Violations 1.00

For data sources see[9]